Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CPSES-200001350, Comanche Peak,Submittal of Securities & Exchange Commission Annual Report Form 10K for Txu Electric2 June 2000Comanche Peak,Submittal of Securities & Exchange Commission Annual Report Form 10K for Txu ElectricIncorporated by reference
CPSES-200060390, Revision to Technical Specification 1.1, Definitions and 3.5.16, RCS Specific Activity.21 February 2006Revision to Technical Specification 1.1, Definitions and 3.5.16, RCS Specific Activity.Power change
CPSES-200101489, Submittal of Unit 1 Eighth Refueling Outage (1RF08) Inservice Inspection (ISI) Summary Report (Unit 1: 1986 Edition of ASME Code, Section XI, No. Addenda, Interval Start Date - August 13, 20006 July 2001Submittal of Unit 1 Eighth Refueling Outage (1RF08) Inservice Inspection (ISI) Summary Report (Unit 1: 1986 Edition of ASME Code, Section XI, No. Addenda, Interval Start Date - August 13, 2000Hydrostatic
Liquid penetrant
CPSES-200200010, Licensing Actions Transfer to Txu Generation Company LP2 January 2002Licensing Actions Transfer to Txu Generation Company LP
CPSES-200200020, Additional Information Concerning Application for Order and Conforming Administrative Amendments for Transfer of Licenses1 January 2002Additional Information Concerning Application for Order and Conforming Administrative Amendments for Transfer of Licenses
CPSES-200200025, Relief Requests from 1986 Edition of ASME Code, Section XI, No Addenda, Inservice Inspection (ISI) A-4 Through A-84 March 2002Relief Requests from 1986 Edition of ASME Code, Section XI, No Addenda, Inservice Inspection (ISI) A-4 Through A-8Nondestructive Examination
VT-2
Fire Watch
Scaffolding
CPSES-200200080, Annual Report of Changes in Peak Cladding Temperature8 January 2002Annual Report of Changes in Peak Cladding Temperature
CPSES-200200124, Comments on Safety Evaluation by Nuclear Reactor Regulation Re License Amendment No. 87 to Facility Operating License Nos. NPF-87 & NPF-8922 January 2002Comments on Safety Evaluation by Nuclear Reactor Regulation Re License Amendment No. 87 to Facility Operating License Nos. NPF-87 & NPF-89
CPSES-200200138, Additional Information Concerning Application for Order and Conforming Administrative Amendments for Transfer of Licenses11 January 2002Additional Information Concerning Application for Order and Conforming Administrative Amendments for Transfer of Licenses
CPSES-200200176, Response to NRC Regulatory Issue Summary 2001-2118 January 2002Response to NRC Regulatory Issue Summary 2001-21
CPSES-200200229, Supplement One to License Amendment Request (LAR) 01-14 Revision to Technical Specification (TS) 5.5.16 Containment Leakage Rate Testing Program4 February 2002Supplement One to License Amendment Request (LAR) 01-14 Revision to Technical Specification (TS) 5.5.16 Containment Leakage Rate Testing ProgramProbabilistic Risk Assessment
CPSES-200200251, Comanche Units 1 & 2, Additional Information Requested During Regulatory Conference of January 23, 200225 January 2002Comanche Units 1 & 2, Additional Information Requested During Regulatory Conference of January 23, 2002
CPSES-200200258, Transmittal of Second-Half 2001 Fitness-For-Duty Program Performance Data for Comanche Peak Steam Electric Station, Units 1 and 219 February 2002Transmittal of Second-Half 2001 Fitness-For-Duty Program Performance Data for Comanche Peak Steam Electric Station, Units 1 and 2Fitness for Duty
CPSES-200200334, (Cpses), Transmittal of Electronic Licensing Basis Documents4 February 2002(Cpses), Transmittal of Electronic Licensing Basis DocumentsOffsite Dose Calculation Manual
CPSES-200200363, Guarantees of Payment of Deferred Premiums5 February 2002Guarantees of Payment of Deferred Premiums
CPSES-200200376, Eighth Refueling Outage Steam Generator Twelve Month Special Report 1-SR-02-001-0011 February 2002Eighth Refueling Outage Steam Generator Twelve Month Special Report 1-SR-02-001-00
CPSES-200200415, License Amendment Request (LAR) 02-04 Revision to Technical Specification (TS) 5.3, Unit Staff Qualifications.27 March 2002License Amendment Request (LAR) 02-04 Revision to Technical Specification (TS) 5.3, Unit Staff Qualifications.
