Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML103470650 | 13 December 2010 | Millstone 3 Draft Response to GL2004-02 RAI No. 6 | Coatings |
ML111750219 | 22 June 2011 | NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) | Condition Adverse to Quality Significance Determination Process |
ML112340464 | 20 August 2011 | MPS2 RR RAI Response | Mission time Coatings Scaffolding |
ML112340505 | 21 August 2011 | Verbal Authorization, Relief Request RR-04-12, of Millstone 2 Temporary Non-Code Compliant Condition of Emergency Diesel Generator Supply Piping in the Service Water System | |
ML12032A225 | 25 January 2012 | Attachments 4-6 to 11-687, Regarding License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 | Boric Acid Shutdown Margin Ultimate heat sink Stroke time Surveillance Frequency Control Program Offsite Circuit Power change Unidentified leakage |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML12093A083 | 2 April 2012 | Notice of Public Meeting - April 19, 2012 | Open House |
ML13364A283 | 30 December 2013 | Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 | Generic Fundamentals Examination |
ML14041A178 | 6 February 2014 | Attachment 1 - Response to Request for Additional Information for Alternative Request IR-3-17, for ASME Section XI for Repair/Replacement of Class 3 Service Water System Valves | Hydrostatic |
ML14041A179 | 6 February 2014 | Attachment 3 - Examination of Millstone Unit 3 Service Water Valves for Dealloying | Through-Wall Leak |
ML14128A041 | 30 April 2014 | Attachment 2 - 2013 Radioactive Effluent Release Report - Volume 2 | Time of Discovery Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radiological Environmental Operating Report Power change |
ML14358A318 | 22 December 2014 | FOIA/PA-2014-0508 - Resp 1 - Partial. Group a (Records Being Released in Their Entirety) | Boric Acid High winds Stroke time Past operability Enforcement Discretion Operator Manual Action Functionality Assessment Condition Adverse to Quality Significance Determination Process Large early release frequency Preliminary White Finding Loctite |
ML15065A238 | 6 February 2015 | Acord Certificate of Liability Insurance | |
ML15231A364 | 27 May 2015 | FOIA/PA-2014-0204 - Resp 1 - Final, Group a | |
ML16266A546 | 21 December 2016 | Summary of Results of Flooding Hazard Reevaluation Report for Millstone Power Station Units 2 and 3 | |
ML19011A171 | 4 January 2019 | Enclosures 1 to 3 - EAL Scheme Revisions Enclosure Summary, Discussion of Change and Mps EAL Scheme Revisions-Supporting Documents | Boric Acid High winds Shutdown Margin Reactor Vessel Water Level Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding |
ML21077A136 | 18 March 2021 | Temporary Instruction 2515/194 Inspection Documentation Request | Open Phase Condition Time Critical Operator Action |