Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000254/FIN-2012005-05 | Licensee-Identified Violation | ||
05000254/FIN-2012007-01 | CAPR Not Completed | ||
05000254/FIN-2012010-01 | Concerns with Meeting One Time Visual Inspections IAW ASME Section Xi Requirements | ||
05000254/FIN-2012010-02 | Questions Regarding Aging Management Inspections on the 16\\\' Diameter Discharge Pipes | Ultimate heat sink Aging Management | |
05000254/FIN-2012011-01 | Inadequate Procedure to Energize Bus 23-1 to Provide Torus Cooling for Unit 1 | ||
05000254/FIN-2012011-02 | Inadequate Procedure for Cold Shutdown Repair of 1A Recirculation Pump Discharge Valve Mo 1-202-5A | ||
05000254/FIN-2012012-01 | Failure to provide complete and accurate decommissioning status reports | ||
05000254/FIN-2012301-01 | Licensee-Identified Violation | Significance Determination Process | |
05000254/FIN-2012403-01 | Security | ||
05000254/FIN-2013002-01 | Failure to Follow Clearance Order Instructions | Significance Determination Process | |
05000254/FIN-2013002-02 | Diesel Generator Cooling Water Pump Aligned to Wrong Unit | Significance Determination Process | |
05000254/FIN-2013002-03 | Licensee-Identified Violation | VT-2 | |
05000254/FIN-2013003-01 | Calculation Assumptions Not Translated Into Operating Procedures | Ultimate heat sink | |
05000254/FIN-2013003-02 | Question Concerning Licensing Bases of the Ultimate Heat Sink | Ultimate heat sink | |
05000254/FIN-2013003-03 | Failure to Assess Impact of Relocating Portable Pumps Offsite | ||
05000254/FIN-2013003-04 | Question Concerning Availability of Dam Following a Seismic Event | Safe Shutdown Operating Basis Earthquake Design basis earthquake Earthquake | |
05000254/FIN-2013003-05 | Steam Dryer/Steam Separator Lifting Device Fracture Toughness Properties | Control of Heavy Loads | |
05000254/FIN-2013003-06 | Unit 1 MSIV Slow Closure | Stroke time | |
05000254/FIN-2013003-07 | Licensee-Identified Violation | ||
05000254/FIN-2013003-08 | Licensee-Identified Violation | ||
05000254/FIN-2013004-01 | Wrong Parts Installed For CRD HCU | Significance Determination Process | |
05000254/FIN-2013007-01 | Failure to Translate Design Basis Into Toxic Chemical Response Procedures | ||
05000254/FIN-2013408-01 | Security | ||
05000254/FIN-2013408-02 | Security | ||
05000254/FIN-2013408-03 | Licensee-Identified Violation | ||
05000254/FIN-2014002-01 | Steam Dryer/Steam Separator Lifting Device Failure to Meet American National Standards Institute (ANSI) N14.6 | Nondestructive Examination Significance Determination Process | |
05000254/FIN-2014002-02 | Licensee-Identified Violation | Safe Shutdown Fire Barrier Fire impairment Fire Protection Program | |
05000254/FIN-2014003-02 | Post Maintenance Test Fails to Ensure Battery Charger can Perform Function | Significance Determination Process | |
05000254/FIN-2014004-01 | Angle Iron Support Installed with Minimal Clearance to Unit 2 Torus Shell | ||
05000254/FIN-2014004-02 | Inadequate Evacuation Time Estimate Submittals | ||
05000254/FIN-2014004-03 | Licensee-Identified Violation | Significance Determination Process | |
05000254/FIN-2014005-01 | HPCI Flood Barrier Degraded | Significance Determination Process | |
05000254/FIN-2014005-02 | Failure to Submit a Report Required by 10 CFR 50.72(b)(3)(xiii) | ||
05000254/FIN-2014007-01 | Inadequate Rounds Package Acceptance Criteria | Significance Determination Process | |
05000254/FIN-2014007-02 | Inadequate Administrative Controls 05000265/2014007-02 | Significance Determination Process | |
05000254/FIN-2014008-01 | Failure to Identify Aging Effects on Plant Equipment and Structures | Aging Management | |
05000254/FIN-2014008-02 | Non-Conservative DGCW Pump Break Horsepower Assumed in EDG Loading Analysis | ||
05000254/FIN-2014008-03 | Testing of MSIVs with Instrument Air or Drywell Pneumatic System Aligned to Actuators | ||
05000254/FIN-2014403-01 | Licensee-Identified Violation | ||
05000254/FIN-2015001-01 | Failure to Establish and Maintain Service Life for Safety-Related Relay Results in Failure and Inoperability | ||
05000254/FIN-2015001-02 | Failure to Ensure Standby Lineup Results in Steam Release in the HPCI Room | ||
05000254/FIN-2015001-03 | Licensee-Identified Violation | Shutdown Margin Fuel cladding | |
05000254/FIN-2015001-04 | Licensee-Identified Violation | Significance Determination Process | |
05000254/FIN-2015002-01 | Failure to Conduct Post-Maintenance Testing Following Manual Operation of RCIC MOV | ||
05000254/FIN-2015002-02 | Inadequate Zone of Protection for Electrical Bus Maintenance | Significance Determination Process | |
05000254/FIN-2015003-01 | Failure to Evaluate Degraded or Non-Conforming Conditions for Operability | Unanalyzed Condition | |
05000254/FIN-2015003-02 | Failure to Establish Adequate Procedure to Preclude Unacceptable Preconditioning of the SBGT System | Fuel cladding | |
05000254/FIN-2015003-03 | Failure to Adequately Inspect Relay Contacts for Oxidation Results in Relay Failure | ||
05000254/FIN-2015004-01 | EAL Threshold Values Were Not Revised | FLEX | |
05000254/FIN-2015004-02 | Licensee-Identified Violation |