Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML02311010325 October 2002Comment from D. R. Woodlan on DG-1099, Anchoring Components and Structural Supports in Concrete.Backfit
ML03226052017 June 2003Comment (2) of Tom & Nancy Norwood Regarding the Scoping Process of an EIS on Extending the License for Diablo Canyon Nuclear Power Plant Beyond 2006
ML03269104312 September 2003Comment (25) of Sherri Gooding Opposing the Extension of Pg&E'S Operating Authority at Diablo Canyon
ML04125039916 April 2004Comment (17) of D. R. Woodlan Endorsing Comments Made by NEI on Draft NUREG-1778, Knowledge Base for Post-Fire Safe-Shutdown AnalysisFire Protection Program
ML0416903232 June 2004Comment (12) of D. R. Woodlan Supporting Comments on the Proposed Generic Communication: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors
ML05063038010 February 2005Comment (1) of Jill Zamek, Opposing Proposed Modification to Technical Specifications 3.7.17 and 4.3Earthquake
ML05174020613 June 2005Comment (10) of D. R. Woodlan on Behalf of Strategic Teaming and Resource Sharing on Draft GL-05-0XX; Grid Reliability and the Impact on Plant Risk and the Operability of Offsite PowerSafe Shutdown
Backfit
ML06136019712 May 2006Comment (1) of Robert C. Mcdiarmid on Behalf of the Northern California Power Agency on the Proposed Amendments to the Licenses Filed by Pacific Gas & Electric on January 19, 2006
ML06286057525 September 2006Comment (45) of D. R. Woodlan, Supporting Nrc'S Low Level Radioactive Waste Program
ML06356002412 December 2006Comment (16) of D. Hooper on Behalf of Strategic Teaming and Resource Sharing on Implementing of Reactor Oversight Process, Stars Have Been Working with NEI and RUG IV in Development of Industry CommentsSignificance Determination Process
ML07178004420 June 2007Comment (1) of Jill Zamek Criticizing the NRC Staff'S Supplement to the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Instal
ML07178004820 June 2007Comment (2) of Cheryl Vonderahe Opposing NRC Staff'S Supplement to the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of Diablo Canyon Independent Spent Fuel Storage Installatio
ML07178005120 June 2007Comment (4) of Lynne Harkins on NRC Staff'S Supplement to the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Installation
ML07178005320 June 2007Comment (5) of Russell Hodin Opposing the NRC Staff'S Supplement to the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Instal
ML07178005520 June 2007Comment (7) of Frances Scafidi on NRC Environmental Assessment of the Diablo Power Plant Against a Terrorist Attack
ML07178005620 June 2007Comment (8) of Mark Phillips on NRC Staff'S Supplement to the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Installation
ML07178005721 June 2007Comment (10) of Sherri Gooding, on Behalf of Avila Valley Advisory Council Mission Statement, Regarding NRC Hearing on Diablo Facility in San Luis Obispo, CA
ML07178006021 June 2007Comment (9) of Jordan Ek on NRC Staff'S Supplement to the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Installation
ML07178006122 June 2007Comment (11) of Henriette Groot on the Supplemental EA Regarding ISFSIs at Diablo Nuclear Power Plant
ML07178006524 June 2007Comment (12) of June Cochran Opposing the NRC Staff'S Supplement to the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Instal
ML07178006625 June 2007Comment (13) of Judy B. Evered on Eir for Waste Storage at Diablo Canyon
ML07183044525 June 2007Comment (14) of Barbara Scott Opposing NRC Staff'S Supplement to the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Installat
ML07183044727 June 2007Comment (15) of Susan Biesek Opposing the Results of the Environmental Assessment for Diablo Canyon ISFSI
ML07183044827 June 2007Comment (16) of Gene A. and Linda C. Nelson, in Support for a Finding of No Significant Impact for the Planned ISFSI on the Premises of the DCPP
ML07183045328 June 2007Comment (17) of Betty Mcelhill on the Safety/Environmental Evaluation of High-Level Nuclear Waste Storage at Diablo Canyon Plant in the Event of Terrorist Attack
ML07187003129 June 2007Comment (18) of Robert R. Loux State of Nevada Comments on Nrc'S Notice of Availability of Supplement to the Environmental Assessment (Sea) and Draft Finding of No Significant Impact for the Diablo Canyon Independent Spent Fuel Storage Inst
