Information Notice 1982-28, Hydrogen Explosion While Grinding in the Vicinity of Drained and Open Reactor Coolant System | 23 July 1982 | Hydrogen Explosion While Grinding in the Vicinity of Drained and Open Reactor Coolant System | Brachytherapy |
Information Notice 1982-53, Main Transformer Failures at North Anna Nuclear Power Station | 22 December 1982 | Main Transformer Failures at North Anna Nuclear Power Station | Main transformer failure |
Information Notice 1983-41, Actuation of Fire Suppression System Causing Inoperability of Safety Related Equipment | 22 June 1983 | Actuation of Fire Suppression System Causing Inoperability of Safety Related Equipment | Safe Shutdown Fire Watch |
Information Notice 1983-69, Improperly Installed Fire Dampers at Nuclear Power Plants | 21 October 1983 | Improperly Installed Fire Dampers at Nuclear Power Plants | Fire Barrier |
Information Notice 1983-83, Use of Portable Radio Transmitters Inside Nuclear Power Plants | 19 December 1983 | Use of Portable Radio Transmitters Inside Nuclear Power Plants | |
Information Notice 1984-09, Lessons Learned from NRC Inspections of Fire Protection Safe Shutdown Systems (10 CFR 50, Appendix R) | 7 March 1984 | Lessons Learned from NRC Inspections of Fire Protection Safe Shutdown Systems (10 CFR 50, Appendix R) | Safe Shutdown Fire Barrier |
Information Notice 1984-16, Failure of Automatic Sprinkler System Valves to Operate | 2 March 1984 | Failure of Automatic Sprinkler System Valves to Operate | Safe Shutdown |
Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines | 17 December 1984 | Cracking of Flywheels on Cummins Fire Pump Diesel Engines | Liquid penetrant |
Information Notice 1985-01, Continuous Supervision of Irradiators | 10 January 1985 | Continuous Supervision of Irradiators | |
Information Notice 1985-02, Improper Installation and Testing of Differential Pressure Transmitters | 11 January 1985 | Improper Installation and Testing of Differential Pressure Transmitters | |
Information Notice 1985-03, Separation of Primary Reactor Coolant Pump Shaft and Impeller | 15 January 1985 | Separation of Primary Reactor Coolant Pump Shaft and Impeller | |
Information Notice 1985-04, Inadequate Management of Security Response Drills | 17 January 1985 | Inadequate Management of Security Response Drills | |
Information Notice 1985-05, Pipe Whip Restraints | 23 January 1985 | Pipe Whip Restraints | |
Information Notice 1985-06, Contamination of Breathing Air Systems | 23 January 1985 | Contamination of Breathing Air Systems | |
Information Notice 1985-07, Contaminated Radiography Source Shipments | 29 January 1985 | Contaminated Radiography Source Shipments | |
Information Notice 1985-08, Industry Experience on Certain Materials Used in Safety-Related Equipment | 30 January 1985 | Industry Experience on Certain Materials Used in Safety-Related Equipment | |
Information Notice 1985-09, Isolation Transfer Switches and Post-Fire Shutdown Capability | 31 January 1985 | Isolation Transfer Switches and Post-Fire Shutdown Capability | Safe Shutdown |
Information Notice 1985-10, Posttensioned Containment Tendon Anchor Head Failure | 6 February 1985 | Posttensioned Containment Tendon Anchor Head Failure | |
Information Notice 1985-11, Licensee Programs for Inspection of Electrical Raceway and Cable Installations | 11 February 1985 | Licensee Programs for Inspection of Electrical Raceway and Cable Installations | |
Information Notice 1985-13, Consequences of Using Soluble Dams | 21 February 1985 | Consequences of Using Soluble Dams | Hydrostatic |
Information Notice 1985-14, Failure of a Heavy Control Rod (B4C) Drive Assembly to Insert on a Trip Signal | 22 February 1985 | Failure of a Heavy Control Rod (B4C) Drive Assembly to Insert on a Trip Signal | |
Information Notice 1985-15, Nonconforming Structural Steel for Safety-Related Use | 22 February 1985 | Nonconforming Structural Steel for Safety-Related Use | |
Information Notice 1985-16, Time/Current Trip Curve Discrepancy of ITE/Siemens-Allis Molded Case Circuit Breaker | 27 February 1985 | Time/Current Trip Curve Discrepancy of ITE/Siemens-Allis Molded Case Circuit Breaker | |
Information Notice 1985-17, Possible Sticking of Asco Solenoid Valves | 1 March 1985 | Possible Sticking of Asco Solenoid Valves | |
Information Notice 1985-18, Failures of Undervoltage Output Circuit Boards in the Westinghouse-Designed Sold State Protection System | 7 March 1985 | Failures of Undervoltage Output Circuit Boards in the Westinghouse-Designed Sold State Protection System | |
Information Notice 1985-19, Alleged Falsification of Certifications and Alteration of Markings on Piping, Valves, and Fittings | 11 March 1985 | Alleged Falsification of Certifications and Alteration of Markings on Piping, Valves, and Fittings | |
