Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML06068059628 February 2005Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power UprateUltimate heat sink
ML06068059931 March 2001Bear Creek Reservoirs Land Management Plan
ML06072025323 May 1975May 23, 1975 - Final Summary Report Unit 2 StartupPower change
Flow Induced Vibration
ML0607202729 May 1977May 9, 1977 - Final Summary Report Unit 3 StartupShutdown Margin
Grab sample
Stroke time
Fuel cladding
Power change
Flow Induced Vibration
ML06072027330 November 1992a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities
ML06072029328 February 2005Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power UprateUltimate heat sink
ML06072035431 March 2006GE-NE-0000-0049-6652-01NP, Rev 0, General Electric Boiling Water Reactor Steam Dryer Scale Model Test Based Fluctuating Load Definition Methodology, March 2006 Benchmark ReportFinite Element Analysis
Flow Induced Vibration
ML0607204301 March 2006March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations.Hot Short
Safe Shutdown
Significance Determination Process
Thermoset
Exemption Request
Fire Protection Program
Backfit
ML06088041321 March 2006EPU Containment Overpressure Credit Risk Assessment, Rev. 1High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
ML06088046421 March 2006BFN EPU Containment Overpressure (COP) Credit Risk Assessment, Rev. 1High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
ML06107063230 April 2006Units 1, 2, & 3 - GENE-0000-0052-3661-01-NP, Test Report #1, Browns Ferry Nuclear Plant; Unit 1, Scale Model Test.
ML06130044131 May 2006C.D.I. Report 06-11, Rev 1, Hydrodynamic Loads on Browns Ferry, Unit 1 Steam Dryer to 200 Hz.
ML06130044331 May 2006GE-NE-0000-0053-7413-R0-NP, Browns Ferry, Units 1, 2 & 3 Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions.Finite Element Analysis
Earthquake
Flow Induced Vibration
ML06145039515 May 20060043-8325-SRLR, Revision 1, Supplemental Reload Licensing Report for Brown Ferry 1, Reload 6 Cycle 7, Cover Through Page 122Shutdown Margin
Anticipated operational occurrence
MELLLA
ML06145039715 May 20060043-8325-SRLR, Revision 1, Supplemental Reload Licensing Report for Brown Ferry 1, Reload 6 Cycle 7, Pages 123 Through EndSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
ML06167015112 June 2006Extended Power Uprate (EPU) - Reload Analysis ReportShutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
MELLLA
Fuel cladding
ML06209048210 July 2006BFN EPU Containment Overpressure (COP) Credit Risk Assessment, Rev. 2High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML06213034331 July 2006C.D.I. Report No. 06-11, Revision 2, Hydrodynamic Loads on Browns Ferry Nuclear Unit 1 Steam Dryer to 200 Hz.
ML06220027726 July 2006Technical Specifications (TS) Changes TS-431 & TS-418 - Extended Power Uprate (EPU) - Response to Round 7 Requests for Additional InformationVT-2
Finite Element Analysis
Flow Induced Vibration
ML06221010227 June 2006Technical Specifications (TS) Change TS-431 & TS-418 Extended Power Uprate (EPU) - Replacement Cooling TowerLicense Renewal
Power Uprate
ML06240047730 June 2006GENE-0000-0055-2994-R1-NP, Addendum to Browns Ferry Nuclear Plant Units 1, 2, and 3 Steam Dryer Stress, Dynamic, and Fatigue Analyses for EPU Conditions.
ML06251038531 May 2006Enclosure 3, Browns Ferry, Units 1, 2 & 3 - CDI Report No. 05-28P, Rev 1, Bounding Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements.
