ML12257A086 | 20 September 2012 | Review of the 2011 Refueling Outage System Generator Tube Inservice Inspection Report | |
ML12293A451 | 22 October 2012 | ACRS Assessment of the Quality of Selected NRC Research Projects- Fy 2012 | Probabilistic Risk Assessment Design basis earthquake Earthquake |
ML13172A009 | 1 July 2013 | Nd 2, Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3) Concerning Significant Emergency Core Cooling System Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation | Fuel cladding |
ML13179A015 | 31 May 2013 | Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code | |
ML14002A145 | 19 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Frazil ice Battery sizing Earthquake |
ML14043A444 | 12 February 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Surry Power Station, Units 1 and 2, TAC Nos.: MF1002 and MF1003 (Revision 2) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Frazil ice Battery sizing Earthquake |
ML14079A018 | 27 February 2014 | 30-Day Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 | |
ML14086A173 | 9 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML14086A194 | 9 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML14092A414 | 31 March 2014 | Response to March 12, 2012 Information Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Design basis earthquake Earthquake |
ML14251A035 | 28 August 2014 | Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation |
ML15072A299 | 16 March 2015 | Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 | |
ML15078A287 | 12 March 2015 | Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 1 Through 2-114 | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
ML15078A288 | 12 March 2015 | Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML15078A289 | 12 March 2015 | Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-219 Through the End | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake FLEX Earthquake |
ML15097A078 | 7 April 2015 | Soarca Surry 2005 Site File | |
ML15244B205 | 24 August 2015 | Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report | |
ML15335A093 | 15 December 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML16355A172 | 20 December 2016 | Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review | High winds Hydrostatic |
ML17241A046 | 24 August 2017 | Submittal of Cycle 28 Startup Physics Tests Report | |
ML17251A900 | 5 June 2017 | Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 | |
ML17325A779 | 22 November 2017 | Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) | |
ML17339A175 | 7 September 2017 | Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. | Operating Basis Earthquake Finite Element Analysis Design basis earthquake |
ML18108A123 | 11 April 2018 | Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) | Nondestructive Examination Dissimilar Metal Weld |
ML18218A171 | 31 July 2018 | Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report | Loop seal Hydrostatic |
ML19011A172 | 4 January 2019 | Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Time to boil Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19011A173 | 4 January 2019 | Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19011A174 | 4 January 2019 | Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19093A131 | 5 June 1975 | Emergency Core Cooling System Analysis, Required by 10 CFR 50.46, for Surry Power Station Unit Nos. 1 & 2, Revised June 5, 1975 | Boric Acid Shutdown Margin Loop seal |
ML19093A135 | 11 April 1975 | Emergency Core Cooling System Analysis, Required by 10 CFR 50.46, Revised April 11, 1975 | Boric Acid Shutdown Margin Loop seal |
ML19093A170 | 31 May 1976 | 1 & 2 - ORO-4067-7 Thermal Effects of the Surry Nuclear Power Plant on the James River, Virginia, Part Vi. Results of Monitoring Physical Parameters. | |
ML19093A502 | 30 June 1977 | 06/01/1977 Submit Appendix 2.9 of the Appendix I Analysis. | |
ML19093A503 | 30 June 1977 | 07/12/1977 Appendix I Analysis | |
ML19093A504 | 12 July 1977 | 07/12/1977 Submit Appendices 2.5-A and 2.5-B of Appendix I Analysis. | |
ML19093A505 | 12 July 1977 | 07/12/1977 Submit Appendix I Cost/Benefit Analysis. | |
ML19093A510 | 29 October 1976 | 10/29/1976 Submit Large Break LOCA-ECCS Reanalysis. | Boric Acid Shutdown Margin Earthquake Fuel cladding |
ML19093A512 | 24 June 1975 | 06/24/1975 Final Report on Unit 1 Pressure Vessel Irradiation Capsule Program, Examination and Analysis of Capsule T | |
ML19093A558 | 26 August 1977 | Submit Large Break LOCA-ECCS Reanalysis. | Shutdown Margin Fuel cladding |
ML19093A563 | 22 September 1978 | Reactor Core Thermal Hydraulic Analysis Model Using LYNX1 and LYNX2 Computer Codes | |
ML19093A565 | 11 October 1977 | Pressure Mitigating Systems Transient Analysis Results | |
ML19093A566 | 30 September 1977 | Supplement to the July 1977 Report on Pressure Mitigating Systems Transient Analysis Results | |
ML19093A567 | 10 November 1978 | Revised Steam Generator Repair Program | |
ML19093B010 | 25 August 1977 | at 08/24/1977 Meeting, Agreed to Perform Additional Analytical Work & Provide with Additional Information Concerning Justification for Continued Operation of Surry Units 1 & 2 with Concern Relating to Net ... | |
ML19093B026 | 5 January 1978 | Special Reports S1-77-01 & S2-77-01 Enclosed for Information | Hydrostatic |
ML19093B048 | 17 February 1978 | Submit Requested Analytical Study to Justify Continued Use of Appropriately Adjusted Standard Design (Center-Peaked) Axial Power Shape as Limiting Shape in LOCA-ECCS Analysis | |
ML19093B062 | 28 December 1977 | Request for Lowering Service Water Temperature Limit of 25oF & Maximum Containment Air Partial Pressure Limit of 10.0 Psia Assigned to Surry Due to Unusual Cold Winter & Hot Summer in 1977 | |
ML19093B082 | 1 December 1977 | Response to a Letter of 09/14/1977 Regarding the Potential for a Boron Dilution Accident at Surry Unit Nos. 1 & 2 Due to Injection of Contents of Naoh Tank Into Reactor Coolant System | Shutdown Margin |
ML19094A246 | 4 November 1971 | Transmittal of Final Report Concerning the Operating License Review | Safe Shutdown Operating Basis Earthquake Design basis earthquake Earthquake |
ML19095A602 | 2 April 2019 | Enclosure 2 - SLRA Mark-Ups Change Notice 2 | Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Coatings Temporary Modification Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal Earthquake Control of Heavy Loads Biofouling EVT-1 Liquid penetrant Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld Power Uprate Measurement Uncertainty Recapture |
ML19098B449 | 5 July 1977 | Response to Letter of 5/20/1977, Furnishing Information Re Postulated Fuel Handling Accident in Containment & Submitting Revised Analysis Including Proposed Tech Spec |