Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-03-065, Revision 1 to Reply to Request for Additional Information Regarding Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations | 7 April 2003 | Revision 1 to Reply to Request for Additional Information Regarding Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations | Weld Overlay Nondestructive Examination Aging Management |
L-06-042, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Examination Requirements | 7 April 2006 | Proposed Alternative to American Society of Mechanical Engineers Code Section XI Examination Requirements | |
L-07-056, Requests Approval of Proposed Alternatives and Relief for Inservice Testing Program Ten-Year Update | 28 March 2007 | Requests Approval of Proposed Alternatives and Relief for Inservice Testing Program Ten-Year Update | Safe Shutdown Boric Acid Stroke time Temporary Modification Incorporated by reference Cold shutdown justification Power-Operated Valves Pressure Boundary Leakage Scaffolding |
L-08-069, Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements (Request Nos. 1-TYP-3-RA-1, 1-TYP-3-RA-2, 1-TYP-3-RA-3) | 9 April 2008 | Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements (Request Nos. 1-TYP-3-RA-1, 1-TYP-3-RA-2, 1-TYP-3-RA-3) | VT-2 Liquid penetrant Through-Wall Leak |
L-08-207, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inspection Period Extension Requirement | 24 September 2008 | Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inspection Period Extension Requirement | |
L-08-362, Beaver, Units 1 and 2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Paragraph IWA-5244 Examination Requirements | 2 December 2008 | Beaver, Units 1 and 2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Paragraph IWA-5244 Examination Requirements | |
L-17-308, 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) | 25 October 2017 | 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) | Dissimilar Metal Weld |
L-17-317, Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01) | 15 November 2017 | Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01) | |
L-19-107, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements | 27 August 2019 | Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements | VT-2 Through-Wall Leak Through Wall Leak Scaffolding |
L-20-060, CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency | 2 April 2020 | CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency | Pandemic COVID-19 |
L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency | 1 April 2020 | CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency | Probabilistic Risk Assessment Pandemic COVID-19 Grace period |
L-20-117, 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections | 3 April 2020 | 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections | Pandemic COVID-19 Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld |
L-20-118, CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing | 3 April 2020 | CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing | Pandemic COVID-19 |
L-20-256, Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 28 September 2020 | Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML023160394 | 12 November 2002 | Relief Request, Evaluation of Inservice Testing | Boric Acid Probabilistic Risk Assessment |
ML040270030 | 20 February 2004 | Relief, Alternative Inspection Method Utilizing the Dissimilar Metal Weld Criteria of the Electric Power Research Institutes Performance Demonstration Initiative Program, MC0602, MC0603 | Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML041660343 | 2 July 2004 | Evaluation of Inservice Testing (IST) Proposed Revisions 1J and 2H to Pump Relief Request No. 7 | Incorporated by reference |
ML050040389 | 5 January 2005 | Request for Additional Information - Extension of Emergency Diesel Generator Allowed Outage Time | Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
ML050950130 | 9 May 2005 | Relief, Evaluation of Inservice Testing, | |
ML053530192 | 5 January 2006 | (BVPS-1) - Evaluation of Service Inspection (ISI) Proposed Alternative Visual Examination Inspection (BV3-IWE1-4) | VT-2 |
ML062580120 | 2 October 2006 | (BVPS-1 and 2), Inservice Inspection (ISI) Program, Alternative Examination of Reactor Coolant Pipe Welds, Request for Relief No. BV3-RV-2 | Dissimilar Metal Weld |
ML070590555 | 30 April 2007 | Relief, Relief Request No. BV2-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle Welds | Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Liquid penetrant Dissimilar Metal Weld DM weld |
