 Issue dateTitleTopic
ML10347065013 December 2010Millstone 3 Draft Response to GL2004-02 RAI No. 6Coatings
ML11175021922 June 2011NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011)Condition Adverse to Quality
Significance Determination Process
ML11234046420 August 2011MPS2 RR RAI ResponseMission time
Coatings
Scaffolding
ML11234050521 August 2011Verbal Authorization, Relief Request RR-04-12, of Millstone 2 Temporary Non-Code Compliant Condition of Emergency Diesel Generator Supply Piping in the Service Water System
ML12032A22525 January 2012Attachments 4-6 to 11-687, Regarding License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3Boric Acid
Shutdown Margin
Ultimate heat sink
Stroke time
Surveillance Frequency Control Program
Offsite Circuit
Power change
Unidentified leakage
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML12093A0832 April 2012Notice of Public Meeting - April 19, 2012Open House
ML13364A28330 December 2013Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013Generic Fundamentals Examination
ML14041A1786 February 2014Attachment 1 - Response to Request for Additional Information for Alternative Request IR-3-17, for ASME Section XI for Repair/Replacement of Class 3 Service Water System ValvesHydrostatic
ML14041A1796 February 2014Attachment 3 - Examination of Millstone Unit 3 Service Water Valves for DealloyingThrough-Wall Leak
ML14128A04130 April 2014Attachment 2 - 2013 Radioactive Effluent Release Report - Volume 2Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radiological Environmental Operating Report
Power change
ML14358A31822 December 2014FOIA/PA-2014-0508 - Resp 1 - Partial. Group a (Records Being Released in Their Entirety)Boric Acid
High winds
Stroke time
Past operability
Enforcement Discretion
Operator Manual Action
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Preliminary White Finding
Loctite
ML15065A2386 February 2015Acord Certificate of Liability Insurance
ML15231A36427 May 2015FOIA/PA-2014-0204 - Resp 1 - Final, Group a
ML16266A54621 December 2016Summary of Results of Flooding Hazard Reevaluation Report for Millstone Power Station Units 2 and 3
ML19011A1714 January 2019Enclosures 1 to 3 - EAL Scheme Revisions Enclosure Summary, Discussion of Change and Mps EAL Scheme Revisions-Supporting DocumentsBoric Acid
High winds
Shutdown Margin
Reactor Vessel Water Level
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
ML21077A13618 March 2021Temporary Instruction 2515/194 Inspection Documentation RequestOpen Phase Condition
Time Critical Operator Action