TMI-13-071, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | FLEX Spent Fuel Pool Instrumentation |
TMI-13-073, CFR 50.46 Annual Report | 10 May 2013 | CFR 50.46 Annual Report | |
TMI-13-093, Withdrawal of the Three Mile Island Nuclear Power Station, Unit 1, Technical Specification Change Request 352, Revise Technical Specification 3.14.2 and the Licensing Basis Flood Hazard Contained in the Updated Final Safety Analysis Repor | 24 June 2013 | Withdrawal of the Three Mile Island Nuclear Power Station, Unit 1, Technical Specification Change Request 352, Revise Technical Specification 3.14.2 and the Licensing Basis Flood Hazard Contained in the Updated Final Safety Analysis Report | |
TMI-13-095, Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | 24 July 2013 | Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | High Radiation Area Spent Fuel Pool Instrumentation |
TMI-13-105, Update 10 of the Post-Defueling Monitored Storage Safety Analysis Report | 23 August 2013 | Update 10 of the Post-Defueling Monitored Storage Safety Analysis Report | Safe Shutdown Boric Acid High winds High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting Locked High Radiation Area Decommissioning Funding Plan Tornado Generated Missile Earthquake Fire Protection Program Power change |
TMI-13-150, Response to Request for Additional Information - 10 CFR 50.46 30-Day Report | 10 October 2013 | Response to Request for Additional Information - 10 CFR 50.46 30-Day Report | |
TMI-13-155, Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 9 | 8 November 2013 | Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 9 | Boric Acid Shutdown Margin |
TMI-13-156, Response to Request for Additional Information on Post-Shutdown Decommissioning Activities Report | 18 November 2013 | Response to Request for Additional Information on Post-Shutdown Decommissioning Activities Report | |
TMI-13-161, Submittal of Inspection Plan for Reactor Internals. Areva Report ANP-2952Q1NP Enclosed | 6 November 2013 | Submittal of Inspection Plan for Reactor Internals. Areva Report ANP-2952Q1NP Enclosed | Aging Management Flow Induced Vibration |
TMI-13-168, Closeout of Commitments Associated with Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End | 3 December 2013 | Closeout of Commitments Associated with Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End | Weld Overlay Dissimilar Metal Weld |
TMI-14-002, Draft - Outlines (Folder 2) | 7 January 2014 | Draft - Outlines (Folder 2) | Boric Acid Shutdown Margin |
TMI-14-011, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima.... | 28 March 2014 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima.... | Unanalyzed Condition Fukushima Dai-Ichi |
TMI-14-015, Decommissioning Funding Status Report | 28 March 2014 | Decommissioning Funding Status Report | |
TMI-14-022, Biennial 10 CFR 50.59 and Pdms Report for the Years 2012 and 2013 | 29 April 2014 | Biennial 10 CFR 50.59 and Pdms Report for the Years 2012 and 2013 | |
TMI-14-023, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Permonth, Using the Consolidated Line Item Improvement Process | 7 May 2014 | Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Permonth, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
TMI-14-029, T1R20 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments | 25 February 2014 | T1R20 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments | Boric Acid Packing leak |
TMI-14-042, Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements | 24 March 2014 | Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements | |
TMI-14-049, Combined 2013 Annual Radioactive Effluent Release Report | 25 April 2014 | Combined 2013 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
TMI-14-050, Updated Final Safety Analysis Report (Ufsar), Revision 22, Fire Hazards Analysis Report (Fhar), Revision 26, UFSAR and Fhar Reference Drawings | 9 April 2014 | Updated Final Safety Analysis Report (Ufsar), Revision 22, Fire Hazards Analysis Report (Fhar), Revision 26, UFSAR and Fhar Reference Drawings | Post Accident Monitoring Multiple Spurious Operation Aging Management |
TMI-14-051, 2013 Radiological Environmental Monitoring Program Report | 25 April 2014 | 2013 Radiological Environmental Monitoring Program Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
TMI-14-052, Notification of Implementation of License Renewal Activities in Preparation for Entrance Into Period of Extended Operation for Unit 1 | 11 April 2014 | Notification of Implementation of License Renewal Activities in Preparation for Entrance Into Period of Extended Operation for Unit 1 | |
TMI-14-053, Biennial 10 CFR 50.59 and Commitment Revision Report for 2012 and 2013 | 16 April 2014 | Biennial 10 CFR 50.59 and Commitment Revision Report for 2012 and 2013 | License Renewal Dissimilar Metal Weld |
TMI-14-055, Submittal of Changes to Technical Specifications Bases | 10 April 2014 | Submittal of Changes to Technical Specifications Bases | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Incorporated by reference Missed surveillance Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Operability Determination Earthquake Power-Operated Valves Power Operated Valves Fuel cladding Fire Protection Program Power change Unidentified leakage |
TMI-14-058, (TMI-1) - Steam Generator Tube Inspection Report | 22 May 2014 | (TMI-1) - Steam Generator Tube Inspection Report | Nondestructive Examination |
TMI-14-066, 10 CFR 50.46 Annual Report | 9 May 2014 | 10 CFR 50.46 Annual Report | |
