Subsequent License Renewal Eric R. Oesterle, Chief License Renewal Projects Branch (MRPB) Place logo Division of Materials and License Renewal (DMLR) or company name here Office of Nuclear Reactor Regulation (NRR)
SUBSEQUENT LICENSE RENEWAL Eric Oesterle, Chief License Renewal Project Branch (MRPB)
Division of Materials and License Renewal (DMLR)
Office of Nuclear Reactor Regulation (NRR)
August 7, 2018 2
Overview
- SLRA Guidance
- Preparing for NRC review of SLRA
- Lessons Learned from review of first SLRA 3
SLRA Guidance
- 2008 - 2011 - international workshops on LTO
- 2011-2014 - collected proposed changes to technical guidance
- SECY 14-0016 and SRM - no rulemaking
- 2014 - expert panel meetings
- 2015 - draft guidance documents published
- Feb. 2017 - engaged ACRS on draft guidance 4
SLRA Guidance (cont.)
- July 2017 - published final SLRA guidance o Final GALL-SLR (NUREG-2191, Vols. 1 and 2) o SRP-SLR (NUREG-2192)
- December 2017 - Published companion documents o NUREG-2221 (Technical Bases for Changes in the Subsequent License Renewal Guidance Documents, NUREG-2191 and NUREG-2192), and o NUREG-2222 (Disposition of Public Comments on the Draft Subsequent License Renewal Guidance Documents, NUREG-2191 and NUREG-2192) 5
SLRA Guidance (cont.)
- December 2017 - NRC issues interim endorsement letter for NEI guidance o NEI 17-01, Industry Guidance for Implementing the Requirements of 10 CFR Part 54 for Subsequent License Renewal, Rev. 0 o NEI 17-04, Model SLR New and Significant Assessment Approach for SAMA, Rev. 0
- NRC currently revising regulatory guidance to endorse NEI guidance o RG 1.188 to endorse NEI 17-01 o RG 4.2 to endorse NEI 17-04 6
SLRA Guidance (cont.)
- New GALL-SLR AMPs
- Fluence Monitoring
- High Voltage Insulators
- Deleted AMPs
- Feedwater nozzle and control rod drive return line nozzle
- Withdrawal and testing of at least one reactor vessel surveillance capsule addressing the subsequent PEO (if specified criteria not already met) 7
SLRA Guidance (cont.)
- A plant-specific analysis for inspection of PWR reactor vessel o to address differences from first license renewal period to subsequent license renewal period
- Expanded AMPSs for Electrical Insulation of Cables from one to three o to address aging of submerged cables at different voltages
- Aging management of concrete o Updated for alkali-silica reaction o Added further evaluation for irradiation of concrete
- Added over 1035 new items to GALL-SLR tables 8
Preparing for NRC Review
- Communicate with NRC - frequently / timely
- Communicate w/other applicants / prospective
- Peer reviews
- Review most recent NRC RAIs
- Ensure internal application consistency
- Address NRC concerns from previous reviews (ML17353A035)
- Facilitate the NRCs review 9
Preparing for NRC Review
- Pre-Submittal Meetings
- Environmental at least 12 months prior to submittal
- Safety at least 6 months prior to submittal
- Referencing unapproved Topical Reports or unapproved methodologies
- Proprietary information
- Portal for documentation
- Update program for consistency with GALL-SLR and SRP-SLR 1
0
Review Process Changes
- Piloted on River Bend license renewal review
- Pre-submittal meetings
- SLRA acceptance review performed by technical staff assigned to review v. tiger team approach
- 18 month schedule begins upon SLRA acceptance for docketing 1
1
Review Process Changes
- Applicant provides access to electronic portal (no later than acceptance of the SLRA in order to support the review schedule)
- Aging Management Audits (Safety) o Offsite Aging Management Program Operating Experience Audit o In-Office Aging Management Audit via telecom/webinar breakout sessions o On-Site Aging Management Audit with regional participation to walk down specific material conditions and plant configurations 1
2
Review Process Changes
- Documents and meetings o Draft SEIS public meeting if necessary (environmental) o Streamlined SER process o Advisory Committee on Reactor Safeguards (ACRS) meetings on safety review - only one ACRS Subcommittee meeting o ACRS Full Committee meeting scheduled within two months following SC meeting 1
3
Lessons Learned Review of first SLRA
- Proprietary Application
- Proprietary Information
- review of prop info must be completed before application can be made public
- resulted in delays beginning acceptance review
- issues raised challenged timely acceptance review
- Issues raised potentially impacted review schedule
- review schedule begins upon docketing 1 4
Lessons Learned Review of first SLRA
- Frequent communication
- Application content
- Topical report references
- use of unapproved methodologies
- ensure sufficient detail for SER conclusion
- OpE Audit successful
- Environmental audit coordination
- Portal issues 1
5
Lessons Learned Review of first SLRA Q&A 1
6