Issue date | Title | From | To | |
---|---|---|---|---|
IR 05000369/2018010 | 12 April 2018 | NRC Design Bases Assurance Inspection (Team) Report 05000369/2018010 and 05000370/2018010 | Marvin Sykes Division of Reactor Safety II | Duke Energy Teresa Ray |
IR 05000369/2020010 | 27 October 2020 | Design Basis Assurance Inspection Report 05000369/2020010 and 05000370/2020010 | James Baptist NRC/RGN-II/DRS/EB2 | Duke Energy Teresa Ray |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | Crutchfield D Office of Nuclear Reactor Regulation | |
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | 5 February 1996 | Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | Crutchfield D Office of Nuclear Reactor Regulation | |
Information Notice 1996-49, Thermally Induced Pressurization of Nuclear Power Facility Piping | 20 August 1996 | Thermally Induced Pressurization of Nuclear Power Facility Piping | Martin T Office of Nuclear Reactor Regulation | |
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections | 6 March 1997 | Problems Identified During Generic Letter 89-10 Closeout Inspections | Martin T Office of Nuclear Reactor Regulation | |
ML13073A041 | 16 May 2013 | Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate | Boska J Plant Licensing Branch II | Duke Energy Capps S |
ML20093D398 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 3 | Duke Energy | Office of Nuclear Reactor Regulation |
ML20116E771 | 31 July 1996 | Responds to RAI Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves | Duke Energy Mcmeekin T | Office of Information Resources Management |
ML20134G166 | 3 February 1997 | Forwards Suppl Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate Valves | Duke Energy Barron H | Office of Information Resources Management |
ML20134L146 | 10 February 1997 | Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | |
ML20140H580 | 11 June 1997 | Provides Update to Corrective Actions Completed During Recent Unit 1 Outage in Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves | Duke Energy Barron H | Office of Information Resources Management |
ML20206N351 | 11 May 1999 | Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs | NRC (Affiliation Not Assigned) | |
ML20211E675 | 22 September 1997 | Forwards Safety Evaluation Supporting DPC Submittals, ,960731,970611 & 970203 Responding to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves | NRC (Affiliation Not Assigned) Nerses V | Duke Energy Barron H |
ML20211E687 | 22 September 1997 | SER Accepting DPC Responses to GL-95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves | NRC (Affiliation Not Assigned) | |
ML20247P812 | 20 May 1998 | Informs That Plant Plans to Replace Valves 1NI0009A & 1NI0010B During Unit 1,Cycle 13 Outage.Replacement Will Eliminate Pressure Locking Concern | Duke Energy Barron H | Office of Information Resources Management |
ML20309A747 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment and Systems | Duke Energy | Office of Nuclear Reactor Regulation |
NRC Generic Letter 1995-07 | 17 August 1995 | NRC Generic Letter 1995-007: Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves | Crutchfield D Office of Nuclear Reactor Regulation |