Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-84-930, Safety Evaluation Supporting Amends 105 & 99 to Licenses DPR-31 & DPR-41,respectively | 24 August 1984 | Safety Evaluation Supporting Amends 105 & 99 to Licenses DPR-31 & DPR-41,respectively | |
IA-87-213, SER Finding Facility Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 3,except for Accumulator Tank Level & Pressure Instrumentation,Containment Sump Water Temp Instrumentation & Quench Tank Temp Instrumentation | 11 June 1986 | SER Finding Facility Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 3,except for Accumulator Tank Level & Pressure Instrumentation,Containment Sump Water Temp Instrumentation & Quench Tank Temp Instrumentation | Boric Acid |
ML20055H915 | 27 July 1990 | Safety Evaluation Accepting Actions Taken to Resolve NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generators Tubes | |
ML20056D961 | 30 July 1993 | SER Accepting Licensee 930325-0429 Submittals of Technical Info to Support Continued Operation of Facility for Remainder of Fuel Cycle 7 | Stress corrosion cracking Operational leakage |
ML20056H319 | 24 August 1993 | SER Accepting Proposed TS Changes Re RWST & Cla Boron Concentrations | Shutdown Margin Systematic Assessment of Licensee Performance |
ML20057A036 | 26 August 1993 | Safety Evaluation Supporting Amends 138 & 120 to Licenses NPF-9 & NPF-17,respectively | Shutdown Margin |
ML20057F412 | 12 October 1993 | Safety Evaluation Re Inservice Testing Program Requests for Relief.Alternatives Authorized Per 10CFR50.55a(a)(3) or Relief Granted Per 10CFR50.55a(f)(6)(i) | |
ML20058N796 | 9 August 1990 | Safety Evaluation Approving Relief Request 89-01 Re ASME Code Test Requirements for Nuclear Svc Water Sys | Hydrostatic |
ML20059G860 | 29 October 1993 | SE Granting 921130 Request for Relief from Requirements of 1986 Edition of ASME Boiler & Pressure Vessel Code,Section XI Re Inservice Insp of safety-related Snubbers During Second 10-yr Interval | |
ML20126H317 | 28 December 1992 | Safety Evaluation Granting Extension of First 10-yr ISI Interval to Coincide W/Start of end-of-cycle 8 Refueling Outage | Hydrostatic Incorporated by reference |
ML20126J360 | 30 April 1981 | Safety Evaluation Re Emergency Preparedness Evaluation Rept | |
ML20128F992 | 21 June 1985 | SER Based on Util 831104 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review Program Description & Procedures. Program & Procedures Acceptable | |
ML20128G111 | 21 June 1985 | SER of Util Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review (Data & Info Capability).Response to Item 1.2 Complete & Acceptable | |
ML20128H904 | 1 July 1985 | Safety Evaluation Supporting Amend 63 to License DPR-61 | |
ML20128H944 | 1 July 1985 | Safety Evaluation Supporting Amend 103 to License DPR-21 | |
ML20129A902 | 24 August 1984 | Safety Evaluation Supporting Amends 105 & 99 to Licenses DPR-31 & DPR-41,respectively | |
ML20129D552 | 30 May 1985 | SER Accepting Licensee Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review Program Description & Procedure | |
ML20129E485 | 1 October 1996 | Safety Evaluation Recommending That Relief Request 96-02 Be Granted,Per 10CFR50.55a(g)(6)(i),per Request | Incorporated by reference |
ML20129H793 | 14 December 1984 | Sser Re Fire Protection Program.Proposed License Condition for Fire Protection Program & SALP Input Encl | Fire Protection Program |
ML20129H907 | 11 July 1985 | SER Accepting 850605 Submittal Re Generic Ltr 83-28,Item 1.1 on post-trip Review Program & Procedures | |
ML20134B822 | 6 August 1985 | Sser Supporting Dcrdr | |
ML20134G555 | 7 November 1996 | Safety Evaluation Accepting Proposed Application of BWU-Z CHF Correlation for Plants Mark-BW 17x17 Type Fuel | |
ML20134L408 | 19 November 1996 | SER Accepting Performance of Plant Standby Nuclear Svc Water Pond | Ultimate heat sink |
ML20134P242 | 20 February 1997 | Safety Evaluation Accepting TR BAW-10199P for Ref in Plants Licensing Documentation & Use in Licensing Applications | |
ML20135B305 | 27 February 1997 | Safety Evaluation Granting Second 10 Yr ISI Program Plan & Associated Requests for Relief | Incorporated by reference |
