Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20053C150 | 20 May 1982 | Forwards Sargent & Lundy Responses to Teledyne Open Items & Error Deviation Repts for Facility Independent Design Review.None of Corrective Actions Required Field Changes | |
ML20054E825 | 8 June 1982 | Releases Public Version of Revision to Lzp Test Procedure | |
ML20054G582 | 15 June 1982 | Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components | |
ML20054G587 | 12 May 1982 | Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful | |
ML20054H139 | 17 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054H412 | 18 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054J024 | 17 June 1982 | Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program | |
ML20054J433 | 22 June 1982 | Releases Public Version of Lzp Procedures Manual Offsite Notification Forms | |
ML20054J579 | 24 June 1982 | Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use | |
ML20054J856 | 23 June 1982 | Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures | |
ML20054K369 | 26 January 1982 | Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201 | Scram Discharge Volume |
ML20054K438 | 28 June 1982 | Releases Public Version of Format for Safety Evaluation & Safety Evaluation Checklist for Lzp Tests/Procedures | |
ML20054K693 | 29 June 1982 | Releases Public Version of Revision to Emergency Plan Implementing Procedure | |
ML20054K946 | 23 June 1982 | Notification of Cancellation of 820623 Meeting W/Atty General of Il & Il Friends of the Earth & Consultants in Glen Ellyn,Il to Discuss Findings of 10CFR2.206 Allegations | |
ML20054K948 | 21 June 1982 | Notification of 820623 Meeting W/Il Atty General & Il Friends of the Earth & Consultants in Glen Ellyn,Il to Discuss Findings of 10CFR2.206 Allegations | |
ML20054K958 | 15 June 1982 | Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology | |
ML20054L114 | 15 June 1982 | Forwards Commissioner Briefing Package Re Facility Full Power License.Viewgraphs Encl | Hydrostatic Operating Basis Earthquake Scram Discharge Volume Fire Protection Program |
ML20054M214 | 9 November 1981 | Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works | |
ML20054M330 | 6 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedure | |
ML20054M370 | 6 July 1982 | Releases Public Version of 10CFR50.59 Format for Safety Evaluation & Safety Evaluation Checklist for Lzp Tests/ Procedures | |
ML20055A262 | 21 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl | |
ML20055A263 | 21 January 1981 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A269 | 27 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline | |
ML20055A270 | 28 January 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A275 | 10 February 1982 | Forwards Info Re Current Status of Exemption Requests for Alert & Notification Sys | Exemption Request |
ML20055A277 | 12 February 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline | Exemption Request |
ML20055A297 | 6 July 1982 | Notification of 820721 Meeting W/Util in Bethesda,Md to Discuss Fuel Reload Methodology.Agenda Encl | |
ML20055B366 | 6 July 1982 | Forwards SER & Suppls 1,2 & 3.Suppl 4 Under Preparation & Will Be Provided During Wk of 820712.Oct 1982 Proposed as Appropriate Completion Date for Licensing Action.W/O Encl | |
ML20055C165 | 15 February 1983 | Forwards SER Indicating GE 820224 Proposal to Delete Control Rod Drop Accident from Std GE-BWR Reload Package for Banked Position Withdrawal Sequence Plants Acceptable | |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20055D579 | 27 June 1990 | Requests Position on Allowability of Radios or Tape Players in Control Room of Nonpower Reactors | |
ML20057C980 | 27 September 1993 | Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months | |
ML20057F275 | 13 October 1993 | Notification of 931021 Meeting W/Util in Rockville,Md to Discuss Util Mod to Address NRC Bulletin 93-03, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWR, for Plant | Reactor Vessel Water Level |
ML20058A132 | 12 October 1978 | Notification of 781026 Meeting W/Util to Discuss Tech Spec Bases for Reactor Coolant Described in NRC to Util | |
ML20058A237 | 3 November 1978 | Lic Amend Request Proposing Change to Reactor Trip on Turbine Trip Setpoint.Rev Setpoint Is Justified on Basis of NRC Approved Transient Analysis Methods Employed by Westinghouse Corp | |
ML20058B378 | 6 July 1982 | Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA | |
ML20058F836 | 19 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedures | |
ML20058H863 | 16 November 1990 | Notification of 901219 Meeting W/Util in Rockville,Md,To Discuss NRC Bulletin 88-008 Concerns | |
ML20058K136 | 29 August 1989 | Lists Conclusions Reached at 890822 Meeting on Owners Group Improved Tech Specs,Including Surveillance Requirement 3.0.5 & pressure-temp Limits & Leakage Detection Sys | |
ML20058K604 | 3 July 1986 | Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection | |
ML20058N481 | 15 December 1993 | Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately |