Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML061920599 | 6 July 2006 | Washington State University Requal Exam Not Completed within 15 Month Timeframe | |
ML062080149 | 12 July 2006 | Washington State University Nuclear Radiation Center Notification of Overflow of Liquid Waste System | |
ML062080152 | 19 July 2006 | Letter Regarding Failure of Boil Reservoir Failed at the the Washington State University Nuclear Radiation Center | |
ML062330224 | 24 August 2006 | Corporate Notification Letter No. 05-027/OL-07-01, Washington State University Triga Reactor, December 2006 | |
ML062350563 | 28 August 2006 | Initial Examination Report No. 50-27/OL-06-01, Washington State University Reactor | |
ML062350567 | 28 August 2006 | Initial Examination Results Letter, No. 50-027/OL-06-01, Washington State University | |
ML062410246 | 23 August 2006 | Annual Report on Operation of Washington State University Triga Reactor for July 1, 2005 Through June 30,2006 | |
ML062980077 | 23 October 2006 | E-mail to Research and Test Reactor from M. Mendonca Draft Directors Decision on Uncontrolled/Unmonitored Releases | |
ML063330083 | 16 November 2006 | Washington State University - Notification Submitted Per 10CFR50.54 and 10 CFR50.59.D.2; Re During September 2006, Existing Temperature Indication System Installed at Wsu Nuclear Radiation Center Was Upgraded to Modern Digital System | Shutdown Margin |
ML070080298 | 11 January 2007 | Initial Examination Results Letter, No. 50-027/OL-07-01, Washington State University | |
ML070080318 | 11 January 2007 | Initial Examination Report, No. 50-027/OL-07-01, Washington State University | Shutdown Margin High Radiation Area |
ML070100490 | 15 December 2006 | Trtr (National Organization of Test, Research and Training Reactors) Letter on Fingerprinting Requirements for Unescorted Access to Facilities | |
ML070220002 | 26 January 2007 | National Organization of Test, Research and Training Reactors(Trtr) Input on Fingerprinting Requirements for Unescorted Access to Research and Test Reactors | |
ML070320140 | 24 January 2006 | Letter Informing That Existing Temperature Indication System Installed at Washington State University Nuclear Radiation Center Was Replaced with Modern Equivalent in September 2006 | Shutdown Margin |
ML070750140 | 30 April 2007 | Issuance of Order Imposing Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Research and Test Reactors | |
ML070780026 | 20 March 2007 | Initial Examination Corporate Notification Letter No. 50-027/OL-07-02, Washington State University | |
ML070790584 | 15 March 2007 | Y020070071 Trtr (National Organization Fo Test, Research and Training Reactors) Letter and Response on Fingerprinting Requirements for Unescorted Access to Research and Test Reactors | |
ML070930391 | 26 October 2007 | Change of Facility Project Manager, Washington State University, Docket 05-27 | |
ML072320279 | 8 August 2007 | Washington State University Letter Re Notice Due to NRC within 30 Days of Any Observed Inadequacies in the Implementation of Administrative or Procedural Controls, Per Technical Specifications, Section 6.10 (3) (D) (Reporting Requirements) | Shutdown Margin |
ML072350098 | 13 August 2007 | Annual Operating Report for the Washington State University Triga Reactor for July 1, 2006 Through June 30, 2007 | |
ML072410493 | 15 August 2007 | Washington State University - License Amendment Request for Two Orders, One for Increasing Possession Limits for Uranium-235 (Possession Order), and a Second Order for Conversion of the Wsu Reactor from HEU to Leu Fuel (Conversion Order) | |
ML072420395 | 27 September 2007 | Initial Examination Report No. 50-027/OL-07-02, Washington State University Reactor | Shutdown Margin Deep Dose Equivalent |
ML072420448 | 27 September 2007 | Initial Examination Results Letter, No. 50-027/OL-07-02, Washington State University | |
ML072710409 | 24 October 2007 | Initial Examination Certificate Transmittal Letter, No. 50-027/OL-07-02, Washington State University | |
ML072990055 | 11 October 2007 | Washington State University Nuclear Radiation Center - Weekly Security System Check Was Not Required as Required by the Wsu/Nrc 0.2 Maintenance Log | |
ML073240018 | 20 November 2007 | Washington State University - Request for Additional Information Amendment Request for Increase in Possession Limits for Reactor Conversion | |
