Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20080J321 | 17 April 1981 | Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power Co | |
ML20080J661 | 18 August 1983 | Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulic & Mechanical Snubbers at Millstone Nuclear Power Station,Unit 2, Technical Evaluation Rept | |
ML20083D085 | 30 November 1983 | Review of the Byron/Braidwood Units 1 and 2 Auxiliary Feedwater System Reliability Analysis | |
ML20083Q711 | 4 March 1983 | Preliminary Investigation of Interconnected Sys Interactions for Safety Injection Sys of Indian Point 3 | Boric Acid Fuel cladding |
ML20084B612 | 22 June 1972 | Rept of Preliminary Investigation Failure of Hanger Bolts on Suppression Chamber Suction Header at Quad Cities Nuclear Station,Unit 2 | |
ML20084L930 | 8 May 1984 | Const Insps at Midland & Zimmer Nuclear Power Plants, Monthly Progress Rept for Apr 1984 | |
ML20085F252 | 19 May 1983 | Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Interim Technical Evaluation Rept | |
ML20085K488 | 19 September 1983 | QA Case Study Working Paper Case C, Revised Draft Working Paper | Earthquake |
ML20086S620 | 30 April 1981 | Systems Interaction Evaluation Procedure for Application to Indian POINT-3 | Boric Acid Ultimate heat sink Scram Discharge Volume Earthquake |
ML20086S648 | 15 June 1981 | Review of PASNY Sys Interaction Study | Safe Shutdown Ultimate heat sink |
ML20086S661 | 1 March 1982 | Review of PASNY Sys Interaction Study | |
ML20087Q085 | 13 July 1983 | Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept | |
ML20093C533 | 30 March 1984 | Audit of Susquehanna Unit 2 Tech Specs, Technical Evaluation Rept | Reactor Vessel Water Level Half scram Stroke time Hydrostatic Anchor Darling Backfit |
ML20093H138 | 30 May 1984 | Draft Review of Millstone-3 Probabilistic Safety Study | Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Reserve Station Service Transformer Earthquake Turbine Missile Fatality Failure to Scram |
ML20093H198 | 19 December 1983 | Preliminary Review & Evaluation of Millstone-3 Probabilistic Safety Study | Probabilistic Risk Assessment |
ML20094Q467 | 15 August 1984 | Control of Heavy Loads (C-10),Northeast Nuclear Energy Co, Millstone Point Nuclear Power Station Unit 2 | Safe Shutdown Nondestructive Examination Control of Heavy Loads |
ML20097F020 | 31 August 1984 | Technical Assistance in Conduct of Insp Program at Various Region III Nuclear Power Plants, Monthly Progress Rept for Aug 1984 | |
ML20099D455 | 28 February 1985 | Conformance to Reg Guide 1.97,Millstone Nuclear Power Station,Unit 2 | |
ML20105C435 | 18 November 1983 | Evaluation of Diesel Generator Failure at Shoreham Unit 1, Interim Rept on Phase 1,Failure Cause Evaluation, Interim Technical Evaluation Rept | |
ML20106H424 | 31 August 1984 | Control of Heavy Loads at Nuclear Power Plants,Millstone Unit 3 (Phase I), Technical Evaluation Rept | Control of Heavy Loads |
ML20107K574 | 23 October 1984 | Audit Rept,Human Factors Engineering Detailed Control Room Design Review In-Progress Audit | |
ML20107K934 | 10 July 1984 | Draft Control of Heavy Loads - Phase Ii,Indian Point Nuclear Power Plant Unit 2, Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads Fuel cladding |
ML20112G245 | 31 October 1984 | Northwest Us Subduction Zone Seismic Risk Assessment, Rept for Oct 1983 - Oct 1984 | Earthquake |
ML20112G277 | 7 February 1975 | Topical Rept on Exams of Portions of Reactor Bldg Spray Sys Piping from Arkansas Nuclear Plant 1 | |
ML20112J145 | 31 July 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Byron Units 1 & 2 & Braidwood Units 1 & 2 | Boric Acid Anchor Darling |
ML20112J410 | 31 March 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Waterford Steam Electric Station,Unit 3 | |
ML20112J431 | 31 March 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Midland Nuclear Plant (Units 1 & 2) | |
ML20112J439 | 30 April 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at WPPSS Nuclear Project 2 | |
ML20112J453 | 31 July 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Wh Zimmer Nuclear Power Station | |
ML20112J477 | 30 September 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Palo Verde Nuclear Generating Station Unit 1 | Anchor Darling |
ML20112J489 | 31 July 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment for Snupps | Anchor Darling |
ML20114D604 | 31 January 1985 | Conformance to Reg Guide 1.97,Millstone Nuclear Power Station,Unit 3 | Boric Acid |
ML20115A519 | 22 March 1985 | Masonry Wall Design for Millstone Point Unit 2, Technical Evaluation Rept | Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20117D068 | 27 November 1995 | NPP TER on IPE Front End Analysis | Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment |
ML20117D074 | 30 November 1995 | Unit 2-TER on IPE Submittal Human Reliability Analysis - Final Rept | Probabilistic Risk Assessment |
ML20117D080 | 30 November 1995 | TER on IPE - Back-End Analysis | Probabilistic Risk Assessment |
ML20126D376 | 24 July 1984 | Assessment of Diesel Engine Reliability/Operability, Monthly Progress Rept for June 1984 | |
ML20126D380 | 19 September 1984 | Assessment of Diesel Engine Reliability/Operability, Monthly Progress Rept for Jul & Aug 1984.Related Info Encl | High Radiation Area Nondestructive Examination Scram Discharge Volume |
ML20126E654 | 31 July 1984 | Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 | Probabilistic Risk Assessment Failure to Scram |
ML20126E986 | 31 May 1985 | Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept | |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20126F615 | 28 February 1983 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl | Hydrostatic Exemption Request |
ML20126F659 | 30 June 1983 | Containment Leak Rate Testing, Monthly Progress Rept for June 1983 | |
ML20126M423 | 31 July 1992 | TER on Third 10-Yr Interval ISI Program Plan:Northeast Utils,Millstone Nuclear Power Station,Unit 1 | Boric Acid Packing leak High Radiation Area Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Scaffolding |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML20127B927 | 31 July 1984 | Review & Evaluation of Tdi Diesel Engine Reliability & Operability - Grand Gulf Nuclear Station,Unit 1 | Breakaway torque Liquid penetrant |
ML20127L899 | 30 April 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Apr 1983 | |
ML20127L963 | 31 May 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for May 1983 | |
ML20127M008 | 30 June 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for June 1983 |