LR-N15-0092, Compliance with NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information | 28 July 2015 | Compliance with NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information | Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies Fire Protection Program |
LR-N15-0256, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 23 December 2015 | High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Safe Shutdown Earthquake Fukushima Dai-Ichi |
LR-N16-0105, Request for Additional Information Regarding Relief Requests Associated with the Fourth 10-Year Lnservice Test Interval | 10 June 2016 | Request for Additional Information Regarding Relief Requests Associated with the Fourth 10-Year Lnservice Test Interval | Incorporated by reference Condition Adverse to Quality Maintenance Rule Program |
LR-N16-0109, and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 17 | 15 June 2016 | and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 17 | |
LR-N16-0119, Response to Request for Additional Information Regarding Review of Post-Extended Power Uprate Steam Dryer Stress Calculation Acoustic Circuit Model Software Error | 29 June 2016 | Response to Request for Additional Information Regarding Review of Post-Extended Power Uprate Steam Dryer Stress Calculation Acoustic Circuit Model Software Error | Downpower |
LR-N16-0137, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External | 24 August 2016 | Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External | High winds FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
LR-N16-0148, Supplemental Information Regarding Request for Relaxation from the Hardened Containment Vent Release Point Height Requirement of NRC Order EA-13-109 | 7 September 2016 | Supplemental Information Regarding Request for Relaxation from the Hardened Containment Vent Release Point Height Requirement of NRC Order EA-13-109 | FLEX |
LR-N16-0165, Transmittal of Response to Request for Additional Information Regarding Digital Power Range Neutron Monitoring (Prnm) System Upgrade | 23 September 2016 | Transmittal of Response to Request for Additional Information Regarding Digital Power Range Neutron Monitoring (Prnm) System Upgrade | Safety Limit Minimum Critical Power Ratio |
LR-N16-0174, Response to Second Request for Additional Information Regarding Relief Request VR-02 Associated with the Fourth 10-Year Inservice Test Interval | 23 September 2016 | Response to Second Request for Additional Information Regarding Relief Request VR-02 Associated with the Fourth 10-Year Inservice Test Interval | |
LR-N16-0192, Response to Request for Additional Information Stuck Open Safety/Relief Valves | 13 December 2016 | Response to Request for Additional Information Stuck Open Safety/Relief Valves | Surveillance Frequency Control Program |
LR-N16-0226, Response to Request for Additional Information, Regarding Removing Certain Training Requirements | 19 December 2016 | Response to Request for Additional Information, Regarding Removing Certain Training Requirements | Nondestructive Examination |
LR-N16-0231, Response to Request for Additional Information, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling | 27 December 2016 | Response to Request for Additional Information, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling | Reactor Vessel Water Level |
LR-N16-0232, Response to Prelim White Finding in Integrated Inspection Report 05000354/2016003 | 14 December 2016 | Response to Prelim White Finding in Integrated Inspection Report 05000354/2016003 | Hot Short High winds Probabilistic Risk Assessment FLEX Significance Determination Process B.5.b Mitigating Strategies Preliminary White Finding |
LR-N17-0063, Response to Request for Additional Information, Permanently Extend Type a and Type C Leak Rate Test Frequencies | 27 March 2017 | Response to Request for Additional Information, Permanently Extend Type a and Type C Leak Rate Test Frequencies | High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Large early release frequency B.5.b Mitigating Strategies |
LR-N17-0109, Response to Final Request for Additional Information (Rai), Permanently Extend Type a and Type C Leak Rate Test Frequencies | 13 July 2017 | Response to Final Request for Additional Information (Rai), Permanently Extend Type a and Type C Leak Rate Test Frequencies | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency |
LR-N17-0125, Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | 11 August 2017 | Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | Safe Shutdown Unanalyzed Condition Time of Discovery Fitness for Duty High winds Shutdown Margin Reactor Vessel Water Level Packing leak Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Grace period Power change |
LR-N17-0126, Response to Request for Additional Information (Rai), P-T Limit Report License Amendment Application | 5 September 2017 | Response to Request for Additional Information (Rai), P-T Limit Report License Amendment Application | Pressure and Temperature Limits Report |
LR-N17-0161, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | 1 November 2017 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | Safe Shutdown Fire Protection Program |
LR-N17-0170, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | 27 November 2017 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | Anticipated operational occurrence |
LR-N17-0175, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | 19 December 2017 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | Coatings |
LR-N17-0176, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate | 14 December 2017 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate | Anticipated operational occurrence |
LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | 19 December 2017 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | |
LR-N17-0186, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | 19 December 2017 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | |
LR-N17-0187, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | 19 December 2017 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | Power change |
LR-N17-0189, Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | 22 December 2017 | Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate | Anticipated operational occurrence Coatings Multiple Spurious Operation MELLLA Power Uprate Measurement Uncertainty Recapture Affidavit |
LR-N18-0061, Response to Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 27 June 2018 | Response to Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
LR-N18-0073, Supplement to License Amendment Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 19 July 2018 | Supplement to License Amendment Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Reactor Vessel Water Level Water Inventory Control |
LR-N18-0107, Response to Request for Additional Information, License Amendment Request Inverter Allowed Outage Time (AOT) Extension (Electrical Branch) | 17 October 2018 | Response to Request for Additional Information, License Amendment Request Inverter Allowed Outage Time (AOT) Extension (Electrical Branch) | Anticipated operational occurrence |
LR-N18-0109, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension | 17 October 2018 | Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension | Internal Flooding Probabilistic Risk Assessment |
LR-N20-0043, PSEG Nuclear LLC - Response to Request for Additional Information, Adopt 10 CFR 50.69 LAR | 25 June 2020 | PSEG Nuclear LLC - Response to Request for Additional Information, Adopt 10 CFR 50.69 LAR | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference FLEX Fukushima Dai-Ichi Significance Determination Process Large early release frequency |
LR-N20-0069, Response to Final Request for Additional Information Regarding Revise Technical Specifications Requirements for High Pressure Coolant Injection System Inoperability | 4 November 2020 | Response to Final Request for Additional Information Regarding Revise Technical Specifications Requirements for High Pressure Coolant Injection System Inoperability | |
LR-N21-0018, Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication | 29 April 2021 | Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication | Anticipated operational occurrence |
LR-N21-0040, Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication | 27 May 2021 | Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication | |
LR-N22-0011, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink | 1 February 2022 | Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink | Ultimate heat sink |
ML16305A238 | 31 October 2016 | Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spend Fuel Pools | |
ML19280A000 | 3 October 2019 | NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) | Minimum staff |
ML19308A595 | 4 November 2019 | Response to Request for Additional Information, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements | Minimum staff |