Subsequent License Renewal Eric R. Oesterle, Chief License Renewal Projects Branch (MRPB) Place logo Division of Materials and License Renewal (DMLR) or company name here Office of Nuclear Reactor Regulation (NRR)

SUBSEQUENT LICENSE RENEWAL Eric Oesterle, Chief License Renewal Project Branch (MRPB)

Division of Materials and License Renewal (DMLR)

Office of Nuclear Reactor Regulation (NRR)

August 7, 2018 2

Overview

  • Preparing for NRC review of SLRA
  • Lessons Learned from review of first SLRA 3

SLRA Guidance

  • 2008 - 2011 - international workshops on LTO
  • 2011-2014 - collected proposed changes to technical guidance
  • 2014 - expert panel meetings
  • 2015 - draft guidance documents published
  • Feb. 2017 - engaged ACRS on draft guidance 4

SLRA Guidance (cont.)

SLRA Guidance (cont.)

SLRA Guidance (cont.)

  • Fluence Monitoring
  • High Voltage Insulators
  • Withdrawal and testing of at least one reactor vessel surveillance capsule addressing the subsequent PEO (if specified criteria not already met) 7

SLRA Guidance (cont.)

  • Expanded AMPSs for Electrical Insulation of Cables from one to three o to address aging of submerged cables at different voltages
  • Aging management of concrete o Updated for alkali-silica reaction o Added further evaluation for irradiation of concrete
  • Added over 1035 new items to GALL-SLR tables 8

Preparing for NRC Review

  • Communicate with NRC - frequently / timely
  • Communicate w/other applicants / prospective
  • Peer reviews
  • Review most recent NRC RAIs
  • Ensure internal application consistency
  • Ensure CLB issues are addressed prior to SLRA
  • Address NRC concerns from previous reviews (ML17353A035)
  • Facilitate the NRCs review 9

Preparing for NRC Review

  • Pre-Submittal Meetings
  • Environmental at least 12 months prior to submittal
  • Safety at least 6 months prior to submittal
  • Referencing unapproved Topical Reports or unapproved methodologies
  • Proprietary information
  • Portal for documentation
  • Update program for consistency with GALL-SLR and SRP-SLR 1

0

Review Process Changes

  • SLR Application (SLRA) review optimization effort identified several changes
  • Pre-submittal meetings
  • 18 month schedule begins upon SLRA acceptance for docketing 1

1

Review Process Changes

  • Applicant provides access to electronic portal (no later than acceptance of the SLRA in order to support the review schedule)

2

Review Process Changes

  • Documents and meetings o Draft SEIS public meeting if necessary (environmental) o Streamlined SER process o Advisory Committee on Reactor Safeguards (ACRS) meetings on safety review - only one ACRS Subcommittee meeting o ACRS Full Committee meeting scheduled within two months following SC meeting 1

3

Lessons Learned Review of first SLRA

  • Proprietary Application
  • Proprietary Information
  • review of prop info must be completed before application can be made public
  • Issues raised potentially impacted review schedule
  • review schedule begins upon docketing 1 4

Lessons Learned Review of first SLRA

  • Frequent communication
  • Application content
  • Topical report references
  • use of unapproved methodologies
  • ensure sufficient detail for SER conclusion
  • OpE Audit successful
  • Environmental audit coordination
  • Portal issues 1

5

Lessons Learned Review of first SLRA Q&A 1

6