ML20084E32821 January 1974Telecopy of AO 50-244/74-01:on 740118,during Removal of Insert Steam Generator a Hot Leg,Inrush of Air to Generator Occurred Causing Imbalance of Water Still in Tubes.Boration Started Immediately
ML20084E38821 June 1973AO 73-3 & 73-4:on 730611 & 12,during Performance of Periodic Test & Following Satisfactory Test of Safety Injection Pumps I-A & B,Safety Injection Pump I-C Failed to Start to Bus 16. Caused by Slightly Bent Operator Arm on Cell Switch
ML20084E40913 June 1973AO 73-4:on 730612,safety Injection Pump 1C Failed to Start Manually from Bus 16 When Control Switch Closed at Control Board.Caused by Problem W/Cell Switch in Bus 16 Breaker. Switch Adjusted & Pump Started Satisfactorily
ML20084E42311 June 1973AO 73-3:on 730611,safety Injection Pump 1C Failed to Start Manually from Bus 16 When Control Switch Closed at Control Board.Cause Unknown.Overcurrent Trip Devices Tested Following Maint Procedure M-32 & Functioned Satisfactorily
ML20084E44726 August 1970Ao:On 700818,overpower Rod Stop & Reactor Trip Bistable TC 407A/B Found Faulty.Caused by Malfunctioning Zener Diode in Regulated Power Supply.Bistable Replaced
ML20084E4603 January 1970Telecopy Message of Ao:On 700103,B Train Safety Injection Sequence Failed to Operate Following Signal.Caused by Dirty Contacts on Relay.Contacts Cleaned
ML20084E49219 August 1970Telecopy Message of Ao:On 700818,overpower Rod Stop & Reactor Trip Bistable TC-407/B Found Faulty.Bistable Replaced
ML20084E66623 April 1971Telecopy Message of Ao:On 710422,during Diesel Generator Load & Safeguard Sequence Test,Valves 826 A,B,C & D Failed to Open.Electrical Speed for Concentrated Boric Acid Storage Tank Level Instrumentation Moved to Bus SuppliesBoric Acid
ML20084E7096 July 1970Telecopy Ao:On 700706,boron Dilution Performed W/Reactor Critical & No Reactor Coolant Pump or RHR Pump in Operation
ML20084E74618 May 1970Telecopy Ao:On 700514,MSIV 1B Failed to Close Following Load Rejection Test.Packing Gland Adjusted
ML20084E8016 March 1970Telecopy Ao:On 700306,during Surveillance Test,Excessive Air Leakage Along Shaft That Penetrates to Outside & Inside Hand Control Wheels Noted.Repairs Initiated Immediately
ML20084E8515 October 1970Telecopy Ao:On 701004,gape Valve 852B Only Opened Halfway. Caused by Loose Stem Nut of Limitorque Operator.Nut Replaced
ML20084E86314 October 1970Telecopy Message of Ao:On 701014,gate Valve 851A Failed to Fully Close.Caused by Loose Stem Nut Locking.Lock Tightened & Stem Lubricated
ML20084F0497 February 1972Ao:On 720203,power Range High Setpoint on Nuclear Power Channel N-41 Found Exceeding Tech Spec Limits.Caused by Shift of Low Voltage Supply.Channel Realigned within Proper Limits
ML20084F0613 February 1972Telecopy Ao:On 720203,while Conducting Biweekly Surveillance,Power Range High Flux Set Points Found to Be 110%.Caused by Negative Power Supply Voltage Drifting Out of Spec.Setpoints Realigned
ML20084F11127 January 1972Ao:On 720118,during Routine Monthly Surveillance Test, Pressurizer Pressure Bistable Failed to Deenergize on Low Pressure Set Point.Caused by Fluctuating Output of Bistable When Placed on Trip Point.Bistable Replaced
ML20084F41321 December 1973AO 50-244/73-11:on 731214,motor Driven Feedwater Pumps a & B Found Air Bound & Would Not Pump.Caused by Presence of Air in Suction Side of Motor Driven Auxiliary Feedwater Pumps. Installation of Vent on Condensate Reject Line Initiated
ML20084F46315 December 1973Telecopy of AO 50-244/73-11:on 731214,during Auxiliary Feedwater Sys Flow Test,Motor Driven Pump a Started & No Pressure or Flow Indication Found.Installation of Vent on High Point of Condensate Reject Line Advised
ML20084F56531 October 1973AO 50-244/73-10:on 731021,safety Injection Pump Suction Transferred Prematurely from Boric Acid Storage Tanks to Refueling Water Storage Tank.Caused by Loss of Power to Instrument Bus 1A.Bus Panel Doors Locked to Reduce ErrorBoric Acid
Earthquake
ML20084F60231 October 1973AO 50-244/73-09:on 731021,instability of Transmission Sys & Loss of Outside Power Occurred Resulting in Reactor Trip. Caused by Procedures Permitting Generation of 435 Mwe When One Transmission Line Was Out.New Procedures InitiatedBoric Acid
ML20084F63423 October 1973AO 50-244/73-09:on 731021,loss of Outside Power Occurred Resulting in Reactor Trip.Ao 50-244/73-10:on 731021, Malfunction of Safety Injection Pump Suction Transfer from Boric Acid Storage Tanks to Refueling Water Tank OccurredBoric Acid
ML20084F64614 September 1973AO 50-244/73-08:on 730907,flow Channel on Steam Generator 1A Failed Downscale While at Steady State Operation.Caused by Flexure Wire Connecting Dp Cell to Strain Gauge Failing at Soldered Joint
ML20084F66610 September 1973Telecopy AO 50-244/78-08:on 730907,steam Flow Indicator FI-463 on Steam Generator 1A Failed Downscale.Caused by Failed Solder Connection on Flexure Wire Connection,Between Strain Gauge & Dp Cell Shaft Extension.Wire Soldered
ML20084G0601 August 1973AOs 50-244/73-06 & 50-244/73-07:on 730722,sensing Line on Auxiliary Feedwater Pump B Failed,Causing Reactor Trip. Caused by Disconnected Line on Discharge Valve.Sensing Line for Pump B Reworked
ML20084G06427 July 1973Telecopy of AOs 50-244/73-06 & 50-244/73-07:on 730722, Sensing Line on Auxiliary Feedwater Pump B Failed.Caused by Disconnected Swagelock Fitting Associated W/Auxiliary Feedwater Flow Orifice
ML20084G10227 July 1973Ao:On 730717,during Periodic Test PT5,one Side of Bistable LC-427 A/C Failed to de-energize on Inserted Signal Equal to 5% Pressurizer Water Level.Caused by Cold Solder Joint Failure.Module Replaced
ML20084G10718 July 1973Telecopy of Ao:On 730717,during Surveillance Test,Components of One Side of Bistable LC-427 A/C Failed to de-energize When Signal Equal to 5% of Pressurizer Level Inserted. Cause Not Stated
ML20084H03016 April 1974AO 50-244/74-04:on 740406,during Surveillance Test PT 2.1, Safety Injection Pump 1C Failed to Start Manually When Connected to Bus 16.Caused by Trip Bar Switch Prematurely Closing.Lockout Coil Assembly & Trip Bar Switch Adjusted
ML20084H0348 April 1974AO 50-244/74-04:on 740406,during Periodic Test PT-2,1,safety Injection Pump 1C Failed to Start Manually on Bus 16.Caused by Failure of Capacitor in Control Circuit & Malfunction of Tripper Bar Switch.Switch Adjusted