Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20053C15020 May 1982Forwards Sargent & Lundy Responses to Teledyne Open Items & Error Deviation Repts for Facility Independent Design Review.None of Corrective Actions Required Field Changes
ML20054E8258 June 1982Releases Public Version of Revision to Lzp Test Procedure
ML20054G58215 June 1982Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components
ML20054G58712 May 1982Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054J02417 June 1982Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program
ML20054J43322 June 1982Releases Public Version of Lzp Procedures Manual Offsite Notification Forms
ML20054J57924 June 1982Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use
ML20054J85623 June 1982Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures
ML20054K36926 January 1982Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201Scram Discharge Volume
ML20054K43828 June 1982Releases Public Version of Format for Safety Evaluation & Safety Evaluation Checklist for Lzp Tests/Procedures
ML20054K69329 June 1982Releases Public Version of Revision to Emergency Plan Implementing Procedure
ML20054K94623 June 1982Notification of Cancellation of 820623 Meeting W/Atty General of Il & Il Friends of the Earth & Consultants in Glen Ellyn,Il to Discuss Findings of 10CFR2.206 Allegations
ML20054K94821 June 1982Notification of 820623 Meeting W/Il Atty General & Il Friends of the Earth & Consultants in Glen Ellyn,Il to Discuss Findings of 10CFR2.206 Allegations
ML20054K95815 June 1982Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology
ML20054L11415 June 1982Forwards Commissioner Briefing Package Re Facility Full Power License.Viewgraphs EnclHydrostatic
Operating Basis Earthquake
Scram Discharge Volume
Fire Protection Program
ML20054M2149 November 1981Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20054M3706 July 1982Releases Public Version of 10CFR50.59 Format for Safety Evaluation & Safety Evaluation Checklist for Lzp Tests/ Procedures
ML20055A26221 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl
ML20055A26321 January 1981Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A26927 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline
ML20055A27028 January 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A27510 February 1982Forwards Info Re Current Status of Exemption Requests for Alert & Notification SysExemption Request
ML20055A27712 February 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys DeadlineExemption Request
ML20055A2976 July 1982Notification of 820721 Meeting W/Util in Bethesda,Md to Discuss Fuel Reload Methodology.Agenda Encl
ML20055B3666 July 1982Forwards SER & Suppls 1,2 & 3.Suppl 4 Under Preparation & Will Be Provided During Wk of 820712.Oct 1982 Proposed as Appropriate Completion Date for Licensing Action.W/O Encl
ML20055C16515 February 1983Forwards SER Indicating GE 820224 Proposal to Delete Control Rod Drop Accident from Std GE-BWR Reload Package for Banked Position Withdrawal Sequence Plants Acceptable
ML20055C35226 February 1990Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility
ML20055D57927 June 1990Requests Position on Allowability of Radios or Tape Players in Control Room of Nonpower Reactors
ML20057C98027 September 1993Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months
ML20057F27513 October 1993Notification of 931021 Meeting W/Util in Rockville,Md to Discuss Util Mod to Address NRC Bulletin 93-03, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWR, for PlantReactor Vessel Water Level
ML20058A13212 October 1978Notification of 781026 Meeting W/Util to Discuss Tech Spec Bases for Reactor Coolant Described in NRC to Util
ML20058A2373 November 1978Lic Amend Request Proposing Change to Reactor Trip on Turbine Trip Setpoint.Rev Setpoint Is Justified on Basis of NRC Approved Transient Analysis Methods Employed by Westinghouse Corp
ML20058B3786 July 1982Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA
ML20058F83619 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedures
ML20058H86316 November 1990Notification of 901219 Meeting W/Util in Rockville,Md,To Discuss NRC Bulletin 88-008 Concerns
ML20058K13629 August 1989Lists Conclusions Reached at 890822 Meeting on Owners Group Improved Tech Specs,Including Surveillance Requirement 3.0.5 & pressure-temp Limits & Leakage Detection Sys
ML20058K6043 July 1986Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection
ML20058N48115 December 1993Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately