Issue date | Title | Topic | |
---|---|---|---|
ML031260524 | 29 April 2003 | Annual Environmental Operating Report | Zebra Mussel |
ML041120043 | 15 April 2004 | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML041120075 | 14 April 2004 | Annual Environmental Operating Report | Zebra Mussel |
ML051040428 | 8 April 2005 | 2004 Annual Environmental Operating Report | Zebra Mussel Veliger |
ML051120202 | 15 April 2005 | 2004 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML051240339 | 31 December 2004 | Annual Radioactive Effluent Release Report, Report 28, 01/01/2004 Through 12/31/2004 | Grab sample Offsite Dose Calculation Manual Met Tower Temporary Modification Missed surveillance Annual Radioactive Effluent Release Report Process Control Program Grace period |
ML051240348 | 29 September 2004 | Attachment I, Wolf Creek Generating Station, Administrative Procedure AP 07B-003, Revision 5, Offsite Dose Calculation Manual. | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Power change |
ML061230110 | 27 April 2006 | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML062770305 | 27 September 2006 | Applicant'S Environmental Report; Operating License Renewal Stage | Safe Shutdown High winds Ultimate heat sink Mission time Grab sample Fire Barrier Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Incorporated by reference Aging Management Large early release frequency License Renewal Earthquake Hardened vent Environmental Justice |
ML063380313 | 30 November 2006 | Transmission Lines Figure 3-2 | |
ML071150130 | 19 April 2007 | 2006 Annual Radiological Environmental Operating Report for the Period of January 1, 2006 Through December 31, 2006 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
ML071430363 | 9 May 2007 | Responses 2 - 10, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | High winds Ultimate heat sink Grab sample Zebra Mussel Veliger Biofouling |
ML071430367 | 9 May 2007 | Response 11, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | Time of Discovery Grab sample |
ML071430372 | 9 May 2007 | Responses 20 - 29, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | Ultimate heat sink Zebra Mussel Exemption Request Biofouling |
ML071430382 | 9 May 2007 | Responses 30 - 33, and 38, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | Boric Acid Ultimate heat sink Grab sample Offsite Dose Calculation Manual Met Tower Temporary Modification Missed surveillance Annual Radioactive Effluent Release Report Process Control Program License Renewal Grace period |
ML071430497 | 9 May 2007 | Responses 39, 41- 44, and 46 - 51, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | Safe Shutdown Ultimate heat sink Grab sample Offsite Dose Calculation Manual Hydrostatic Zebra Mussel Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Safeguards Contingency Plan License Renewal Exemption Request Biofouling Fire Protection Program Siren |
ML071430540 | 9 May 2007 | Responses 52 - 56, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | Ultimate heat sink Coatings Temporary Modification Zebra Mussel Veliger License Renewal Biofouling Siren Power Uprate |
ML071430547 | 9 May 2007 | Responses 58 - 62, 67, 69, and 70, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | Zebra Mussel License Renewal Biofouling |
ML071430588 | 9 May 2007 | Responses 12 - 15, 17, and 19, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | License Renewal |
ML071430593 | 9 May 2007 | Response 64, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application | |
ML071440374 | 9 May 2007 | Responses 1, 2, 3, 5, 8, 9 & 10 to Environmental Report - References of NRC Request for Additional Information Re License Renewal Application | |
ML071440377 | 9 May 2007 | Response 12 to Environmental Report - References of NRC Request for Additional Information Re License Renewal Application | |
ML071450148 | 9 May 2007 | Responses A1 - A10 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application | Annual Radiological Environmental Operating Report |
ML071450149 | 9 May 2007 | Responses A11 - A19 and A23 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application | Grab sample Offsite Dose Calculation Manual |
ML071450150 | 9 May 2007 | Responses A39 - A45 and A48 - A50 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML071450151 | 9 May 2007 | Responses A51 - A54 and A61 - A66 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application | License Renewal Biofouling |
ML071450173 | 9 May 2007 | Responses A24 - A30, A33 and A36 - A37 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application | Met Tower |
ML11109A066 | 11 April 2011 | 2010 Annual Environmental Operating Report | Zebra Mussel Veliger Power change |
ML11123A193 | 27 April 2011 | Submittal of 2010 Annual Radiological Environmental Operating Report | Ultimate heat sink Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML13127A084 | 29 April 2013 | 2012 Annual Radioactive Effluent Release Report - Report 36 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML13142A310 | 24 April 2013 | Operating Corp. - Annual Radiological Environmental Operating Report | Ultimate heat sink Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
RA-03-0059, Submittal of Wolf Creek Nuclear Operating Corporation Evaluation of Stress Corrosion Cracking for Component Cooling Water System Piping | 18 April 2003 | Submittal of Wolf Creek Nuclear Operating Corporation Evaluation of Stress Corrosion Cracking for Component Cooling Water System Piping | Boric Acid Biofouling Through Wall Leak |