Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000482/198405111 December 1984Forwards Special Const Verification Insp Rept 50-482/84-51 of Voluntary Const self-assessment on 841023-1102,per 840924 Request,For Transmittal to Applicant.Transmittal Ltr, Potential Enforcement Actions & Unresolved Items Also Encl
IR 05000498/198001710 July 1980Advises That Coversheet of Encl Insp Repts 50-498/80-17 & 50-499/80-17 Signed W/Understanding That Comments Discussed in 800710 Telcon Will Be Incorporated Except Comment on Vibration Frequency.Supporting Documentation Encl
IR 05000498/19820022 June 1982Partially Deleted Memo Re Investigation Repts 50-498/82-02 & 50-499/82-02 on 820429 Concerning Quadrex Rept.Nrc Advised That Util Was Conducting Assessment of Brown & Root Co Design & Rept Would Be Completed in May 1981
IR 05000498/198502119 February 1986Advises That Const Appraisal Team Insp Repts 50-498/85-21 & 50-499/85-19 Sent to Applicant on 860205.Rept Also Transmitted to Board Due to Relevance to Issues B & D in Proceeding.Related Correspondence
IR 05000498/19860352 January 1987Notification of 870108 Significant Meeting W/Util in Region IV Ofc to Discuss Resolution of Emergency Preparedness Appraisal Items Identified in Insp Repts 50-498/86-35 & 50-499/86-35 on 861201-12
IR 05000498/198705224 December 1987Notification of 871230 Enforcement Conference in Arlington, Tx to Discuss Security Matters Described in Insp Repts 50-498/87-52,50-498/87-54 & 50-498/87-66
IR 05000498/198707121 December 1987Notification of 871230 Enforcement Conference in Arlington, Tx to Discuss Recent Failures to Comply W/Tech Specs as Described in Insp Rept 50-498/87-71
IR 05000498/199201727 January 1993Notification of Significant Licensee Meeting W/Util on 930204 to Conduct Enforcement Conference to Discuss Apparent Violations Identified in Insp Repts 50-498/92-17 & 50-499/92-17
IR 05000528/198501225 September 1985Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986
IR 05000529/198504427 November 1985Comments on Comparison of as-built Plant W/Facility Tech Specs.Details of Review to Be Reflected in Insp Rept 50-529/85-44 & IE Insp Procedure 71301, Tech Spec Review, Dtd 850322.Proposed Tech Specs Clear & Enforceable
IR 07100023/20110059 November 1987Forwards NRC Resident Ofc Status Rept for 871023-1105Contraband
Hydrostatic
IR 07100120/20120039 December 1987Forwards Plant Status Rept for 871120-1203.Three Resident Inspectors Monitored Activities at Plant During Rept PeriodHydrostatic
IR 07100204/201201721 December 1987Forwards Plant Status Rept for 871204-1217
ML0823201704 October 1985Responds to 850828 Concerns That Procedures in Draft Manual Chapter 0514 Not Followed in Addressing Util 850604 Backfit Claim.Nrr Completed Actions within Stipulated 3-wk Time Frame.Ie Concurrence Delayed NRC ResponseBackfit
ML0823808437 November 1985Discusses Util 850531 Response to NRC Request for Addl Info Re Item 2.2.2 of Generic Ltr 83-28 Contending That Request Violated plant-specific Backfit Manual.Appeal Not Planned. Item ClosedBackfit
ML08289091318 March 1985Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329
ML18046B2894 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML18046B29010 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML20054E7948 June 1982Releases Public Version of Emergency Notification Procedure Change Rept
ML20054E8758 June 1982Releases Public Version of Revision to Emergency Plan Implementing Procedure
ML20054F26011 June 1982Releases Public Version of Revised Emergency Plan Implementing Procedures
ML20054G58215 June 1982Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components
ML20054G58712 May 1982Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful
ML20054H13517 June 1982Releases Public Version of Revisions to Emergency Plan Implementing Procedures
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H45318 June 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20054J02417 June 1982Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program
ML20054J57924 June 1982Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use
ML20054J85623 June 1982Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures
ML20054K36926 January 1982Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201Scram Discharge Volume
ML20054K95815 June 1982Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology
ML20054M2149 November 1981Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20054M6606 July 1982Releases Public Version of Revision to Emergency Plan
ML20055A26221 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl
ML20055A26321 January 1981Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A26927 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline
ML20055A27028 January 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A27510 February 1982Forwards Info Re Current Status of Exemption Requests for Alert & Notification SysExemption Request
ML20055A27712 February 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys DeadlineExemption Request
ML20055B29521 May 1982Notifies That,Due to Extensive Involvement W/Resolution of Headquarters Investigation 79-19 Findings & Related Show Cause Order,Region 4 Did Not Perform Formal Systematic Assessment of License Performance for Aug 1979-Jul 1980