ML20136E400

From kanterella
Jump to navigation Jump to search

Safety Evaluation Supporting Amends 71,108 & 106 to Licenses DPR-61,DPR-21 & DPR-65,respectively
ML20136E400
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 12/10/1985
From: Osborne D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20136E351 List:
References
TAC-55328, TAC-59258, NUDOCS 8601060539
Download: ML20136E400 (3)


Text

>

  1. pa nen,q#o UNITED STATES

_g

,f g NUCLEAR REGULATORY COMMISSION

$ E WASHINGTON, D. C. 20555

\.....}

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 71 TO FACILITY OPERATING LICENSE NO. DPR-61 l

AMENDMENT N0.108 TO PROVISIONAL OPERATING LICENSE NO. DPR-21, 1

! AND AMENDMENT N0. 106 TO FACILITY OPERATING LICENSE NO. DPR-65 NORTHEAST NUCLEAR ENERGY COMPANY, ET AL.

HADDAM NECK PLANT, AND l

i MILLSTONE NUCLEAR POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-213, 50-245 AND 50-336

'I

i. INTRODUCTION By letter dated July 9, 1985, Northeast Utilities proposed to change the Tech-nical Specifications for the Haddam Neck Plant and f.or Millstone Nuclear Power Station, Units 1 and 2. The change would add to the Technical Specifi-cations for each plant a Section 6.2.2.g comitting to the development and L'

implementation of administrative procedures regarding working hours generally in accordance with the guidance of the NRC Policy Statement on working hours.

EVALUATION AND DISCUSSION

.._ In an earlier letter to the NRCI Northeast Utilities stated that there would . .

! be only one policy governing overtime at all of the Northeast Utilities' nuclear ~

units. As part of the staff review of the Final Safety Analysis Report for Millstone Nuclear Power Station, Unit 3 the staff examined in detail the licensee's policy and procedures for control of overtime at the Northeast Utilities nuclear plants. These are presented, respectively, in NE0 Policy Statement 21, Rev. O. " Overtime Controls for Personnel Working at the Operating Nuclear Stations " dated August 31, 1984; and Nuclear Engineering and Operation Procedure 1.09 (NEO 1.09), " Overtime Controls for Personnel

[ Working at the Operating Stations," Rev. O, dated December 14, 1984. The i staff concluded in its Safety Evaluation input for Millstone Unit 3, dated May 15, 1985, that the policy and procedure as described in NEO Policy State-ment 21 and in NEO 1.09 meet the intent of Generic Letter 82-12 and are i acceptable.

I I Since the same policy and procedure as reviewed for Millstone, Unit 3, are I applicable to Haddam Neck and to Millstone, Units 1 and 2, the f. toff concludes I that the overtime policy and procedure are also acceptable for Haddam Neck i and Millstone, Units 1 and 2. Thus, we conclude that the proposed changes to the individual plant Technical Specifications are acceptable.

! os39 851210 jy10jDock05000213 p

j ,

PDR g _ _ . . _ _ _ . _ _ . _ _ . __ ___._ _ ___ _ _, . , . _ , ,

i

)

ENVIRONMENTAL CONSIDERATION -

i These amendments relate to changes in recordkeeping, reporting, or administrative procedures or requirements. Accordingly, these amendments meet the eligibility I criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b) no environental impact statement or environmental assessment need be prepared in connection with the issuance of these amendments.

! CONCLUSION We have concluded, based on the considerations discussed above, that (1) therc is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations, and the issuance of the amendments will not be inimical to the common defense and security or to l the health and safety of the public.

g .

Date: December 10, 1985 Principal Contributer:

L. Crocker i

I- '

I

., . . - . - - - - - _ - - - . - - . ~ . . . - . -

n, I

Y. .

, References I

(1) Letter, W. G. Counsil to J. R. Miller, J. A. Zwolinski and B.J. Youngblood, file A04421, "Haddam Neck Plant, Millstone Nuclear Power Station, Units 1, 2, and 3, Technical Specifications for Limiting Overtime for Staff Personnel,"

dated November 9, 1984.

b i

L l

F F

I i

l I

k i

i 1 I e

L