Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20069E65318 March 1983Forwards Revised Final Draft Responses to Selected Commission 820825 & 1005 Questions Re Fire Protection,Leak Rate Testing & ESF Sys.Proposed Resolution Discussion Items EnclSafe Shutdown
ML20070C8043 December 1982Forwards Proprietary Portion of Amend 11 to GESSAR-II Re Pra.Affidavit for Withholding Only EnclProbabilistic Risk Assessment
ML20070D1063 December 1982Forwards Nonproprietary Amend 11 to Gessar Ii,Revising App 15D,Section 3, PRA of BWR/6 Std Plant. Proprietary Version Only Encl & Withheld (Ref 10CFR2.790)Probabilistic Risk Assessment
ML20070E97915 December 1982Summarizes 821214 Meeting Discussions Between NRC & GE Re Status of GESSAR-II Final Design Approval (Fda) Review
ML20070H27517 December 1982Forwards Response to Mechanical Engineering Branch Draft SER Questions.Remaining Responses Will Be Completed by 830114. Amend Scheduled for Jan 1983 Will Formalize Responses Requiring Changes to FacilitySafe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Finite Element Analysis
Earthquake
ML20070H32817 December 1982Forwards Final Draft Responses to Radiation Assessment Branch,Effluent Treatment Sys Branch,Auxiliary Sys Branch & Power Sys Branch 820825 Info Request
ML20070L44827 December 1982Forwards Final Draft Responses to Reactor Sys Branch Questions Raised at Commission 821115 Info Request. Responses to Core Performance Branch Questions to Be Provided 2 Wks After Second Ge/Nrc Meeting
ML20070N72821 January 1983Forwards Draft Responses to Instrumentation & Control Sys Branch 821005 Request for Addl Info.Gessar Amend Scheduled for Feb 1983 to Formalize ResponsesSafe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Safe Shutdown Earthquake
Temporary Modification
Scram Discharge Volume
Feedwater Controller Failure
ML20070R24825 January 1983Forwards Rev to Gessar Chapter 15 Re Radiological Dose Calculations for Inside Containment Loca.Rev Demonstrates Capability of Suppression Pool to Retain Particulate Fission ProductsFuel cladding
ML20070S40019 January 1983Forwards Amend 13 to 238 GE Ssar,Amending GESSAR-II by Correcting Rev Designation of Proprietary Pages Provided Under Amend 1.Nonproprietary Version Not Included
ML20070S40819 January 1983Forwards Proprietary Portion of Amend 13,replacing Proprietary Pages of Amend 1 to Ssar.Encl Withheld (Ref 10CFR2.790)
ML20070U1208 February 1983Forwards Draft Responses to NRC 830131 Request for Addl Info Re GESSAR-II
ML20070V4259 February 1983Forwards Info Re GE Response to Gessar II Question 490.01, Re Fuel Rod Cladding & Deformation Per M Tokar Request at 830125 & 26 MeetingsFuel cladding
ML20071B64722 February 1983Commits to Review Each Human Engineering Discrepancy in Apps a & B of Gessar II SER Identified During 821211-13 Control Room Design Audit at Black Fox Simulator
ML20071C7033 March 1983Forwards Listing of Major NSSS & Balance of Plant Documents Supporting Gessar II Design,Including Equipment Vendor Independent Documents Reviewed by Mechanical & Structural Engineering Branches During AuditsFLEX
ML20071D6749 March 1983Forwards Revised Final Draft Responses to NRC 820825 & 1115 Requests & Mechanical Engineering Branch SER Meetings.Draft Revs to Reg Guides 1.31 & 1.44 EnclTornado Missile
Hydrostatic
Tornado Generated Missile
Earthquake
ML20071E2749 March 1983Documents Agreements on Credit for Suppression Pool Scrubbing in GESSAR-II,Chapter 15 Re Radiological Dose Calculations.Potential Decontamination Capability Provided by Scrubbing Will Be RecognizedFuel cladding
ML20071J69320 April 1982Clarifies Significance of Thermal Operating Limits Specified in App 6A of Gessar Ii.App 6A Transmitted on 820225 Contains Technical Basis for BWR LOCA Decay Heat Correlation Based on Ansi/Ans 5.1-1979 Revised Decay Heat Std
ML20071N53524 May 1983Forwards Amend 15 to Application for Review of Amend 15 to GESSAR-II,consisting of Proprietary & Nonproprietary Portions.Proprietary Portion Withheld (Ref 10CFR2.790) & Submitted Under Separate Cover
ML20071N69824 May 1983Forwards Proprietary Portion Amend 15 to GESSAR-II Re Human Factors Sys Analysis Emergency Procedures.Info Withheld (Ref 10CFR2.79)
ML20071P88922 December 1982Forwards Final Draft Responses to Commission 821005 Info Request Re GESSAR-II.Instrumentation & Control Sys Branch Responses Will Be Provided Following Ge/Nrc Meeting in Jan 1983
ML20071Q7267 June 1983Forwards Draft Amend 17 to GESSAR-II Re CP/multi-plant Licensing & SRP RulesProbabilistic Risk Assessment
ML20072B6613 March 1983Requests Review of Gessar Ii,Section 3.11 in Parallel W/ Current Review of NEDE-24326-1-P, GE Environ Qualification Program. Marked-up Proposed Plan Encl
ML20072D33917 March 1983Forwards Revised Draft Responses to 821005 Info Request Re GESSAR-II
ML20072F55523 March 1983Forwards Revised Draft Responses to Discussion Items & Questions from NRC Power Sys Branch,Containment Sys Branch, Instrumentation & Control Sys Branch & QA Sys Branch Re GESSAR-IIUltimate heat sink