TMI-14-069, Submittal of the Fifth Ten-Year Interval Inservice Testing Program | 16 May 2014 | Submittal of the Fifth Ten-Year Interval Inservice Testing Program | Safe Shutdown Boric Acid Stroke time Squib Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
TMI-14-074, Response to Request for Additional Information Related to the Fall 2013 Steam Generator Inspections | 17 November 2014 | Response to Request for Additional Information Related to the Fall 2013 Steam Generator Inspections | |
TMI-14-102, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2, Emergency Core Cooling, Reactor Building Emergency Cooling and Reactor Building Spray Systems | 15 July 2014 | Request for Enforcement Discretion for Technical Specification (TS) 3.3.2, Emergency Core Cooling, Reactor Building Emergency Cooling and Reactor Building Spray Systems | Internal Flooding Enforcement Discretion VT-2 Seismically rugged Pandemic Liquid penetrant Pressure boundary leak |
TMI-14-118, Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements | 19 September 2014 | Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements | Dissimilar Metal Weld |
TMI-14-136, Response to Request for Additional Information - Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements | 19 November 2014 | Response to Request for Additional Information - Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements | |
TMI-15-014, TMI - Response to Warning Communication South Carolina Radioactive Waste Transportation Permit 4498-37-14-X | 16 January 2015 | TMI - Response to Warning Communication South Carolina Radioactive Waste Transportation Permit 4498-37-14-X | |
TMI-15-027, Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 10 | 27 February 2015 | Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 10 | Boric Acid Shutdown Margin |
TMI-15-029, 2014 Annual Report | 27 February 2015 | 2014 Annual Report | |
TMI-15-036, Decommissioning Funding Status Report | 27 March 2015 | Decommissioning Funding Status Report | |
TMI-15-038, Response to Request for Additional Information Regarding Report Dated December 22, 2014, Submitted Pursuant to 10 CFR 50.46 | 6 April 2015 | Response to Request for Additional Information Regarding Report Dated December 22, 2014, Submitted Pursuant to 10 CFR 50.46 | |
TMI-15-048, Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing Program | 13 April 2015 | Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing Program | Safe Shutdown Boric Acid Stroke time Squib Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
TMI-15-049, Submittal of Changes to Technical Specifications Bases | 14 April 2015 | Submittal of Changes to Technical Specifications Bases | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Cyber Security Incorporated by reference Missed surveillance Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Earthquake Power-Operated Valves Power Operated Valves Fuel cladding Fire Protection Program Scaffolding Power change Unidentified leakage |
TMI-15-057, Changes to Emergency Response Data System (ERDS) | 22 July 2015 | Changes to Emergency Response Data System (ERDS) | |
TMI-15-062, Special Report - Radioactive Gaseous Process and Effluent Monitoring Instrumentation | 8 May 2015 | Special Report - Radioactive Gaseous Process and Effluent Monitoring Instrumentation | Grab sample |
TMI-15-063, 10 CFR 50.46 Annual Report | 8 May 2015 | 10 CFR 50.46 Annual Report | |
TMI-15-064, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process | 7 May 2015 | Supplement to the Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
TMI-15-065, Notice of Transfer of Transmission Assests | 19 June 2015 | Notice of Transfer of Transmission Assests | Cyber Security |
TMI-15-072, Supplement to License Amendment Request - Modify Reactor Coolant System Pressure Isolation Check Valve Technical Specification Maximum Allowable Leakage Limts | 10 June 2015 | Supplement to License Amendment Request - Modify Reactor Coolant System Pressure Isolation Check Valve Technical Specification Maximum Allowable Leakage Limts | |
TMI-15-076, Submittal of TMI White Paper-TMI Bwst Cleanup Path Issue | 22 June 2015 | Submittal of TMI White Paper-TMI Bwst Cleanup Path Issue | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
TMI-15-086, Supplement to License Amendment Request - Temporary Restoration of Borated Water Storage Tank Cleanup and Recirculation Operation | 28 July 2015 | Supplement to License Amendment Request - Temporary Restoration of Borated Water Storage Tank Cleanup and Recirculation Operation | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
TMI-15-093, Revision to Post-Shutdown Decommissioning Activities Report | 4 December 2015 | Revision to Post-Shutdown Decommissioning Activities Report | |
TMI-15-102, Clarification of Commitment Regarding Resolution of Generic Letter 2004-02 | 10 September 2015 | Clarification of Commitment Regarding Resolution of Generic Letter 2004-02 | |
TMI-15-123, Cycle 21 Core Operating Limits Report, COLR TMI 1, Revision 11 | 16 November 2015 | Cycle 21 Core Operating Limits Report, COLR TMI 1, Revision 11 | Boric Acid Shutdown Margin |
TMI-15-133, Part 21 Notification Due to Breaker Defect | 28 December 2015 | Part 21 Notification Due to Breaker Defect | |
TMI-15-134, Revision 16 of the Post-Defueling Monitoring Storage (Pdms) Quality Assurance (QA) Plan | 14 December 2015 | Revision 16 of the Post-Defueling Monitoring Storage (Pdms) Quality Assurance (QA) Plan | Nondestructive Examination Temporary Modification Fire Protection Program |