ML072050488 | 17 September 2007 | Relief Request No. BV1-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle Welds | Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML100680781 | 12 March 2010 | Third 10-Year ISI Interval Relief Request (ME2608) | Non-Destructive Examination Weld Overlay Incorporated by reference |
ML110470557 | 25 February 2011 | Relief Request Regarding an Alternative Weld Repair Method for Reactor Vessel Head Penetrations J-Groove Welds | Weld Overlay Nondestructive Examination Incorporated by reference |
ML110770551 | 26 April 2011 | Relief Request VRR2 Regarding the 10-Year Inservice Testing Program Interval | Boric Acid |
ML112640412 | 20 September 2011 | Acceptance Review Results for VC Summer Relief Request (ME6879) | |
ML113130428 | 22 November 2011 | Relief Request VRR5 Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency for the 10-Year Inservice Testing Program Interval | |
ML120270298 | 7 February 2012 | Relief Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency | Stroke time |
ML14363A409 | 28 January 2015 | Relief Request No. 1-TYP-4-RV-04 Regarding the Examination Requirements of Code Case N-729-1 | Boric Acid VT-2 |
ML16147A362 | 17 June 2016 | Relief Request No. 2-TYP-3-RV-04, Revision 0, Regarding Repair Activities for Reactor Vessel Head Penetration Nozzles and Associated J-Groove Welds | Incorporated by reference |
ML16190A133 | 27 December 2016 | Relief from the Requirements of the ASME Code | Probabilistic Risk Assessment Incorporated by reference |
ML16228A408 | 21 October 2016 | Correction to Relief Request 2-TYP-3-RV-04, Revision 0, Regarding Repair Activities for Reactor Vessel Head Penetration Nozzles and Associated J-Groove Welds | |
ML16257A621 | 21 November 2016 | Relief Request BV2-PZR-01, Regarding Alternative to Requirements for Components Connected to the Steam Side of the Pressurizer | Loop seal |
ML16319A057 | 1 December 2016 | Acceptance of Requested Licensing Action Relief Request for Proposed Alternative to Perform As-Found Set-Pressure Test | |
ML16328A125 | 23 January 2017 | Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783) | Grace period |
ML17041A185 | 2 March 2017 | Relief from the Requirements of the ASME Code | |
ML17047A610 | 2 March 2017 | Relief from the Requirements of the American Society of Mechanical Engineers Code | |
ML17048A004 | 2 March 2017 | Relief from the Requirements of the ASME Code | Power-Operated Valves Grace period |
ML17159A442 | 26 June 2017 | Requests for Alternatives and Requests for Relief Fifth 10-Year Inservice Testing Program Interval (CAC Nos. MF8332 Through MF8357). Note: Correction Safety Evaluation See ML17255A508 | Boric Acid Stroke time Probabilistic Risk Assessment Temporary Modification Incorporated by reference Scaffolding Grace period |
ML17167A067 | 26 June 2017 | Requests for Alternatives and Requests for Relief Fourth 10-Year Inservice Test Program Interval (CAC Nos. MF8333-MF8356). Note: Correction Safety Evaluation See ML17255A526 | Boric Acid Stroke time Incorporated by reference Surveillance Frequency Control Program Grace period |
ML18004A122 | 22 January 2018 | FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) | Through-Wall Leak |
ML18227A733 | 27 August 2018 | Request for Relief from the Requirements of the ASME Code | Hydrostatic Nondestructive Examination Incorporated by reference |
ML19051A108 | 20 February 2019 | Request Alternative Examination Frequency for Reactor Vessel Nozzle to Safe-End Welds (Request 2-TYP-4-RV-05, Revision 0) | |
ML19275E294 | 16 October 2019 | Issuance of Relief Request Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in Lieu of Specific ASME Code Requirements | High Radiation Area Incorporated by reference Earthquake Through-Wall Leak |
ML20079F816 | 26 March 2020 | Relief Requests 1-TYP-4-C2.21-1 and 1-TYP-4-RA-1 Regarding Weld Examination Coverage for the Fourth Inservice Inspection Interval | Boric Acid VT-2 Incorporated by reference Through-Wall Leak |
ML20095J099 | 4 April 2020 | Email Beaver Valley Power Station, Unit 2 - Verbal Relief for Snubbers - Delivered 4/4/2020 at 4:00 P.M | Incorporated by reference COVID-19 |
ML20095J219 | 4 April 2020 | Email Beaver Valley Power Station, Unit 2 - Verbal Relief for MOVs - Delivered 4/4/2020 at 4:00 Pm | Probabilistic Risk Assessment Incorporated by reference COVID-19 Grace period |
ML20098F301 | 7 April 2020 | Verbal Relief for Appendix I Safety Relief Valves | Incorporated by reference Coronavirus Grace period |
ML20099B257 | 8 April 2020 | Verbal Relief Unit 2 CIV | Incorporated by reference Coronavirus |