Semantic search

Jump to navigation Jump to search
 Issue dateTitle
05000400/FIN-2011011-02Noncompliance for Providing Inadequate Procedural Guidance for Post-Fire Safe Shutdown
05000400/FIN-2013002-04Number 1 Reactor Coolant Pump Seal Leakoff Line OVER-PRESSURIZATION
05000400/FIN-2014005-01Failure to Adequately Implement the Equipment Clearance Procedure
05000400/LER-2014-002Inadequate DC Cable Protection Could Adversely Affect Safe Shutdown
05000400/LER-2015-005Unrecognized Impact of Opening of Barrier Doors on High Energy Line Break Analysis
ENS 50197Inadequate Dc Cable Protection Could Adversely Affect Safe Shutdown
ENS 51178Unanalyzed Condition Due to Open High Energy Line Break Doors
ENS 54834Manual Reactor Trip Due to Dropped Control Rod
HNP-12-118, Response to Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012Response to Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
HNP-12-119, Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident27 November 2012Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
IR 05000400/200300729 April 2005Draft Letter to Carolina Power and Light from Ogle, Shearon Harris Nuclear Power Plant - NRC Fire Protection Inspection Report No. 05000400-2003-007
IR 05000400/200800221 April 2008IR 05000400-08-002 on 01/01/2008 - 03/31/2008 for Shearon Harris, Unit 1; Routine Integrated Report
IR 05000400/20110118 December 2011IR 05000400-11-011, on 08/29/2011 - 09/02/2011 & 09/19-23/2011; Shearon Harris Nuclear Plant, Unit 1; Triennial Fire Protection Inspection Report & Exercise of Enforcement Discretion
IR 05000400/201300230 April 2013IR 05000400-13-002: Carolina Power and Light Company; on January 1, 2013 - March 31, 2013; Shearon Harris Nuclear Power Plant, Unit 1; Operability Evaluations, Plant Modifications, and Event Follow-up
IR 05000400/201400527 January 2015IR 05000400/2014005; on October 1, 2014, Through December 31, 2014; Duke Energy Progress, Inc., Shearon Harris Nuclear Power Plant, Unit 1, Operability Determinations and Functionality Assessments
IR 05000400/202000427 January 2021Integrated Inspection Report 05000400/2020004
Information Notice 1986-53, Improper Installation of Heat Shrinkable Tubing26 June 1986Improper Installation of Heat Shrinkable Tubing
Information Notice 1987-05, Miswiring in a Westinghouse Rod Control System2 February 1987Miswiring in a Westinghouse Rod Control System
Information Notice 1987-67, Lessons Learned from Regional Inspections of Licensee Actions in Response to IE Bulletin 80-1131 December 1987Lessons Learned from Regional Inspections of Licensee Actions in Response to IE Bulletin 80-11
Information Notice 1987-67, Lessons Learned from Regional Inspections of Licensee Actions in Response to Ie Bulletin 80-1131 December 1987Lessons Learned from Regional Inspections of Licensee Actions in Response to Ie Bulletin 80-11
Information Notice 1989-55, Degradation of Containment Isolation Capability by a High-Energy Line Break30 June 1989Degradation of Containment Isolation Capability by a High-Energy Line Break
Information Notice 1991-38, Thermal Stratification in Feedwater System Piping13 June 1991Thermal Stratification in Feedwater System Piping
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
ML02267015722 March 2002August 2002 Exam 50-400/2002-301 Final Written SRO Exam
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
ML03338052318 November 2003IR 05000400-03-007, Shearon Harris, on 02/01/03 - 10/21/03, Significance Determination of Fire Protection Findings
ML04085049419 March 2004Comment (1) of Tony Groblewski Regarding Notice of Clarification of Steam Generator Tube Integrity Event Reporting Guideline in NUREG-1022
ML04236055923 February 2004E-mail, C. Ogle to Eng Branch, Fwd: Peer Review of Inspection Reports
ML04238028416 January 2004E-mail, C. Ogle to Eng Branch, Peer Review of Inspection Reports
ML05038036816 January 2004E-mail from C. Ogle to Eng. Branch - Peer Review of Inspection Reports
ML0503804433 February 2005Undated Draft, Revision 4, NRC Fire Protection Inspection Report No. 05000400/2003007
ML05144020912 May 2005G20050379 - Paul Gunter Ltr Re 2.206 - Inoperable Hemyc/Mt Fire Protection Systems
ML05152041023 October 2003Action Request 000997103
ML05152044527 May 2005Significant Adverse Condition Investigation Report
ML05174056227 June 2005G20050379 - Paul Gunter Ltr. 2.206 Inoperable Hemyc/Mt Fire Protection System
ML05263041120 October 2005G20050379 - Paul Gunter Ltr 2.206 Inoperable Hemyc/Mt Fire Protection Systems, Proposed Directors Decision
ML0533903119 January 2006G20050379 - Mr. Paul Gunter Ltr. Re. 2.206 - Inoperable Hemyc/Mt Fire Protection Systems
ML0533903529 January 2006FRN: All Nuclear Power Plants That Use Hemyc/Mt Fire Barriers Notice of Issuance of Director'S Decision Under 10 CFR 2.206
ML06264055020 September 2006G20060793 - John D. Runkle E-mail Re 2.206 - Recurring Fire Protection Issues at Shearon Harris Nuclear Plant
ML06298010721 September 2006G20060793 - 2.206 Supplement 1 Fire Protection Issues at the Shearon Harris Nuclear Power Plant
ML0707805372 April 2007G20060793 - Shearon Harris 2.206 Petition Proposed Director'S Decision
ML07150040313 June 20072.206 - Final Director'S Decision Under 10 C.F.R. 2.206, Denying Petitioners' Request to Not Accept the Licensee'S Application for License Renewal at Shearon Harris Plant, Unit 1
ML1121702332 August 2011Initial Exam 2011-301 Final RO Written Exam
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML13295A41617 October 2013301 Initial Exam Final SRO Written Exam
ML14338A0383 December 2014302 Final SRO Written Exam
ML15013A24513 January 2015Initial Exam 2014-302 Draft Sim_IN-Plant JPMs
ML15013A26713 January 2015Initial Exam 2014-302 Final Sim_IN-Plant JPMs