Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TMI-13-071, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)FLEX
Spent Fuel Pool Instrumentation
TMI-13-073, CFR 50.46 Annual Report10 May 2013CFR 50.46 Annual Report
TMI-13-093, Withdrawal of the Three Mile Island Nuclear Power Station, Unit 1, Technical Specification Change Request 352, Revise Technical Specification 3.14.2 and the Licensing Basis Flood Hazard Contained in the Updated Final Safety Analysis Repor24 June 2013Withdrawal of the Three Mile Island Nuclear Power Station, Unit 1, Technical Specification Change Request 352, Revise Technical Specification 3.14.2 and the Licensing Basis Flood Hazard Contained in the Updated Final Safety Analysis Report
TMI-13-095, Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)24 July 2013Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)High Radiation Area
Spent Fuel Pool Instrumentation
TMI-13-105, Update 10 of the Post-Defueling Monitored Storage Safety Analysis Report23 August 2013Update 10 of the Post-Defueling Monitored Storage Safety Analysis ReportSafe Shutdown
Boric Acid
High winds
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Locked High Radiation Area
Decommissioning Funding Plan
Tornado Generated Missile
Earthquake
Fire Protection Program
Power change
TMI-13-150, Response to Request for Additional Information - 10 CFR 50.46 30-Day Report10 October 2013Response to Request for Additional Information - 10 CFR 50.46 30-Day Report
TMI-13-155, Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 98 November 2013Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 9Boric Acid
Shutdown Margin
TMI-13-156, Response to Request for Additional Information on Post-Shutdown Decommissioning Activities Report18 November 2013Response to Request for Additional Information on Post-Shutdown Decommissioning Activities Report
TMI-13-161, Submittal of Inspection Plan for Reactor Internals. Areva Report ANP-2952Q1NP Enclosed6 November 2013Submittal of Inspection Plan for Reactor Internals. Areva Report ANP-2952Q1NP EnclosedAging Management
Flow Induced Vibration
TMI-13-168, Closeout of Commitments Associated with Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End3 December 2013Closeout of Commitments Associated with Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-EndWeld Overlay
Dissimilar Metal Weld
TMI-14-002, Draft - Outlines (Folder 2)7 January 2014Draft - Outlines (Folder 2)Boric Acid
Shutdown Margin
TMI-14-011, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima....28 March 2014Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from the Fukushima....Unanalyzed Condition
Fukushima Dai-Ichi
TMI-14-015, Decommissioning Funding Status Report28 March 2014Decommissioning Funding Status Report
TMI-14-022, Biennial 10 CFR 50.59 and Pdms Report for the Years 2012 and 201329 April 2014Biennial 10 CFR 50.59 and Pdms Report for the Years 2012 and 2013
TMI-14-023, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Permonth, Using the Consolidated Line Item Improvement Process7 May 2014Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Permonth, Using the Consolidated Line Item Improvement ProcessSurveillance Frequency Control Program
TMI-14-029, T1R20 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments25 February 2014T1R20 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and AttachmentsBoric Acid
Packing leak
TMI-14-042, Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements24 March 2014Response to Request for Additional Information Regarding Request for Amendment to Eliminate Certain Three Mile Island Nuclear Station, Unit 1 Technical Specification Reporting Requirements
TMI-14-049, Combined 2013 Annual Radioactive Effluent Release Report25 April 2014Combined 2013 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
TMI-14-050, Updated Final Safety Analysis Report (Ufsar), Revision 22, Fire Hazards Analysis Report (Fhar), Revision 26, UFSAR and Fhar Reference Drawings9 April 2014Updated Final Safety Analysis Report (Ufsar), Revision 22, Fire Hazards Analysis Report (Fhar), Revision 26, UFSAR and Fhar Reference DrawingsPost Accident Monitoring
Multiple Spurious Operation
Aging Management
TMI-14-051, 2013 Radiological Environmental Monitoring Program Report25 April 20142013 Radiological Environmental Monitoring Program ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
TMI-14-052, Notification of Implementation of License Renewal Activities in Preparation for Entrance Into Period of Extended Operation for Unit 111 April 2014Notification of Implementation of License Renewal Activities in Preparation for Entrance Into Period of Extended Operation for Unit 1
TMI-14-053, Biennial 10 CFR 50.59 and Commitment Revision Report for 2012 and 201316 April 2014Biennial 10 CFR 50.59 and Commitment Revision Report for 2012 and 2013License Renewal
Dissimilar Metal Weld
TMI-14-055, Submittal of Changes to Technical Specifications Bases10 April 2014Submittal of Changes to Technical Specifications BasesSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Incorporated by reference
Missed surveillance
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Fire Protection Program
Power change
Unidentified leakage
TMI-14-058, (TMI-1) - Steam Generator Tube Inspection Report22 May 2014(TMI-1) - Steam Generator Tube Inspection ReportNondestructive Examination
