Issue date | Title | Topic | |
---|---|---|---|
ML20205L697 | 27 March 1987 | Requests Further Info & Documentation Re Steam Generator Tube Vibration Problem for Generic CESSAR Sys 80 Steam Generator Design by 870410.Specific Questions Re Request Encl | Flow Induced Vibration |
ML20205M906 | 28 October 1988 | Advises That Addendum 2 to WCAP-10988, COBRA-NC,Analysis for Main Steamline Break in Catawba Unit 1 Ice Condenser Containment, Forwarded by Will Be Withheld from Public Disclosure,Per Request | |
ML20205Q566 | 25 October 1988 | Forwards SERs Re Company 871117 Application for Authority to Construct & Operate Facilities to Enrich Stable Isotopes at Facility-1 Cpdf & to Construct Facility for Same Purpose at Facility-2 Oliver Springs | |
ML20205R717 | 3 November 1988 | Requests 880912 Submittal Re Ability to Assure Funding for Decontamination Over Entire Period of License Be Revised. NRC Expects That Sale of Unneeded,Unclassified Matl Will Realize Sufficient Funds to Cover Costs of Removal of Matl | |
ML20205T599 | 7 November 1988 | Requests Survey of Proposed Oliver Spring Site to Look for Evidence of Threatened or Endangered Species | |
ML20205T696 | 3 November 1988 | Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region | |
ML20207H664 | 22 July 1986 | Ack Receipt of 860508 Application for Approval of Transfer of Ga Co Control for Licenses R-38,R-67 & SNM-0696. Application Fee Required | |
ML20210C626 | 14 October 1975 | Responds to Re Agreements for Wiring Separation within Instrumentation & Control Protection Racks & Request for Meeting to Discuss Extension of Agreements.Contact W/ Ta Ippolito to Arrange Meeting Suggested.Related Ltr Encl | |
ML20214M663 | 22 May 1987 | Forwards Revised NRC Form 398.Rev Reflects Changes to 10CFR55 Effective on 870526.Revised Form Requires New Applications to Complete Each Category Including Educ, Training & Experience.Changes Detailed in Encl 2 | |
ML20234D438 | 28 December 1987 | Forwards Request for Addl Info Re Applications for CPs & Ols,Including Info Concerns Centrifuge Machine Contamination,Decommissioning,Radioactive & Classified Waste Disposal & Environ Rept | |
ML20234E798 | 8 July 1976 | Forwards List of Info Required to Complete Review of LWR ECCS Performance to Verify Conformance to 10CFR50.46.Info Must Be Filed on GESSAR-238 & GESSAR-251 Dockets as Part of Std SAR & Be Reviewed Prior to Preliminary Design Approval | Boric Acid |
ML20235C519 | 1 July 1975 | Forwards Round 1 to Request for Addl Info Re Application for Preliminary Design Approval of GESSAR-238 Std Nsss. Review of Interfaces Between NSSS & balance-of-plant,site & Options Completed.Response Requested by 750725 | Safe Shutdown Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Overtravel Earthquake Fuel cladding Through-Wall Leak |
ML20235C563 | 20 February 1976 | Informs That NRC Currently Reviewing Fuel Channel Hydrodynamic,Reactor Core Reactivity & Total Reactor Sys Stability Margins for Certain GE Bwrs.Addl Info Needed Re BWR Stability Margins Identified in Encl | |
ML20235C896 | 11 April 1974 | Forwards Detailed Request for Addl Info Needed to Complete Review of Gessar Application.Response to Items Concerning Qa,Instrumentation & Reactor Sys Requested by 740509 & 0517, Respectively | |
ML20235C907 | 26 March 1974 | Forwards Request for Addl Info Needed to Continue Review of Gessar Application,Including Discussion of Steam Condensation Rates Assigned to Containment Sprays & Heat Sinks.Info Requested by 740509 | |
ML20235C912 | 20 March 1974 | Forwards Requests for Addl Info Re Gessar Application, Including Futher Discussion on Inherent Protection Provided by Gessar Design Against Aircraft Hazards.Info Requested by 740509 | Safe Shutdown Anticipated operational occurrence Weld Overlay Earthquake Fuel cladding |
ML20235C926 | 12 February 1974 | Expresses Concerns Re Delays in Review of Gessar,Due to Introduction of New Designs in Several Areas of Plant & Slips in Transmitting Part of Regulatory Staff Initial Request for Addl Info.Revised Review Schedule Encl | |
ML20235E571 | 26 March 1975 | Submits Comments & Recommendations on 750212 & 13 Meetings W/Ge in San Jose,Ca Re Mark III Experimental Testing Program & GE Analytical Methods.Relief Valve & Pool Dynamic Loads, Seismic Testing & Asymmetric Effects Addressed | |
ML20235E583 | 7 July 1976 | Forwards Description of NRC Position on Safety Relief Valve Discharge Piping as Result of NRC Continuing Review of Quencher Safety Relief Valve Discharge Device for Facility. Commitment to Implement NRC Position Requested by 760716 | |
ML20235E873 | 19 February 1975 | Forwards Request for Addl Info,By 750321,re Electrical, Instrumentation & Control Sys for GESSAR-251.Application GESSAR-251,consisting of Psar,Docketed on 750214 | |
ML20235N980 | 22 February 1989 | Forwards Notices of Issuance of CPs for Alchemie Centrifuge Plan Demonstration & Oliver Springs Facilities | |
ML20235T243 | 24 September 1987 | Forwards Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03 & Notice of Violation | |
ML20239A197 | 17 December 1985 | Further Response to 850927 & 1106 FOIA Requests for Documents Re Pressure Suppression Containment,Including Humboldt Bay & Bodega Bay Docket Files.Bodega Bay File Being Placed in Pdr.Review of Addl Documents Continuing | |
ML20245C115 | 20 June 1989 | Issues Amend 1 to CP CPEP-1,specifying 891103 as Latest Date of Completion of Mods to Facility.Ser Encl | |
ML20246A145 | 1 May 1989 | Responds to 890418 Request for Extension of Completion Date to 891103 for Mod to Be Performed Under CP CPEP-1.CP Will Remain in Effect Until Determination Made W/Respect to Request | |
ML20246C710 | 18 August 1989 | Forwards Order,Effective Immediately,Modifying CPs CPEP-1 & CPEP-2 to Require Notification of Commission Before Taking Possession of Any Classified Equipment & to Show Cause Why CPs Should Not Be Revoked | |
ML20246K709 | 8 May 1989 | Forwards Environ Assessment & Finding of No Significant Impact Re Amend to CPEP-1 | |
ML20246P018 | 17 July 1989 | Forwards Request for Addl Info Re 890620 Filing for Reorganization in Us Bankruptcy Court.Nrc Will Initiate Proceeding for Suspension or Revocation of CPs Should Licensee Fail to Respond by 890815 | |
ML20246P417 | 23 March 1989 | Advises That 890210 Condition III.6 of CP Issued to Alchemie Re Financial Assurances for Protection of Common Defense & Security by Control of Classified Machinery Not Applicable | |
ML20247R763 | 27 September 1989 | Informs That Latest Completion Date for CP CPEP-1 Currently 891103.Application Should Show Good Cause & Fee Should Be Encl |