Information Notice 1985-20, Motor-Operated Valve Failures Due to Hampering Effect | 12 March 1985 | Motor-Operated Valve Failures Due to Hampering Effect | |
Information Notice 1985-21, Main Steam Isolation Valve Closure Logic | 18 March 1985 | Main Steam Isolation Valve Closure Logic | |
Information Notice 1985-22, Failure of Limitorque Motor-Operated Valves Resulting from Incorrect Installation of Pinion Gear | 21 March 1985 | Failure of Limitorque Motor-Operated Valves Resulting from Incorrect Installation of Pinion Gear | |
Information Notice 1985-23, Inadequate Surveillance and Postmaintenance and Postmodification System Testing | 22 March 1985 | Inadequate Surveillance and Postmaintenance and Postmodification System Testing | |
Information Notice 1985-24, Failures of Protective Coatings in Pipes and Heat Exchangers | 26 March 1985 | Failures of Protective Coatings in Pipes and Heat Exchangers | Ultimate heat sink Coatings |
Information Notice 1985-25, Consideration of Thermal Conditions in the Design and Installation of Supports for Diesel Generator Exhaust Silencers | 2 April 1985 | Consideration of Thermal Conditions in the Design and Installation of Supports for Diesel Generator Exhaust Silencers | Coatings |
Information Notice 1985-26, Vacuum Relief System for Boiling Water Reactor Mark I and Mark II Containments | 2 April 1985 | Vacuum Relief System for Boiling Water Reactor Mark I and Mark II Containments | Coatings |
Information Notice 1985-27, Notifications to the NRC Operations Center and Reporting Events in Licensee Event Reports | 3 April 1985 | Notifications to the NRC Operations Center and Reporting Events in Licensee Event Reports | Coatings |
Information Notice 1985-28, Partial Loss of AC Power and Diesel Generator Degradation | 9 April 1985 | Partial Loss of AC Power and Diesel Generator Degradation | Coatings |
Information Notice 1985-30, Microbiologically Induced Corrosion of Containment Service Water System | 19 April 1985 | Microbiologically Induced Corrosion of Containment Service Water System | Hydrostatic Coatings Biofouling |
Information Notice 1985-32, Recent Engine Failures of Emergency Diesel Generators | 22 April 1985 | Recent Engine Failures of Emergency Diesel Generators | Coatings |
Information Notice 1985-33, Undersized Nozzle-To-Shell Welded Joints in Tanks and Heat Exchangers Constructed Under the Rules of the ASME Boiler and Pressure Vessel Code | 22 April 1985 | Undersized Nozzle-To-Shell Welded Joints in Tanks and Heat Exchangers Constructed Under the Rules of the ASME Boiler and Pressure Vessel Code | |
Information Notice 1985-34, Heat Tracing Contributes to Corrosion Failure of Stainless Steel Piping | 30 April 1985 | Heat Tracing Contributes to Corrosion Failure of Stainless Steel Piping | Hydrostatic |
Information Notice 1985-35, Failure of Air Check Valves To Seat | 30 April 1985 | Failure of Air Check Valves To Seat | |
Information Notice 1985-35, Failure of Air Check Valves to Seat | 30 April 1985 | Failure of Air Check Valves to Seat | |
Information Notice 1985-37, Chemical Cleaning of Steam Generators at Millstone 2 | 14 May 1985 | Chemical Cleaning of Steam Generators at Millstone 2 | |
Information Notice 1985-39, Auditability of Electrical Equipment Qualification Records at Licensees' Facilities | 22 May 1985 | Auditability of Electrical Equipment Qualification Records at Licensees' Facilities | |
Information Notice 1985-40, Deficiencies in Equipment Qualification Testing and Certification Process | 22 May 1985 | Deficiencies in Equipment Qualification Testing and Certification Process | |
Information Notice 1985-43, Radiography Events at Power Reactors | 30 May 1985 | Radiography Events at Power Reactors | High Radiation Area Scaffolding |
Information Notice 1985-46, Clarification of Several Aspects of Removable Radioactive Surface Contamination Limits for Transport Packages | 10 June 1985 | Clarification of Several Aspects of Removable Radioactive Surface Contamination Limits for Transport Packages | |
Information Notice 1985-47, Potential Effect of Line-Induced Vibration on Certain Target Rock Solenoid-Operated Valves | 18 June 1985 | Potential Effect of Line-Induced Vibration on Certain Target Rock Solenoid-Operated Valves | |
Information Notice 1985-48, Respirator Users Notice: Defective Self Contained Breathing Apparatus Air Cylinders | 19 June 1985 | Respirator Users Notice: Defective Self Contained Breathing Apparatus Air Cylinders | Hydrostatic |
Information Notice 1985-49, Relay Calibration Problem | 1 July 1985 | Relay Calibration Problem | |
Information Notice 1985-50, Complete Loss of Main and Auxiliary Feedwater at a PWR Designed by Babcock & Wilcox | 8 July 1985 | Complete Loss of Main and Auxiliary Feedwater at a PWR Designed by Babcock & Wilcox | |