TMI-14-066, 10 CFR 50.46 Annual Report9 May 201410 CFR 50.46 Annual Report
TMI-14-069, Submittal of the Fifth Ten-Year Interval Inservice Testing Program16 May 2014Submittal of the Fifth Ten-Year Interval Inservice Testing ProgramSafe Shutdown
Boric Acid
Stroke time
Squib
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
TMI-14-074, Response to Request for Additional Information Related to the Fall 2013 Steam Generator Inspections17 November 2014Response to Request for Additional Information Related to the Fall 2013 Steam Generator Inspections
TMI-14-102, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2, Emergency Core Cooling, Reactor Building Emergency Cooling and Reactor Building Spray Systems15 July 2014Request for Enforcement Discretion for Technical Specification (TS) 3.3.2, Emergency Core Cooling, Reactor Building Emergency Cooling and Reactor Building Spray SystemsInternal Flooding
Enforcement Discretion
VT-2
Seismically rugged
Pandemic
Liquid penetrant
Pressure boundary leak
TMI-14-118, Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements19 September 2014Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing RequirementsDissimilar Metal Weld
TMI-14-136, Response to Request for Additional Information - Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements19 November 2014Response to Request for Additional Information - Submittal of Relief Request RR-14-01 Concerning Alternative Root Mean Square (Rms) Depth Sizing Requirements
TMI-15-014, TMI - Response to Warning Communication South Carolina Radioactive Waste Transportation Permit 4498-37-14-X16 January 2015TMI - Response to Warning Communication South Carolina Radioactive Waste Transportation Permit 4498-37-14-X
TMI-15-027, Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 1027 February 2015Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 10Boric Acid
Shutdown Margin
TMI-15-029, 2014 Annual Report27 February 20152014 Annual Report
TMI-15-036, Decommissioning Funding Status Report27 March 2015Decommissioning Funding Status Report
TMI-15-038, Response to Request for Additional Information Regarding Report Dated December 22, 2014, Submitted Pursuant to 10 CFR 50.466 April 2015Response to Request for Additional Information Regarding Report Dated December 22, 2014, Submitted Pursuant to 10 CFR 50.46
TMI-15-048, Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing Program13 April 2015Submittal of the Update to the Fifth Ten-Year Interval Lnservice Testing ProgramSafe Shutdown
Boric Acid
Stroke time
Squib
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
TMI-15-049, Submittal of Changes to Technical Specifications Bases14 April 2015Submittal of Changes to Technical Specifications BasesSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Cyber Security
Incorporated by reference
Missed surveillance
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Fire Protection Program
Scaffolding
Power change
Unidentified leakage
TMI-15-057, Changes to Emergency Response Data System (ERDS)22 July 2015Changes to Emergency Response Data System (ERDS)
TMI-15-062, Special Report - Radioactive Gaseous Process and Effluent Monitoring Instrumentation8 May 2015Special Report - Radioactive Gaseous Process and Effluent Monitoring InstrumentationGrab sample
TMI-15-063, 10 CFR 50.46 Annual Report8 May 201510 CFR 50.46 Annual Report
TMI-15-064, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process7 May 2015Supplement to the Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement ProcessSurveillance Frequency Control Program
TMI-15-065, Notice of Transfer of Transmission Assests19 June 2015Notice of Transfer of Transmission AssestsCyber Security
TMI-15-072, Supplement to License Amendment Request - Modify Reactor Coolant System Pressure Isolation Check Valve Technical Specification Maximum Allowable Leakage Limts10 June 2015Supplement to License Amendment Request - Modify Reactor Coolant System Pressure Isolation Check Valve Technical Specification Maximum Allowable Leakage Limts
TMI-15-076, Submittal of TMI White Paper-TMI Bwst Cleanup Path Issue22 June 2015Submittal of TMI White Paper-TMI Bwst Cleanup Path IssueSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
TMI-15-086, Supplement to License Amendment Request - Temporary Restoration of Borated Water Storage Tank Cleanup and Recirculation Operation28 July 2015Supplement to License Amendment Request - Temporary Restoration of Borated Water Storage Tank Cleanup and Recirculation OperationSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
TMI-15-093, Revision to Post-Shutdown Decommissioning Activities Report4 December 2015Revision to Post-Shutdown Decommissioning Activities Report
TMI-15-102, Clarification of Commitment Regarding Resolution of Generic Letter 2004-0210 September 2015Clarification of Commitment Regarding Resolution of Generic Letter 2004-02
TMI-15-123, Cycle 21 Core Operating Limits Report, COLR TMI 1, Revision 1116 November 2015Cycle 21 Core Operating Limits Report, COLR TMI 1, Revision 11Boric Acid
Shutdown Margin
TMI-15-133, Part 21 Notification Due to Breaker Defect28 December 2015Part 21 Notification Due to Breaker Defect
TMI-15-134, Revision 16 of the Post-Defueling Monitoring Storage (Pdms) Quality Assurance (QA) Plan14 December 2015Revision 16 of the Post-Defueling Monitoring Storage (Pdms) Quality Assurance (QA) PlanNondestructive Examination
Temporary Modification
Fire Protection Program