CPSES-200200458, Submittal of Amendment 12 to Indemnity Agreement B-9613 February 2002Submittal of Amendment 12 to Indemnity Agreement B-96
CPSES-200200481, Supplement 1 to License Amendment Request (LAR) 01-011, Revision to Technical Specification (Ts), TS 4.2.1, Fuel Assemblies.18 February 2002Supplement 1 to License Amendment Request (LAR) 01-011, Revision to Technical Specification (Ts), TS 4.2.1, Fuel Assemblies.Fuel cladding
CPSES-200200528, Annual Operating Report for 200128 February 2002Annual Operating Report for 2001Deep Dose Equivalent
Power change
CPSES-200200535, Transmittal of Unit 2 Pressure & Temperature Limits Report, Revision 327 February 2002Transmittal of Unit 2 Pressure & Temperature Limits Report, Revision 3Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
CPSES-200200598, Nuclear Liability Insurance28 February 2002Nuclear Liability Insurance
CPSES-200200599, Property Damage Insurance28 February 2002Property Damage Insurance
CPSES-200200611, Appeal of the Final Significance Determination for a White Finding and Reply to a Notice of Violation6 March 2002Appeal of the Final Significance Determination for a White Finding and Reply to a Notice of ViolationOffsite Dose Calculation Manual
Significance Determination Process
Preliminary White Finding
Substantial potential for overexposure
Substantial potential for an overexposure
Backfit
CPSES-200200643, Clarification to Annual Operating Report for 200115 March 2002Clarification to Annual Operating Report for 2001
CPSES-200200716, Day Answer to NRC Order for Interim Safeguards and Security Compensatory Measures18 March 2002Day Answer to NRC Order for Interim Safeguards and Security Compensatory Measures
CPSES-200200717, Request for Extension of Time to Submit an Answer and Request a Hearing for Interim Safeguards and Security Compensatory Measures18 March 2002Request for Extension of Time to Submit an Answer and Request a Hearing for Interim Safeguards and Security Compensatory Measures
CPSES-200200779, Inservice Inspection (ISI) Revision to Relief Request A-5 from 1986 Edition of ASME Code, Section XI, No Addenda20 March 2002Inservice Inspection (ISI) Revision to Relief Request A-5 from 1986 Edition of ASME Code, Section XI, No Addenda
CPSES-200200828, Transmittal of CPSES Physical Security Plan Revision 3418 April 2002Transmittal of CPSES Physical Security Plan Revision 34
CPSES-200200907, License Amendment Request, Revision to Technical Specifications (TS) TS 4.2 & 5.6.51 April 2002License Amendment Request, Revision to Technical Specifications (TS) TS 4.2 & 5.6.5Fuel cladding
CPSES-200200917, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.2 April 2002Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
Liquid penetrant
Pressure Boundary Leakage
Pressure boundary leak
CPSES-200200963, Transmittal of Revised Emergency Plan Procedures19 April 2002Transmittal of Revised Emergency Plan ProceduresEarthquake
Minimum staff
CPSES-200201029, Cycle 7 Core Operating Limits Report9 April 2002Cycle 7 Core Operating Limits ReportShutdown Margin
CPSES-200201031, Revision to Technical Specification 3.4.16 Reactor Coolant System Limit for Dose Equivalent I-1318 April 2002Revision to Technical Specification 3.4.16 Reactor Coolant System Limit for Dose Equivalent I-131Power change
CPSES-200201037, Augmented Inservice Inspection Program Plan, Revision 18 April 2002Augmented Inservice Inspection Program Plan, Revision 1
