LR-N04-0089, Request for Changes to Technical Specifications, Containment Systems - Containment Cooling System | 15 April 2004 | Request for Changes to Technical Specifications, Containment Systems - Containment Cooling System | High Radiation Area |
LR-N04-0345, Request for Change to Technical Specifications to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | 27 September 2004 | Request for Change to Technical Specifications to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | Incorporated by reference Large early release frequency |
LR-N05-0036, Request for Changes to Technical Specifications Deletion of Reactor Coolant System Volume | 15 February 2005 | Request for Changes to Technical Specifications Deletion of Reactor Coolant System Volume | |
LR-N05-0094, Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon Corporation | 4 March 2005 | Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon Corporation | Safe Shutdown Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Excess Flow Check Valve Safeguards Contingency Plan Pressure Boundary Leakage Recently irradiated fuel Fire Protection Program Siren Affidavit |
LR-N05-0214, Request for Change to Technical Specifications Containment Isolation Valves | 26 September 2005 | Request for Change to Technical Specifications Containment Isolation Valves | Packing leak |
LR-N05-0220, Request for Change to Technical Specifications Refueling Operations and Special Test Exceptions | 7 December 2005 | Request for Change to Technical Specifications Refueling Operations and Special Test Exceptions | Anticipated operational occurrence |
LR-N05-0336, Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report | 19 August 2005 | Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report | Shutdown Margin Packing leak |
LR-N05-0386, Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | 2 August 2005 | Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | |
LR-N05-0392, Request for Change to Technical Specifications Accident Monitoring Instrumentation | 31 August 2005 | Request for Change to Technical Specifications Accident Monitoring Instrumentation | Shutdown Margin Reactor Vessel Water Level Post Accident Monitoring |
LR-N06-0051, Request for Amendment to Technical Specifications Maximum Allowable Power with Inoperable Steam Line Safety Valves | 6 April 2006 | Request for Amendment to Technical Specifications Maximum Allowable Power with Inoperable Steam Line Safety Valves | Anticipated operational occurrence Fuel cladding |
LR-N06-0213, Request for Amendment to Technical Specifications to Revise Topical Report References in Technical Specification 6.9.1.9, Core Operating Limits Report | 26 September 2006 | Request for Amendment to Technical Specifications to Revise Topical Report References in Technical Specification 6.9.1.9, Core Operating Limits Report | Safe Shutdown Nondestructive Examination Fire Protection Program |
LR-N06-0233, Request for Change to Technical Specifications Containment Ventilation System, Containment Isolation Valves | 4 August 2006 | Request for Change to Technical Specifications Containment Ventilation System, Containment Isolation Valves | High Radiation Area |
LR-N06-0248, Technical Specification 6.9.1.5 Annual Reports | 19 May 2006 | Technical Specification 6.9.1.5 Annual Reports | |
LR-N06-0309, Request for Changes to Technical Specifications Refueling Operations - Decay Time | 4 August 2006 | Request for Changes to Technical Specifications Refueling Operations - Decay Time | Ultimate heat sink |
LR-N07-0010, Response to RAIs on LCR S06-01, Request for Change to Technical Specifications to Add Steam Generator Tube Integrity Program | 19 January 2007 | Response to RAIs on LCR S06-01, Request for Change to Technical Specifications to Add Steam Generator Tube Integrity Program | Safe Shutdown Non-Destructive Examination Nondestructive Examination Pressure Boundary Leakage |
LR-N07-0023, Response to RAIs on LCR S06-07 Refueling Operations - Decay Time | 8 March 2007 | Response to RAIs on LCR S06-07 Refueling Operations - Decay Time | Ultimate heat sink |
LR-N07-0033, Response to RAIs on LCR S07-01 One Time License Change Request Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance) | 23 February 2007 | Response to RAIs on LCR S07-01 One Time License Change Request Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance) | |
LR-N07-0036, LCR S06-03 Supplement Request for Change to Technical Specifications Accident Monitoring Instrumentation and Source Check Definition | 21 February 2007 | LCR S06-03 Supplement Request for Change to Technical Specifications Accident Monitoring Instrumentation and Source Check Definition | Shutdown Margin |
LR-N07-0058, Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | 15 April 2007 | Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | Safe Shutdown Incorporated by reference |
LR-N07-0064, One Time License Change Request, Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance.) | 22 March 2007 | One Time License Change Request, Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance.) | |