ML06279023231 August 2006Engineering Report, GE-NE-0000-0053-7413-R4-NP, Browns Ferry, Units 1, 2 and 3 - Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions.Finite Element Analysis
Earthquake
Flow Induced Vibration
ML06292015613 September 2006Rev 1 to Technical Specification, NPSH Transient Study RHR and Core Spray Pumps, E12.5.1296
ML0631004421 November 2006Supplemental Information - Changes to Instrumentation Surveillance Test Intervals and Allowed Out-of-Service TimesReactor Vessel Water Level
Half scram
Stroke time
Scram Discharge Volume
ML0631802432 November 2006Gnf Additional Information Regarding the Requested Changes to Technical Specification SLMCPR, Cycle 7Anticipated operational occurrence
Minimum Critical Power Ratio
ML06353003714 December 2006Core Operating Limits Report for Cycle 7 OperationShutdown Margin
ML07103039713 April 2007Status of Unit 1 Restart Issues, Revision 12Safe Shutdown
High winds
Reactor Vessel Water Level
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Emergency Lighting
License Renewal
Hardened vent
Fire Protection Program
Power Uprate
ML07115036923 April 2007Units 1, 2, & 3 - Submittal of Unit 1 Periodic Inspection Program for License Renewal Procedure in Fulfillment of License Renewal Commitment
ML0716501681 April 1999NEI Report: RCP Lube Oil Collection System Current Trend Abstract, April 1999 (Revision 1)Safe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Emergency Lighting
Exemption Request
Earthquake
Fire Protection Program
Fire Watch
ML07172018631 March 2006Enclosure 2 Technical Evaluation Report on the Seismic Portion of Browns Ferry Nuclear Plant Unit 1 Individual Plant Examination for External EventsSafe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
Aging Management
Design basis earthquake
Earthquake
Weak link
ML07172019731 October 2006Enclosure 3 Technical Evaluation Report on the High Winds, Floods, Transportation and Other (Hfo) External Events Portion of Browns Ferry Nuclear Plant Unit 1 Individual Plant Examination for External EventsSafe Shutdown
High winds
Tornado Generated Missile
ML07213037531 July 2007CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213038231 July 2007CDI Report No. 07-06NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 2 & 2 Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213038631 July 2007CDI Report No. 07-09NP, Revision 0, Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with Inclusion of a Low Frequency Hydrodynamic Contribution
ML07213040131 July 2007CDI Report No. 07-10NP, Revision 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry, Unit 2, Steam Dryer to 250 Hz
ML07213041531 July 2007CDI Report No. 07-11NP, Revision 0, Dynamics of BWR Steam Dryer Components
ML07213042931 July 2007C.D.I. Technical Memorandum No. 07-26NP, Revision 0, Comparison of Browns Ferry Unit 1 & Unit 2 Main Steam Line Strain Gage / Pressure Readings
ML07236026231 August 200707-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 1, Revision 0Finite Element Analysis
ML07236026331 August 200707-31NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 2 and 3, Revision 0Finite Element Analysis
ML07275004524 September 2007ANP-2631, Revision 0, Browns Ferry Unit 3 Cycle 14 Reload Analysis Report.Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
MELLLA
Fuel cladding
ML08101045330 April 2008CDI Report No. 08-07NP, Rev. 1, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer.Finite Element Analysis
Liquid penetrant
ML08101045431 March 2008CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed.Finite Element Analysis
ML08170029412 June 2008Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to ACRS Conclusions and Recommendations Regarding Containment Overpressure CreditSafe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Significance Determination Process
Earthquake
Fire Protection Program
ML08175008116 June 2008Encl. 6, Calculation Package 0006982.301, Extended Power Uprate Main Steam Line Strain Gage Vibration Monitoring, and Encl. 7, Response to Round 15 Group 4 and Round 17 Request for Additional InformationTime of Discovery
ML08175008330 June 2008Enclosure 8, CDI Report No. 08-15NP, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer and Tie-Bar Modifications, Revision 1Finite Element Analysis
Liquid penetrant
ML08175008430 June 2008Enclosure 9, CDI Report No. 08-04NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 1
ML08176025630 June 2008CDI Report No. 08-16NP, Stress Assessments of Brown Ferry Nuclear Unit 2 Steam Dryer with Tie Bar and Hood Modifications, Revision 0Finite Element Analysis
Liquid penetrant
ML08176026030 June 2008CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed, Revision 2
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change