UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 6, 2017 Mr. William F. Maguire Site Vice President Entergy Operations, Inc.
River Bend Station, Unit 1 5485 U.S. Highway 61 N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 -
SUMMARY
OF THE LICENSE RENEWAL APPLICATION REVIEW SEVERE ACCIDENT MITIGATION ALTERNATIVES SITE AUDIT (EPID L-2017-LNE-0026)
Dear Mr. Maguire:
A review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) and an NRC contractor from Pacific Northwest National Laboratories participated in a severe accident mitigation alternatives (SAMA) site audit from October 23-25, 2017, at River Bend Station, Unit 1 (RBS), as part of the license renewal application environmental review.
The goal of the audit was to review documentation and gather information to ensure that the environmental requirements for license renewal, as codified in Title 10 of the Code of Federal Regulations Part 51 were met. A letter dated October 13, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17284A100) was sent to you containing an audit plan. The enclosure is a list of those who participated in the audit.
The audit began on October 23, 2017, with an entrance meeting to introduce participants and discuss audit logistics. Next, participants discussed the following topics relative to the SAMA analysis: (1) Level 1 internal events Probabilistic Risk Assessment (PRA), (2) Level 2 model PRA, (3) external events, (4) Level 3 consequence analysis, (5) identification and screening of potential SAMAs, (6) cost-benefit analysis of SAMAs, and (7) potential lower cost alternative SAMAs.
At the conclusion of the site audit, the NRC staff summarized the status of the review with Entergy representatives during the exit meeting. Most of the NRCs questions identified in the audit plan or during the audit were answered through the conduct of the audit. Those that were not will be answered by Entergy, as it responds to a request for additional information (RAI) letter (ADAMS Accession No. ML17317A002).
W.
If you have any questions on this matter, please contact David Drucker by telephone at 301-415-6223 or by e-mail at David.Drucker@nrc.gov.
Sincerely,
/RA/
Eric R. Oesterle, Chief License Renewal Projects Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosure:
As stated cc w/encls: Distribution via Listserv
ML17324A506 OFFICE PM:MRPB:DMLR LA: MRPB:DMLR BC: MRPB:DMLR NAME DDrucker YEdmonds EOesterle DATE 12/5/2017 11/29/2017 12/6/2017
Enclosure RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION REVIEW SEVERE ACCIDENT MITIGATION ALTERNATIVES SITE AUDIT October 23-25, 2017 PARTICIPANT ORGANIZATION Jerry Dozier U.S. Nuclear Regulatory Commission (NRC)
Ben Beasley NRC Steve Short NRC/Pacific Northwest National Laboratories (NRC/PNNL)
Bob Schmidt NRC/PNNL Rick Buckley Entergy Operations, Inc. (Entergy)
Paul A. Sicard Entergy Lori Potts Iepson Consulting Enterprises Gary Smith Enercon Jeffrey Leary Enercon