LR-N07-0103, Units 1 & 2, Correction to Technical Specification Pages/Amendment 276 and 258 | 4 May 2007 | Units 1 & 2, Correction to Technical Specification Pages/Amendment 276 and 258 | |
LR-N08-0054, License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations | 5 March 2008 | License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations | |
LR-N09-0001, License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications | 5 January 2009 | License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications | Safe Shutdown Incorporated by reference Process Control Program Safeguards Contingency Plan EVT-1 Fire Protection Program Power Uprate |
LR-N10-0098, License Amendment Request - One Time On-Line Safety-Related Battery Replacement | 29 March 2010 | License Amendment Request - One Time On-Line Safety-Related Battery Replacement | Safe Shutdown Tornado Missile Turbine Missile GOTHIC |
LR-N10-0363, License Amendment Request: Changes to Snubber Surveillance Requirements | 4 October 2010 | License Amendment Request: Changes to Snubber Surveillance Requirements | Incorporated by reference |
LR-N11-0208, Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal | 6 July 2011 | Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal | Cyber Security |
LR-N12-0183, License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System | 17 July 2012 | License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System | Fuel cladding |
LR-N14-0074, License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor | 24 March 2014 | License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor | Surveillance Frequency Control Program |
LR-N15-0182, License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements | 12 October 2015 | License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements | |
LR-N15-0224, Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) | 25 November 2015 | Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) | Surveillance Frequency Control Program |
LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel | 11 February 2016 | Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel | Post Accident Monitoring Surveillance Frequency Control Program |
LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. | 4 February 2019 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. | Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Power change |
LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | 29 June 2022 | License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | |
ML021080414 | 11 April 2002 | Technical Specifications, Containment Leakage Rate Testing Program (Tac No. MB3838) | |
ML021430561 | 3 June 2002 | Corrected TS Page 6-19 | |
ML022880064 | 10 October 2002 | Units, 1 and 2, Tech Spec Pages for Amendments 252 and 233 Containment Spray Nozzles | |
ML022880122 | 10 October 2002 | Tech Spec Pages for Amendments 251 and 232 Refueling Operations - Fuel Decay Time Prior to Commencing Core Alterations or Movement of Irradiated Fuel | |
ML022880542 | 11 October 2002 | Units, 1 and 2, Tech Spec Pages for License Amendments 253 and 234 Change to Technical Spectifications - Normal and Emergency Power | Safe Shutdown Offsite Circuit |
ML022910246 | 20 September 2002 | Unit 2 Request for Change to Technical Specifications | Boric Acid Shutdown Margin |
ML030350491 | 5 November 2002 | Technical Specification Pages for Amendments 254 & 235 Elimination of Requirements for Post-Accident Sampling | |
ML031010241 | 10 April 2003 | Tech Spec Pages for Amendments 255 and 236 Technical Specification 6.12, High-Radiation Area. | Safe Shutdown Boric Acid Non-Destructive Examination Commercial Grade Dedication Coatings Temporary Modification Significance Determination Process Foreign Material Exclusion Maintenance Rule Program Through Wall Leak Fire Protection Program |
ML031070078 | 16 April 2003 | 1 & 2 Issuance of Amendment TS Pages on Missed Surveillances Using Consolidated Line Item Improvement Process | Time of Discovery High Radiation Area Offsite Dose Calculation Manual Missed surveillance Process Control Program Grace period |
ML031740439 | 20 June 2003 | Technical Specification Changes and Correction Pages | Ultimate heat sink |
ML031770170 | 13 June 2003 | TS Pages for Salem Generating Station, Units 1 & 2 | |
ML031810198 | 26 June 2003 | Tech Spec for Salem, Unit 1, 3/4.7.6 Control Room Emergency Air a Conditioning System | |
ML032751130 | 1 October 2003 | Technical Specification Pages for Salem Nuclear Generating Station, Units 1 and 2, Issuance of License Amendments Table 3.31, Reactor Trip System Instrumentation | |
ML033030343 | 28 October 2003 | Technical Specification Pages for Amendments 260 & 241, Modifying Technical Specification Surveillance Requirements 4.3.1.1.3 & 4.3.2.1.3 | |
ML040330719 | 29 January 2004 | TS Pages | |
ML040400238 | 6 February 2004 | Tech Spec Pages for Amendments 262 & 244 Spent Fuel Pool Boron Concentration | Boric Acid Shutdown Margin Ultimate heat sink |
ML042610312 | 16 September 2004 | Units, 1 and 2, Technical Specifications, Relax Technical Specification Requirements Applicable During Movement of Irradiated Fuel | Shutdown Margin Ultimate heat sink |