ML20072H46415 June 1983Forwards Proprietary Amend 16 to GESSAR-II,describing Design Considerations to Reduce Sabotage Risk.Amend Withheld (Ref 10CFR2.790)
ML20072H48915 June 1983Forwards Nonproprietary Amend 16 to GESSAR-II,providing Assessment of Design Features Which Reduce Sabotage Risk
ML20072H51815 June 1983Forwards Amend 17 to GESSAR-II,furnishing New App 1G & Revised Section 1.8 & Clarifying Discrepancies in Text
ML20072L40129 March 1983Forwards Supplemental Response to Instrumentation & Control Sys Branch Question on Manual Initiation of Safety Sys & Proposed Resolution of Meteorology & Effluent Treatment Branch Discussion Items
ML20073B5908 April 1983Forwards GESSAR-II Action Plan for Resolving J Humphrey Containment Design Issues for Review.Balance of Info to Be Completed by 830722
ML20073G64414 April 1983Forwards Revised Draft Responses to Power Sys Branch, Containment Sys Branch,Matls Engineering Branch & Structural & Geotechnical Engineering Branch Questions Re 238 Nuclear Island GESSAR-II
ML20073J89415 April 1983Forwards Proposed Resolutions to Selected Outstanding Issues
ML20073R06129 April 1983Provides Statement of GE Objectives for Final Design Approval in Light of Current Commission Proposed Policy Statement on Severe Accidents.Acrs Review of Gessar II SER (NUREG-0979) RecommendedProbabilistic Risk Assessment
ML20073T0715 May 1983Forwards Proposed Resolution of Containment Sys & Instrumentation & Control Sys Branches Outstanding SER Issues Re Gessar II
ML20076C81818 May 1983Forwards marked-up Revised Response to Question 460.09 of NRC 820825 Request Re GESSAR-II Std SAR
ML20076D88924 May 1983Forwards Supplemental Responses to Power Sys Branch Questions Re GESSAR-II Ac/Dc Power sys/balance-of-plant Interfaces.Responses Will Be Included W/Amend 15 to SER
ML20076D89424 May 1983Forwards Draft Amend 15 to GESSAR-II.Amend Resolves Selected Outstanding & Confirmatory Issues Identified in SER (NUREG-0979) & Completes Subsection 1.9.1 on GESSAR-II/FSAR InterfacesSafe Shutdown
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Emergency Lighting
Tornado-Generated Missile
Abnormal operational transient
Tornado Missile Protection
Scram Discharge Volume
Process Control Program
Earthquake
Power-Operated Valves
Power Operated Valves
Turbine Missile
Fuel cladding
ML20076F47322 August 1983Informs That GESSAR-II Drywell Structure Drawings Requested by BNL Transmitted to M Reisch.Drawings Will Be Used in Review of PRA Re Containment Structural Sys pressure- Carrying Capacity
ML20076L4429 September 1983Forwards Supplemental Containment Vessel Dimensions Needed for BNL to Conduct Review of GESSAR-II PRA Re Containment Structural Sys pressure-carrying Assessment
ML20077B68518 July 1983Forwards Amend 18 to GESSAR-238,incorporating Re post-accident Monitoring instrumentation, Re Question 410.24 of NRC 820815 Request for Addl Info & Summary of Measures to Avoid Stress Corrosion Cracking
ML20077G52222 July 1983Forwards Proprietary Amend 19 to GESSAR-II Re Human Factors. Discussion of Methodology GE Will Employ to Environmentally Qualify safety-related Equipment Provided.Affidavit for Withholding Info (Ref 10CFR2.790) Encl
ML20077G71622 July 1983Forwards Nonproprietary Amend 19 to GESSAR-II,updating Section 3.11 on Environ Qualification & Responding to Outstanding Issue 3 to Gessar II SER,NUREG-0979
ML20079K14419 January 1984Forwards Proprietary Info Supporting Gessar II Seismic Fragility Analysis Requested at 840109 & 10 Meetings in San Jose,Ca.Info Withheld (Ref 10CFR2.790)
ML20079R67431 January 1984Forwards Proprietary Draft Amend to Gessar Ii,Supporting Leak Before Break Approach.Submittal Extends Leak Before Break Approach Only to Recirculation Sys Piping.Affidavit Encl.Rept Withheld (Ref 10CFR2.790)
ML20080A85426 July 1983Forwards GESSAR-II Responses to Action Plan for Resolving Containment Design Issues,In Response to . Affidavit for Withholding Proprietary Info Encl.Portions Withheld
ML20080C10417 August 1983Forwards Impell Corp two-vol Rept, Confirmatory Soil- Structure Interaction Analysis for GESSAR-II, in Response to SER Confirmatory Issue 3.Rept Will Be Incorporated Into GESSAR-II by Amend
ML20080H25414 September 1983Forwards Proprietary Response to NRC 830902 Request for Addl Info Re Severe Accident Portion of Gessar Ii.Responses to Questions 720.98,720.99,720.100 & 720.101 Will Be Provided by 831015.Response Withheld (Ref 10CFR2.790)
ML20080K76421 September 1983Forwards Proprietary GESSAR-II Seismic Event Analysis, in Response to NRC Draft Policy Statement on Severe Accidents. Analysis Withheld (Ref 10CFR2.790)
ML20080U5474 October 1983Forwards Proprietary Rev 20 to GESSAR-II Re Environ Qualification of safety-related Equipment.Rev Should Be Withheld (Ref 10CFR2.790).Affidavit Encl
ML20081A2734 October 1983Forwards Amend 20 to GESSAR-II,responding to Confirmatory Issue 18 of Ser,Suppl 1 to NUREG-0979,revised Responses to NRC Re Communication & Lighting Sys & Updating Interface Tables of Subsection 1.9.1