CPSES-200201164, Comanche Response to Request for Additional Information to License Amendment Request (LAR) 01-008: Revision to Technical Specification (TS) 3.3.2, ESFAS Instrumentation and 3.3.6, Containment Ventilation Isolation Instrumentation15 April 2002Comanche Response to Request for Additional Information to License Amendment Request (LAR) 01-008: Revision to Technical Specification (TS) 3.3.2, ESFAS Instrumentation and 3.3.6, Containment Ventilation Isolation Instrumentation
CPSES-200201225, Sixth Refueling Outage (2RF06) Steam Generator Inservice Inspection Tube Plugging Special Report No. 2-SR-02-001-0018 April 2002Sixth Refueling Outage (2RF06) Steam Generator Inservice Inspection Tube Plugging Special Report No. 2-SR-02-001-00
CPSES-200201244, (CPSES) Transmittal of the Annual Radiological Environmental Operating Report for 200118 April 2002(CPSES) Transmittal of the Annual Radiological Environmental Operating Report for 2001Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
CPSES-200201678, Supplement 1 to LAR 02-02 Provides Revised Section 5.1 Which Includes Administrative Change23 April 2002Supplement 1 to LAR 02-02 Provides Revised Section 5.1 Which Includes Administrative Change
CPSES-200201771, Environmental Protection Plan Annual Environmental Operating Report for 200129 April 2002Environmental Protection Plan Annual Environmental Operating Report for 2001High winds
CPSES-200201911, Letter from Roger D. Walker Re Comanche Peak Steam Electric Station Completion of Generic Letter 95-07 Activities for Unit 21 May 2002Letter from Roger D. Walker Re Comanche Peak Steam Electric Station Completion of Generic Letter 95-07 Activities for Unit 2
CPSES-200201936, Supplemental Response to NRC Order for Interim Safeguards & Security Compensatory Measures16 May 2002Supplemental Response to NRC Order for Interim Safeguards & Security Compensatory Measures
CPSES-200202095, 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.17 May 200260-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
Pressure Boundary Leakage
CPSES-200202257, Change of Address Notification15 May 2002Change of Address Notification
CPSES-200202258, Submittal of Securities & Exchange Commission Annual Report Form 10K for Txu Energy15 May 2002Submittal of Securities & Exchange Commission Annual Report Form 10K for Txu EnergyIncorporated by reference
CPSES-200202321, Comments Related to Draft Report on Potential Risk & Consequences of Heavy Load Drops in Nuclear Power Plants30 May 2002Comments Related to Draft Report on Potential Risk & Consequences of Heavy Load Drops in Nuclear Power Plants
CPSES-200202322, Comanche Peak'S 30 Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity3 June 2002Comanche Peak'S 30 Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary IntegrityBoric Acid
Pressure Boundary Leakage
CPSES-200202358, License Amendment Request 01-012 Re Steam Generator Tube Repair Using Leak Tight Sleeves for Comanche Peak Steam Electric Station23 July 2002License Amendment Request 01-012 Re Steam Generator Tube Repair Using Leak Tight Sleeves for Comanche Peak Steam Electric StationOperating Basis Earthquake
CPSES-200202360, Sixth Refueling Outage (2RF06) Steam Generator Twelve Month Report, Special Report No. 2-SR-02-002-005 June 2002Sixth Refueling Outage (2RF06) Steam Generator Twelve Month Report, Special Report No. 2-SR-02-002-00
CPSES-200202403, Supplemental Information to License Amendment Request (LAR) 02-03, Revision to Technical Specifications 4.2, Design Features & 5.6.5, Core Operating Limits Report Colr).6 June 2002Supplemental Information to License Amendment Request (LAR) 02-03, Revision to Technical Specifications 4.2, Design Features & 5.6.5, Core Operating Limits Report Colr).Fuel cladding