Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML12257A08620 September 2012Review of the 2011 Refueling Outage System Generator Tube Inservice Inspection Report
ML12293A45122 October 2012ACRS Assessment of the Quality of Selected NRC Research Projects- Fy 2012Probabilistic Risk Assessment
Design basis earthquake
Earthquake
ML13172A0091 July 2013Nd 2, Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3) Concerning Significant Emergency Core Cooling System Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity DegradationFuel cladding
ML13179A01531 May 2013Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code
ML14002A14519 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
ML14043A44412 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Surry Power Station, Units 1 and 2, TAC Nos.: MF1002 and MF1003 (Revision 2)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
ML14079A01827 February 201430-Day Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46
ML14086A1739 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML14086A1949 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML14092A41431 March 2014Response to March 12, 2012 Information Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
ML14251A03528 August 2014Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Boric Acid
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
FLEX
Spent Fuel Pool Instrumentation
ML15072A29916 March 2015Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25
ML15078A28712 March 2015Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 1 Through 2-114Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
ML15078A28812 March 2015Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML15078A28912 March 2015Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-219 Through the EndSafe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
FLEX
Earthquake
ML15097A0787 April 2015Soarca Surry 2005 Site File
ML15244B20524 August 2015Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report
ML15335A09315 December 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force ReviewSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML16355A17220 December 2016Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation ReviewHigh winds
Hydrostatic
ML17241A04624 August 2017Submittal of Cycle 28 Startup Physics Tests Report
ML17251A9005 June 2017Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17
ML17325A77922 November 2017Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009)
ML17339A1757 September 2017Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L.Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
ML18108A12311 April 2018Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1)Nondestructive Examination
Dissimilar Metal Weld
ML18218A17131 July 2018Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing ReportLoop seal
Hydrostatic
ML19011A1724 January 2019Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up)Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Time to boil
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19011A1734 January 2019Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting DocumentsSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19011A1744 January 2019Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting DocumentsSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19093A1315 June 1975Emergency Core Cooling System Analysis, Required by 10 CFR 50.46, for Surry Power Station Unit Nos. 1 & 2, Revised June 5, 1975Boric Acid
Shutdown Margin
Loop seal
ML19093A13511 April 1975Emergency Core Cooling System Analysis, Required by 10 CFR 50.46, Revised April 11, 1975Boric Acid
Shutdown Margin
Loop seal
ML19093A17031 May 19761 & 2 - ORO-4067-7 Thermal Effects of the Surry Nuclear Power Plant on the James River, Virginia, Part Vi. Results of Monitoring Physical Parameters.
ML19093A50230 June 197706/01/1977 Submit Appendix 2.9 of the Appendix I Analysis.
ML19093A50330 June 197707/12/1977 Appendix I Analysis
ML19093A50412 July 197707/12/1977 Submit Appendices 2.5-A and 2.5-B of Appendix I Analysis.
ML19093A50512 July 197707/12/1977 Submit Appendix I Cost/Benefit Analysis.
ML19093A51029 October 197610/29/1976 Submit Large Break LOCA-ECCS Reanalysis.Boric Acid
Shutdown Margin
Earthquake
Fuel cladding
ML19093A51224 June 197506/24/1975 Final Report on Unit 1 Pressure Vessel Irradiation Capsule Program, Examination and Analysis of Capsule T
ML19093A55826 August 1977Submit Large Break LOCA-ECCS Reanalysis.Shutdown Margin
Fuel cladding
ML19093A56322 September 1978Reactor Core Thermal Hydraulic Analysis Model Using LYNX1 and LYNX2 Computer Codes
ML19093A56511 October 1977Pressure Mitigating Systems Transient Analysis Results
ML19093A56630 September 1977Supplement to the July 1977 Report on Pressure Mitigating Systems Transient Analysis Results
ML19093A56710 November 1978Revised Steam Generator Repair Program
ML19093B01025 August 1977at 08/24/1977 Meeting, Agreed to Perform Additional Analytical Work & Provide with Additional Information Concerning Justification for Continued Operation of Surry Units 1 & 2 with Concern Relating to Net ...
ML19093B0265 January 1978Special Reports S1-77-01 & S2-77-01 Enclosed for InformationHydrostatic
ML19093B04817 February 1978Submit Requested Analytical Study to Justify Continued Use of Appropriately Adjusted Standard Design (Center-Peaked) Axial Power Shape as Limiting Shape in LOCA-ECCS Analysis
ML19093B06228 December 1977Request for Lowering Service Water Temperature Limit of 25oF & Maximum Containment Air Partial Pressure Limit of 10.0 Psia Assigned to Surry Due to Unusual Cold Winter & Hot Summer in 1977
ML19093B0821 December 1977Response to a Letter of 09/14/1977 Regarding the Potential for a Boron Dilution Accident at Surry Unit Nos. 1 & 2 Due to Injection of Contents of Naoh Tank Into Reactor Coolant SystemShutdown Margin
ML19094A2464 November 1971Transmittal of Final Report Concerning the Operating License ReviewSafe Shutdown
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML19095A6022 April 2019Enclosure 2 - SLRA Mark-Ups Change Notice 2Boric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Coatings
Temporary Modification
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Control of Heavy Loads
Biofouling
EVT-1
Liquid penetrant
Pressure Boundary Leakage
Through Wall Leak
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
Measurement Uncertainty Recapture
ML19098B4495 July 1977Response to Letter of 5/20/1977, Furnishing Information Re Postulated Fuel Handling Accident in Containment & Submitting Revised Analysis Including Proposed Tech Spec