ML20136E400 | 10 December 1985 | Safety Evaluation Supporting Amends 71,108 & 106 to Licenses DPR-61,DPR-21 & DPR-65,respectively | |
ML20136G790 | 12 August 1985 | Safety Evaluation Supporting Amend 64 to License DPR-61 | |
ML20136G803 | 12 August 1985 | Safety Evaluation Supporting Amend 105 to License DPR-21 | |
ML20136G835 | 12 August 1985 | Safety Evaluation Supporting Amend 103 to License DPR-65 | |
ML20137T887 | 6 February 1986 | Safety Evaluation Supporting SPDS as Interim Implementation Until Open Issues Resolved.Issues Include Hot Leg Temp,Rhr Flow Rate,Stack Monitor,Steam Generator Radiation & Containment Isolation | |
ML20137Y176 | 28 February 1986 | SER Accepting SPDS for Interim Implementation Until Listed Open Items Resolved | |
ML20138A871 | 7 October 1985 | Sser Supporting Util 850725 Proposed FSAR Change, Incorporating Nuclear Const Issues Group Rev 2 to Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants Into FSAR Table 3.8-2 & Section 3.10.3.2.2 | |
ML20138H065 | 21 October 1985 | Safety Evaluation Denying Util 850812 Application to Amend Tech Specs to Permit Qualified Offsite Licensee Personnel or Independent Consultant to Perform Fire Protection Audit. Generic Ltr 82-21 Should Be Utilized | Fire Barrier Fire Protection Program |
ML20138M901 | 17 December 1985 | Draft SER on Util 850329 Response to 841003 Request for Addl Info Re Hydrogen Control Measures for Plant.Addl Info & Analyses Required Re Effect of Upper Compartment Burns on Air Return Fan | Overspeed trip |
ML20138P606 | 9 October 1985 | SER Accepting Licensee Response to Items 3.1.3 & 3.2.3 of Generic Ltr 83-28.No post-maint Test Requirements Found in Tech Specs That Degraded Safety | |
ML20138R584 | 31 October 1985 | Safety Evaluation Accepting Util Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.1.3,3.2.1,3.2.2,3.2.3,4.1 & 4.5.1 | |
ML20138S055 | 30 November 1985 | SER Supporting Util Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Test Requirements | |
ML20140G573 | 15 July 1975 | Safety Evaluation Supporting Tech Spec Changes to License DPR-59 to Revise Suppression Pool Water Temp Limits | |
ML20140G933 | 5 April 1982 | SER Input Re Design of Category 1 Structures & Remedial Actions.Completion of SER Controlled by Util Response to NRC Request for Info Re Soil Remedial Actions | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Hydrostatic Earthquake |
ML20141D223 | 26 March 1986 | Safety Evaluation Suporting Util 801104,810303,0626,821203 & 851231 Responses to IE Bulletin 80-11, Masonry Wall Design. Technical Evaluation Rept Encl | |
ML20141E112 | 16 June 1997 | Safety Evaluation Approving Licensee Position That UFSAR Table 6-77 Be Revised to Identify SA-1 & SA-4 Instead of SA-3 & SA-6 as Containment Isolation Valves | Local Leak Rate Testing Excess Flow Check Valve Exemption Request |
ML20141G670 | 20 May 1997 | Safety Evaluation Accepting Proposed Alternative Use of TS Requirement for Code Class Snubbers | Incorporated by reference |
ML20147D963 | 25 February 1988 | Safety Evaluation Accepting Util 860404 Evaluation of Environ Qualification of Equipment Considering Superheat Effects of high-energy Line Breaks for Plants,Per IE Info Notice 84-90 | |
ML20147E926 | 23 February 1988 | Safety Evaluation Supporting Amends 100,14,125 & 15 to Licenses DPR-61,DPR-21,DPR-65 & NPF-45,respectively | |
ML20148B945 | 19 October 1978 | SER Supporting Amend 1 to CPPR-117,verifying That North Carolina Municipal Power Agency Fully Qualified to Participate in Plant Ownership | |
ML20148H100 | 22 January 1988 | Safety Evaluation Supporting Util 871113 Proposed Tech Spec Changes Reflecting Unit 2 Cycle 2 Refueling & Addition of Boron Dilution Mitigation Sys for Unit 2 | Shutdown Margin |
ML20148H250 | 5 June 1997 | Safety Evaluation Accepting Proposed Restructuring of Util Through Acquisition Of,& Merger W/Panenergy Corp | |
ML20148S223 | 2 July 1997 | Safety Evaluation Accepting Supplemental Test Program for Relief Request 1.4.2 for Units 1 & 2 | |
ML20149K828 | 29 July 1997 | SER Granting Request for Exemption from Requirements of 10CFR70.24 for Units 1 & 2 | |
ML20150C261 | 28 June 1988 | Safety Evaluation Supporting Licensee Assessment to Fracture Toughness Requirements for Protection Against PTS Events,Per 10CFR50.61 |