ML0718700322 July 2007Comment (19) of Michele Boyd Opposing Supplement to the Environmental Assessment for the Diablo Canyon Independent Spent Fuel Storage Installation
ML0718700332 July 2007Comment (20) of Elie Axelroth Opposing Nrc'S Environmental Assessment Re Diablo Canyon Independent Spent Fuel Storage Installation
ML0718700362 July 2007Comment (21) of Marina Bethlenfalvay, Re Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Installation
ML0718700382 July 2007Comment (24) from Lucy J. Swanson Opposing the Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Installation
ML0718700392 July 2007Comment (25) of Joseph Mangano Opposing NRC Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Installation
ML0718701352 July 2007Comment (26) of Phillip Musegaas Opposing NRC Supplement to the Environmental Assessment and Draft Finding of No Significant Impact for the Diablo Canyon Independent Spent Fuel Storage Installation
ML0718701372 July 2007Comment (27) from Loulena Miles on Environmental Assessment and Draft Finding of No Significant Impact Related to the Construction and Operation of the Diablo Canyon Independent Spent Fuel Storage Installation
ML0718701382 July 2007Comment (28) of Kevin Kamps on Supplement to the Environmental Assessment and Draft Finding of No Significant Impact for the Diablo Canyon Independent Spent Fuel Storage InstallationChernobyl
ML0718701402 July 2007Comment (29) of Linda Gunter on Supplement to the Environmental Assessment and Draft Finding of No Significant Impact for the Diablo Canyon Independent Spent Fuel Storage InstallationStolen
ML0718701432 July 2007Comment (22) of Diane Curran on Behalf of the San Luis Obispo Mothers for Peace Opposed to Supplement to Environmental Assessment for Diablo Canyon, ISFSIProbabilistic Risk Assessment
Cyber Security
Earthquake
Chernobyl
Fuel cladding
Stolen
ML0718701462 July 2007Comment (31) of Rochelle Becker on Supplement to the Environmental Assessment and Draft Finding of No Significant Impact for the Diablo Canyon Independent Spent Fuel Storage Installation
ML07187014925 June 2007Comment (32) of Andrew Christie on Supplement to the Environmental Assessment and Draft Finding of No Significant Impact for the Diablo Canyon Independent Spent Fuel Storage Installation
ML0811302959 April 2008Comment (5) of Tod Moser on Behalf of Strategic Teaming and Resource Sharing (Stars) Re NUREG-1855, Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decision Making, Draft Report for Comment
ML09170002612 June 2009Comment (1) of T. A. Moser, on Behalf of Strategic Teaming & Resource Sharing (Stars) Alliance, on Draft Regulatory Guide DG-1211, Materials and Inspections for Reactor Vessel Closure Studs.
ML0921901404 August 2009Comment (6) of Lee F. Goyette on Behalf of Diablo Canyon Opposing Draft Regulatory Guide DG-1192Through-Wall Leak
ML09293015215 October 2009Comment (1) of D. Hooper, on Behalf of Strategic Teaming and Resource Sharing, Relating to Draft Regulatory Guide DG-5029 Pressure-Sensitive and Tamper-Indicating Seals for Material Control and Accounting Use.
ML10015014512 January 2010Comment (13) of San Luis Obispo Mothers for Peace, J. Swanson, and J. Zamek, Opposing Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses, & Nrc'S Draft Generic Environmental Impact Statement (GEIS) for LInternal Flooding
Probabilistic Risk Assessment
Cyber Security
License Renewal
Earthquake
Chernobyl
Fuel cladding
Stolen
Uranium Hexafluoride
Affidavit
Depleted uranium
Cyber attack
ML10104067431 March 2010Comment (1) of Medody Demeritt on Behalf of Santa Lucia Chapter of the Sierra Club on Nrc'S Scoping of Environmental Impact Statement for Renewal of Diablo CanyonBiofouling
ML10127019310 February 2010Comment (1) E-mail Regarding Diablo Canyon Lr Env. Scoping
ML10127020225 February 2010Comment (2) E-mail Regarding Diablo Canyon Lr Env. ScopingEarthquake
Chernobyl
ML1012702053 March 2010Comment (3) E-mail Regarding Diablo Canyon Lr Env. ScopingEarthquake
ML1012702064 March 2010Comment (4) E-mail Regarding Diablo Canyon Lr Env. Scoping
ML1012702075 March 2010Comment (5) E-mail Regarding Diablo Canyon Lr Env. ScopingEarthquake
ML1012702089 March 2010Comment (6) E-mail Regarding Diablo Canyon Lr Env. Scoping