Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000341/198704216 November 1987Discusses 870923-24 Meetings Between Electrical Sys Branch & Licensee Re LPCI Swing Bus Design Deficiency Revealed by 870908 Operator Error.Nrr Finds Licensee Design Changes Acceptable,Affirming Conclusions of Insp Rept 50-341/87-42
IR 05000397/19870061 July 1987Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept
IR 05000400/198504814 July 1986Notifies of Ofc of Investigations Discontinuance of Inquiry Q2-85-021 & Related Area of Interest as to Matter Contained in Insp Rept 50-400/85-48.Insp Rept & Notice of Violation May Be Released
IR 05000410/19830062 December 1983Discusses 830422 Anonymous Allegation Re Deficiencies in Emergency Diesel Generator Sys,Radiation Containment Sys & Qualifications of Contract Personnel (Allegation Rept Q-1-83-012,based on Insp Rept 50-410/83-06)
IR 05000410/198605624 February 1987Informs of Closeout of Allegation RI-86-A-0125.Region Findings Documented in Insp Rept 50-410/86-56 Dtd 861217. Allegation Unsubstantiated.B.Cook Feb 10 Memo Encl
IR 05000445/19780209 February 1979Corrects Notice of Deviation Re Insp Rept 50-445/78-20,per Util 790209 Response
IR 05000454/198303827 January 1984Identifies Addl Insp Repts 50-454/83-38 & 50-455/83-28 Re Reinsp Program,Per 840120 Memo
IR 05000482/198301326 July 1983Informs That Allegation 4-83-A-17 Re Improper Use of white-out Unsubstantiated.Forwards Insp Rept 50-482/83-13. Engineering Section Insp to Be Conducted.W/O Encl
IR 05000482/198302826 October 1983Informs That Allegation 4-83-A-17 Inspected by R Hall on 830919-22 & Findings Reported in Encl 50-482/83-28.W/o Insp Rept.Related Info EnclAffidavit
IR 05000482/198400122 February 1984Informs That Remaining Item on Allegation 4-83-A-25 Completed.W/O Insp Rept 50-482/84-01
IR 05000482/198405111 December 1984Forwards Special Const Verification Insp Rept 50-482/84-51 of Voluntary Const self-assessment on 841023-1102,per 840924 Request,For Transmittal to Applicant.Transmittal Ltr, Potential Enforcement Actions & Unresolved Items Also Encl
IR 05000528/198501225 September 1985Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986
IR 05000529/198504427 November 1985Comments on Comparison of as-built Plant W/Facility Tech Specs.Details of Review to Be Reflected in Insp Rept 50-529/85-44 & IE Insp Procedure 71301, Tech Spec Review, Dtd 850322.Proposed Tech Specs Clear & Enforceable
ML0823201704 October 1985Responds to 850828 Concerns That Procedures in Draft Manual Chapter 0514 Not Followed in Addressing Util 850604 Backfit Claim.Nrr Completed Actions within Stipulated 3-wk Time Frame.Ie Concurrence Delayed NRC ResponseBackfit
ML0823808437 November 1985Discusses Util 850531 Response to NRC Request for Addl Info Re Item 2.2.2 of Generic Ltr 83-28 Contending That Request Violated plant-specific Backfit Manual.Appeal Not Planned. Item ClosedBackfit
ML08289091318 March 1985Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329
ML18046B2894 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML18046B29010 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML20009A97629 June 1981Discusses Concerns Not Answered by Util in Meeting Re Facility Des.Recommends That Des Be Placed on File W/Encl Concerns Forwarded to NRC
ML20009G7569 June 1981Submits Review of Des for Facility.Effects on Lake Erie Minimal.No Objections Raised Against OL Issuance
ML20024B00026 April 1968Comments on Jcp&L Draft Oyster Creek Unit 2 Contract Transmitted by G Gray 680327 Ltr.Comments Based on Belief That Contract Should Pose No More or No Less Burden on Vendor than Met Ed Contract
ML20054G58215 June 1982Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components
ML20054G58712 May 1982Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054J02417 June 1982Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program
ML20054J57924 June 1982Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use
ML20054J85623 June 1982Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures
ML20054K36926 January 1982Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201Scram Discharge Volume
ML20054K95815 June 1982Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology
ML20054M2149 November 1981Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20055A26221 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl
ML20055A26321 January 1981Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A26927 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline
ML20055A27028 January 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A27510 February 1982Forwards Info Re Current Status of Exemption Requests for Alert & Notification SysExemption Request
ML20055A27712 February 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys DeadlineExemption Request
ML20055B15715 July 1982Releases Public Version of Facility,State & Local Radiological Emergency Response Plans,Emergency Response Plan Procedures & Evacuation Time Estimates
ML20055C3349 February 1990Notification of 900216 Enforcement Conference Meeting 90-19 W/Util in King of Prussia,Pa Re Safety Concern Process & Degraded ADS Logic
ML20055C35226 February 1990Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility
ML20056A00026 July 1990Notification of 900809 Meeting W/Util in Rockville,Md to Discuss Storage of Low Level Waste at Plant
ML20056C50031 August 1992Presents Comments & Recommendations Re GE Generic Power Uprate Program & Proposed 5% Power Increase for Fermi-2Power Uprate
ML20056E4575 August 1993Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant
ML20056H18831 August 1993Notification of 930913 Meeting W/Util in Rockville,Md to Discuss Concerns Re Thermal Binding & Pressure Locking & Binding at Plant
ML20057B47516 September 1993Notification of 931020 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Plant