Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML023380388 | 26 November 2002 | Defueled Safety Analysis Report, Amendment 5 | Grab sample Offsite Dose Calculation Manual Decommissioning Funding Plan Annual Radioactive Effluent Release Report Process Control Program Chernobyl Fire Protection Program |
ML041560450 | 27 May 2004 | Biennial Report | Decommissioning Funding Plan Liquid penetrant Fire Protection Program |
ML051020434 | 7 April 2005 | Radionuclides for Consideration During Rancho Seco Site Characterization or Final Status Surveys | Boric Acid Packing leak Grab sample Offsite Dose Calculation Manual Emergency Lighting Annual Radiological Environmental Operating Report Process Control Program Earthquake Fire Watch |
ML052020244 | 13 July 2005 | Decommissioning Technical Basis Document | |
ML060810160 | 15 March 2006 | Hydrogeological Characterization of Rancho Seco | Boric Acid |
ML061430212 | 30 April 2006 | Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station License Termination Plan, Rev. 0. Cover to Chapter 2, Figure 2-31 | Boric Acid Offsite Dose Calculation Manual Hydrostatic Decommissioning Funding Plan Annual Radiological Environmental Operating Report Process Control Program |
ML061430213 | 30 April 2006 | Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station License Termination Plan, Rev. 0. Chapter 2 - Site Characterization to Chapter 5 - Final Status Survey Plan | Coatings Annual Radioactive Effluent Release Report Fatality |
ML061430214 | 30 April 2006 | Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station License Termination Plan, Rev. 0. Chapter 6. Compliance with the Radiological Criteria for License Termination Through End | Offsite Dose Calculation Manual Coatings Decommissioning Funding Plan Process Control Program Earthquake Environmental Justice |
ML061460098 | 30 April 2006 | License Termination Plan, Rev 0, Table of Contents | Decommissioning Funding Plan |
ML061460100 | 30 April 2006 | License Termination Plan, Glossary of Terms, Acronyms and Abbreviations | Offsite Dose Calculation Manual Hydrostatic Process Control Program |
ML061460101 | 30 April 2006 | License Termination Plan, Chapter 1, General Information | |
ML061460103 | 30 April 2006 | License Termination Plan, Chapter 2, Site Characterization | Boric Acid Annual Radiological Environmental Operating Report |
ML061460105 | 30 April 2006 | License Termination Plan, Chapter 2, Site Characterization, Appendix 2-A, Miscellaneous Historical Construction Photographs | |
ML061460110 | 30 April 2006 | License Termination Plan, Chapter 3, Identification of Remaining Decommissioning Activities | Annual Radioactive Effluent Release Report |
ML061460113 | 30 April 2006 | License Termination Plan, Chapter 4, Site Remediation Plan | |
ML061460116 | 30 April 2006 | License Termination Plan, Chapter 5, Final Status Survey Plan | Coatings |
ML061460129 | 30 April 2006 | License Termination Plan, Chapter 6, Compliance with the Radiological Criteria for License Termination | |
ML061460152 | 30 April 2006 | License Termination Plan, Chapter 6, Compliance with the Radiological Criteria for License Termination, Appendix 6-A, Resrad Parameters for Soil Dose Modeling Probabilistic Analysis | |
ML061460154 | 30 April 2006 | License Termination Plan, Chapter 7, Update of Site-Specific Decommissioning Costs | Coatings Decommissioning Funding Plan |
ML062220351 | 3 August 2006 | Historical Site Assessment, Revision 1 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Earthquake |
ML071520399 | 30 May 2007 | Fy 2007 Final Fee Rule Workpapers | |
ML073450573 | 7 December 2007 | Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Dated December 7, 2007 | |
ML081490330 | 19 May 2008 | Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2006 Through April 30, 2008 | Offsite Dose Calculation Manual Decommissioning Funding Plan |
ML090480582 | 29 August 2008 | Confirmatory Survey Results for Activities Performed in April and May 2008 for the Rancho Seco Nuclear Generating Station | |
ML090510029 | 12 March 2008 | Confirmatory Survey Results for Activities Performed in December 2007, Rancho Seco Nuclear Generating Station | |
ML091280548 | 30 April 2009 | Draft Confirmatory Survey Report for the Rancho Seco Containment Building by Oak Ridge Institute for Science and Education (Orise) | |
ML091350468 | 6 May 2009 | Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) | |
ML091470103 | 7 May 2009 | Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) | |
ML092050215 | 21 July 2009 | Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station | |
ML12165A472 | 31 May 2012 | and Independent Spent Fuel Storage Installation - Biennial Report for the Period May 1, 2010 Through April 30, 2012 | Decommissioning Funding Plan |
ML12321A030 | 5 November 2012 | Radioactive Material Storage and Decommissioning Safety Analysis Report Amendment 1 | Offsite Dose Calculation Manual Decommissioning Funding Plan Annual Radioactive Effluent Release Report Process Control Program Fire Protection Program |
ML14099A257 | 31 March 2014 | Report on Irradiated Fuel Management Funding Status | Aging Management |
ML14219A327 | 24 July 2014 | Biennial Report | Decommissioning Funding Plan |
ML14310A197 | 30 October 2014 | Biennial Update to Rancho Seco License Termination Plan | Coatings Decommissioning Funding Plan |
ML16208A109 | 14 July 2016 | Sacramento Municipal Utility District (Smud), Rancho Seco Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Biennial Report for May 2014 - April 2016 | Decommissioning Funding Plan |
ML17065A034 | 28 February 2017 | Final Status Survey Summary Report | |
ML17065A035 | 23 November 2016 | Final Status Survey Report, September 26, 2016, Iosb Storage Cell B-2, Survey Unit F8300203 | |
ML17065A036 | 10 November 2016 | Final Status Survey Report, October 14, 2016, Iosb DAW Bay, Survey Unit F8300013 | |
ML17065A037 | 30 December 2016 | Final Status Survey Report, October 20, 2016, Iosb Storage Cell A-3, Survey Unit F8300183 | |
ML17065A038 | 8 November 2016 | Final Status Survey Report, October 21, 2016, Iosb Storage Cell A-1, Survey Unit F8300163 | |
ML17065A040 | 17 November 2016 | Final Status Survey Report, October 21, 2016, Iosb Storage Cell B-1, Survey Unit F8300193 | |
ML17065A041 | 14 November 2016 | Final Status Survey Report, October 21, 2016, Iosb Storage Cell C-1, Survey Unit F8300223 | |
ML17065A046 | 26 January 2017 | Final Status Survey Summary Report, October 21, 2016, Iosb Exterior Surfaces, Survey Unit F8300313 | |
ML17065A047 | 30 January 2017 | Final Status Survey Summary Report, October 3, 2016, Iosb Roof, Survey Unit F8300153 | |
ML17065A048 | 4 January 2017 | Final Status Survey Summary Report, November 7, 2016, Iosb Storage Cell B-3, Survey Unit F8300213 | |
ML17065A049 | 14 December 2016 | Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell E-2, Survey Unit F8300293 | |
ML17065A051 | 14 December 2016 | Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell D-2, Survey Unit F8300263 | |
ML17065A052 | 15 December 2016 | Final Status Survey Summary Report, December 1, 2016, Iosb Storage Cell C-3, Survey Unit F8300243 | |
ML17065A053 | 22 December 2016 | Final Status Survey Summary Report, December 12, 2016, Iosb Storage Cell D-3, Survey Unit F8300273 | |
ML17065A054 | 29 December 2016 | Final Status Survey Summary Report, December 13, 2016, Iosb Storage Cell E-3, Survey Unit F8300303 |