Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000331/1999010 | 17 August 1999 | Insp Rept 50-331/99-10 on 990802-06.No Violations Noted. Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support |
Information Notice 1985-62, Backup Telephone Number to the NRC Operations Center | 23 July 1985 | Backup Telephone Number to the NRC Operations Center |
Information Notice 1986-97, Emergency Communications System | 28 November 1986 | Emergency Communications System |
Information Notice 1989-20, Weld Failures in a Pump of Byron-Jackson Design | 24 February 1989 | Weld Failures in a Pump of Byron-Jackson Design |
Information Notice 1989-21, Changes in Performance Characteristics of Molded-Case Circuit Breakers | 27 February 1989 | Changes in Performance Characteristics of Molded-Case Circuit Breakers |
Information Notice 1989-23, Environmental Qualification of Litton-Veam Cir Series Electrical Connectors | 3 March 1989 | Environmental Qualification of Litton-Veam Cir Series Electrical Connectors |
Information Notice 1989-24, Nuclear Criticality Safety | 6 March 1989 | Nuclear Criticality Safety |
Information Notice 1989-25, Unauthorized Transfer of Ownership or Control of Licensed Activities | 7 March 1989 | Unauthorized Transfer of Ownership or Control of Licensed Activities |
Information Notice 1989-26, Instrument Air Supply to Safety-Related Equipment | 7 March 1989 | Instrument Air Supply to Safety-Related Equipment |
ML022610269 | 4 September 2002 | Emergency Plan Implementing Procedures EPIP 1.4 Rev. 4., and EPIP 2.3, Rev 6 |
ML032890250 | 8 October 2003 | 1 to EPIP 1.1, Revision 28 to EPIP 1.2, Revision 5 to EPIP 1.4, and Revision 5 to EPIP 1.5 |
ML20039H150 | 28 August 1981 | Public Version of Corporate Emergency Plan Implementing Procedures,Including Procedures CPIP-1.2 Re Personnel Assignment & Notification & CPIP-1.3 Re Emergency Operations Facility Activation |
ML20040E083 | 14 January 1982 | Public Version of Revised Emergency Plan & Corporate Plan Implementing Procedures,Including Proceduares Cpip 1.2 Re Personnel Assignment & Notification & Cpip 1.4 Re Emergency News Ctr Activation |
ML20069K754 | 26 October 1982 | Public Version of Revision 4 to Emergency Plan Implementing Procedure EPIP-2.2, Activation & Operation of Technical Support Ctr. Revision 11 to Procedures Index Encl |
ML20083G008 | 29 April 2020 | Issuance of Amendment No. 310 Changes to the Post-Shutdown Emergency Plan for Duane Arnold Energy Center |
ML20129D772 | 11 July 1985 | Discusses Replacement of Health Physics Network (HPN) W/Dedicated Commercial Circuits.Replacement HPN Commercial Circuits Will Be Routed Through Exchange at Telephone Company Central Ofc |
ML22144A002 | 14 September 2022 | Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan |
NRC Generic Letter 1991-14 | 23 September 1991 | NRC Generic Letter 1991-014: Emergency Telecommunications |