ML073550839 | 23 January 2008 | Issuance of Order Modifying License No. R-76 to Amend Possession Limit for Uranium-235 Associated with Conversion from High- to Low-enriched Uranium (Amendment No. 19) - Washington State University Triga Reactor | |
ML080170037 | 15 January 2008 | Letter from Donald Wall, Washington State Univ to Alexander Adams, NRC Regarding Attachments to RAI Dated November 20, 2007 | |
ML080230271 | 23 January 2008 | Letter Requesting Emergency Publication of Order | |
ML080460523 | 20 February 2008 | Washington State University, Request for Additional Information, Amendment Request for Conversion from High-Enriched Uranium to Low-Enriched Uranium Fuel | Shutdown Margin |
ML080570643 | 27 February 2008 | Corporate Notification Letter, 50-027/OL-08-01, Washington State University Triga Reactor | |
ML081490386 | 6 June 2008 | Initial Examination Results Letter No. 50-027/OL-08-01, Washington State University Triga Reactor | |
ML082180526 | 29 July 2008 | New Pool Water Conductivity Monitoring System at Washington State University Nuclear Radiation Center Installed and Became Operational March 2008 | Shutdown Margin Fuel cladding |
ML082190555 | 29 July 2008 | Notification That the New Area Radiation Monitoring System at Washington State University Nuclear Radiation Center Was Installed and Became Operational March 2008 | Shutdown Margin |
ML082210118 | 4 August 2008 | Washington State University Letter Revised Responses to Questions 6, 9, 15, 16, 28, 33, 36, and 40, Per Washington State University Response to RAI Submittal to NRC Dated June 13, 2008 | Shutdown Margin |
ML082250452 | 6 August 2008 | Washington State University Ltr., Re Transmittal of Communication from General Atomics Declaring Bloost Code Validation Report, Submitted by Washington State University on June 13, 2008, May Be Made Available for Public Release | |
ML082250618 | 13 August 2008 | Washington State University - Request for Additional Information Amendment Request for Conversion from High-enriched Uranium to Low-enriched Uranium Fuel | |
ML082380268 | 6 August 2008 | Transmittal of GA-21 C025, Bloost Code Validation Report, Release Authorized by Ga | |
ML082380279 | 13 June 2008 | Transmittal of Responses to Request for Additional Information and Supporting Documentation Regarding Heu/Leu Conversion | |
ML082380934 | 29 August 2008 | Corporate Notification Letter, 05000027/OL-09-01, Washington State University Triga Reactor | |
ML082390030 | 22 August 2008 | Washington State University'S Response to Request for Additional Information on Thermal Hydraulic Analysis and Among Other Things | Shutdown Margin Fuel cladding |
ML082400522 | 25 August 2008 | Washington State University, Submittal of Two Additional Pages of Technical Specifications Inadvertently Left Out of Package Sent on 08/22/08 | |
ML082401484 | 4 September 2008 | Issuance of Order Modifying License No. R-76 to Convert from High-to Low-Enriched Uranium Fuel (Amendment No. 20) - Washington State University Triga Reactor | Shutdown Margin Hydrostatic Fuel cladding |
ML082460582 | 4 September 2008 | Request for Emergency Publication of Document, Order Modifying Amended Facility Operating License No. R-76. | |
ML083390576 | 19 December 2008 | Initial Examination Report No. 05000027/OL-09-01, Washington State University Triga Reactor | Shutdown Margin High Radiation Area |
ML083390581 | 19 December 2008 | Initial Examination Results Letter No. 05000027/OL-09-01, Washington State University Triga Reactor | |
ML090220221 | 8 January 2009 | Washington State University, Transmittal of Proposed Change Per 10 CFR 50.59 Direct Replacement of the Transient Rod & Partial Replacement of the Connecting Rod | Shutdown Margin |
ML091740029 | 23 June 2009 | Washington State University, Project Manager Change Letter Eff. 4/1/2009 to Linh Tran | |
ML091890781 | 1 July 2009 | Informs That Washington State Univ. Has Prepared a Safeguards Contingency Plan in Accordance with Requirements Stated in 10CFR 73.60 (E), Including Requirements Specified in 10CFR 73 Appendix C. | |
ML091940184 | 14 July 2009 | Washington State University Incorporation of the Safeguards Contingency Plan Into the Physical Security Plan, 50-27 |