L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. | 24 May 2018 | Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. | Aging Management |
L-2015-179, Response to Request for Additional Information Regarding the Spring 2014 Steam Generator Tube Inspections | 18 June 2015 | Response to Request for Additional Information Regarding the Spring 2014 Steam Generator Tube Inspections | |
L-2015-211, Response to Request for Additional Information Regarding License Amendment for Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants | 21 August 2015 | Response to Request for Additional Information Regarding License Amendment for Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants | Safe Shutdown Operator Manual Action Large early release frequency |
L-2015-258, Request for Additional Reply for License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection Commitment | 6 October 2015 | Request for Additional Reply for License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection Commitment | Hydrostatic |
L-2015-259, ANP-3440NP, Revision 1, Response to NRC Questions SRXB-RAI-1 and Snpb RAI-2 Thru Snpb RAI-20. | 2 October 2015 | ANP-3440NP, Revision 1, Response to NRC Questions SRXB-RAI-1 and Snpb RAI-2 Thru Snpb RAI-20. | Loop seal Anticipated operational occurrence Exemption Request |
L-2015-270, Request for Additional Information Reply Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements | 23 October 2015 | Request for Additional Information Reply Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements | High Radiation Area Offsite Dose Calculation Manual Incorporated by reference Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program |
L-2015-279, RAI Response Clarification for SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel | 3 November 2015 | RAI Response Clarification for SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel | Exemption Request |
L-2015-304, RAI Reply for the Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents | 15 December 2015 | RAI Reply for the Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents | |
L-2016-018, Response to Request for Additional Information Fourth Ten-Year Inservice Inspection Interval License - Amendment Request Changes to Snubber Surveillance Requirements | 28 January 2016 | Response to Request for Additional Information Fourth Ten-Year Inservice Inspection Interval License - Amendment Request Changes to Snubber Surveillance Requirements | Incorporated by reference |
L-2016-040, License Renewal Commitments, Reactor Vessel Internals Aging Management Plan, Response to Request for Additional Information | 26 February 2016 | License Renewal Commitments, Reactor Vessel Internals Aging Management Plan, Response to Request for Additional Information | Aging Management |
L-2016-084, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States. | 20 April 2016 | Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States. | Safe Shutdown Shutdown Margin |
L-2016-096, Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 | 21 April 2016 | Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 | VT-2 Pressure Boundary Leakage |
L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes | 6 May 2016 | RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes | GOTHIC |
L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle | 6 May 2016 | RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle | |
L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. | 8 July 2016 | Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. | Probabilistic Risk Assessment Surveillance Frequency Control Program |
L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | 22 July 2016 | Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Mission time Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents | 15 July 2016 | Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents | Surveillance Frequency Control Program |
L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes | 11 August 2016 | Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes | |
L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) | 3 November 2016 | Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) | |
L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change | 5 December 2016 | License Amendment Request EDG Day Tank Fuel Volume Change | |
L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 | 3 July 2017 | Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 | |
L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 | 13 September 2017 | Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 | |
L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 | 30 November 2017 | Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 | |
L-2017-210, Updated Final Response to NRC Generic Letter 2004-02 | 20 December 2017 | Updated Final Response to NRC Generic Letter 2004-02 | Boric Acid Mission time Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Foreign Material Exclusion Exemption Request Earthquake Fuel cladding |
L-2017-216, License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 | 19 December 2017 | License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 | Aging Management EVT-1 |
L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b | 1 February 2018 | Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Safe Shutdown Earthquake Probabilistic Risk Assessment Fire Protection Program Very Early Warning Fire Detection |
L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply | 14 February 2018 | Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply | Surveillance Frequency Control Program Power change |
L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations | 3 April 2018 | Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations | Decommissioning Funding Plan Authorized possession limits |
L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies | 17 August 2018 | Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies | |
L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies | 15 November 2018 | Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies | Shutdown Margin Anticipated operational occurrence Power change |
L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request | 7 March 2019 | Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request | |
L-2019-107, License Amendment Request - Iodine Removal System Elimination | 17 May 2019 | License Amendment Request - Iodine Removal System Elimination | Boric Acid |
L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation | 28 June 2019 | Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program |
L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | 24 July 2019 | Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | Safe Shutdown Hydrostatic Multiple Spurious Operation FLEX Surveillance Frequency Control Program Offsite Circuit Continuous fire watch Early Warning Fire Detection |
L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | 25 July 2019 | Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG | Safe Shutdown Hydrostatic Multiple Spurious Operation FLEX Offsite Circuit Continuous fire watch Early Warning Fire Detection |
L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control | 11 September 2019 | Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control | |
L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response | 21 August 2019 | Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response | |
L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | 30 April 2020 | Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | |
L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | 26 June 2020 | Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements | |
L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-02 | 4 December 2020 | Supplement to Updated Final Response to NRC Generic Letter 2004-02 | |
L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years | 1 April 2021 | Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years | |
L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements | 12 May 2021 | Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements | |
L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response | 19 January 2022 | License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Qualified Offsite Circuit Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit Power change Power Uprate |
L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response | 13 June 2022 | Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response | Weld Overlay Aging Management Subsequent License Renewal |
L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response | 11 July 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response | Boric Acid Ultimate heat sink Fire Barrier Weld Overlay Coatings Finite Element Analysis Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal EVT-1 Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld Power Uprate |
L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment | 9 August 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment | Boric Acid Ultimate heat sink Nondestructive Examination Aging Management Foreign Material Exclusion License Renewal Subsequent License Renewal Power Uprate Measurement Uncertainty Recapture |
L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response | 8 September 2022 | Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response | Boric Acid Coatings Aging Management |
L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response | 19 September 2022 | Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response | Aging Management |
L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response | 26 October 2022 | Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response | Operating Basis Earthquake Aging Management License Renewal Earthquake |
L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 | 27 March 2023 | Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 | Coatings Aging Management License Renewal Subsequent License Renewal |