Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000000/LER-1975-004, Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept13 January 1975Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept
05000000/LER-1985-035, Forwards LER 85-035-00 Re Physical Security Event5 June 1985Forwards LER 85-035-00 Re Physical Security Event
05000000/LER-1985-078, Forwards Revised LER 85-078-01 Re Physical Security Event22 November 1985Forwards Revised LER 85-078-01 Re Physical Security Event
05000000/LER-1985-083, Forwards LER 85-083-01.Rept Contains Safeguards Info3 October 1986Forwards LER 85-083-01.Rept Contains Safeguards Info
05000000/LER-1986-008, Forwards LER 86-008-0016 October 1986Forwards LER 86-008-00
05000000/LER-1986-018, Forwards LER 86-018-0014 March 1986Forwards LER 86-018-00
05000000/LER-1986-031, Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)13 June 1986Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)
05000000/LER-1986-045, Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21)8 September 1986Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21)
05000000/LER-1986-049, Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21)29 September 1986Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21)
05000000/LER-1986-054, Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)7 October 1986Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)
05000000/LER-1986-055, Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21)10 October 1986Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21)
05000344/LER-1979-013, Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl18 January 1980Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl
05000344/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl22 June 1982Forwards LER 82-008/03L-0.Detailed Event Analysis Encl
05000344/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Encl28 June 1982Forwards LER 82-009/03L-0.Detailed Event Analysis Encl
05000344/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy8 July 1982Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy
05000344/LER-1982-011, Forwards LER 82-011/03T-0.Detailed Event Analysis Encl26 July 1982Forwards LER 82-011/03T-0.Detailed Event Analysis Encl
05000344/LER-1985-013, Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER24 July 1986Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER
05000344/LER-1986-003, Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-3211 September 1986Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-32Safe Shutdown
05000344/LER-1987-014, Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 87110128 August 1987Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 871101
05000344/LER-1988-019, Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement21 April 1989Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement
05000344/LER-1988-025, Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C0117 February 1989Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C01
05000344/LER-1988-046, Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 89031528 February 1989Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 890315
05000344/LER-1988-049, Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-04914 April 1989Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-049
05000344/LER-1989-007, Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties28 September 1989Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties
05000344/LER-1989-012, Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 8908098 September 1989Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 890809
05000344/LER-1990-015, Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations15 October 1990Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations
05000344/LER-1992-010, Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-1025 January 1993Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-10
05000344/LER-1992-026, Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration Surveillance28 December 1992Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration SurveillanceSafe Shutdown
Fire Barrier
Exemption Request
Continuous fire watch
0CAN108807, Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 Meeting17 October 1988Forwards Securities & Exchange Commission Application to Assume Responsibility for Licensed Operations at Plants,Per 880615 MeetingSafe Shutdown
Earthquake
2CAN038910, Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation Effort29 March 1989Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation EffortExemption Request
3F0789-05, Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala7 July 1989Forwards Financial Repts for Kissimmee Util Authority, Orlando Utils Commission & Cities of Bushnell & Ocala
3F1285-12, Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl20 December 1985Confirms 850125 Notification to Adopt Gpu Approach to Analyzing Natural Circulation Cooldown (Generic Ltr 81-21).TMI Topical Rept on Subj Encl
A01328, Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-0725 November 1987Forwards Response to SER Open Items Re NUREG-0737,Item II.B.1, Reactor Coolant Sys Vents & Insp Rept 50-336/84-07Hot Short
A02375, Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring10 June 1982Forwards Supplemental Info in Response to Generic Ltr 82-05 Re Status of NUREG-0737,Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling, II.F.1.1,II.F.1.2 & II.F.1.6, Effluent & Hydrogen Monitoring
A02468, Comments on Draft Branch Technical Position Re Radwaste Classification10 May 1982Comments on Draft Branch Technical Position Re Radwaste Classification
A02477, Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-07374 June 1982Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-0737
A02608, Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests30 July 1982Submits Addl Clarifications of 820301 App R Review for Facilities,In Response to NRC 820625 & 0707 Requests
A02611, Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 82091719 July 1982Informs That Documentation for Compliance w/NUREG-0737,Item II.B.3 Criterion Re post-accident Sampling Sys Will Be Provided by 820917
A02644, Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III30 July 1982Submits Comments on SEP Phase Ii,To Assist NRC in Development of Proposed Program for Phase III
A04790, Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee Paid30 September 1985Requests Extension to 860104 for Haddam Neck Re Environ Qualification of Electrical Equipment,Per Generic Ltr 85-15, 10CFR50.49(g) & Integrated Safety Assessment Program.Further Evaluation Proposed for Millstone.Fee PaidReactor Vessel Water Level
Anchor Darling
Exemption Request
Backfit
A04820, Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube Integrity25 June 1985Forwards Rev 0 to Nuclear Engineering & Operating Procedure Neo 2.17, Secondary Water Chemistry Program, Per Generic Ltr 85-02 Request for Description of Overall Program for Assuring Steam Generator Tube IntegrityForeign Material Exclusion
A04824, Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 Provided11 October 1985Submits ATWS Rule Schedule Required by 10CFR50.62(d),per Generic Ltr 85-06.Facilities Participating in NRC Integrated Safety Assessment Program.Justification for Absence of Schedules for Haddam Neck & Millstone Unit 1 ProvidedHydrostatic
Backfit
A04858, Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee Paid13 September 1985Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee PaidProbabilistic Risk Assessment
Exemption Request
A04880, Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 25 August 1985Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedule for Plant Mods.Integrated Schedules Endorsed.Integrated Safety Assessment Program Evaluation Process Will Also Be Applied to Millstone 2Backfit
A04906, Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities Listed5 July 1985Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities ListedFire Barrier
Systematic Assessment of Licensee Performance
A05276, Forwards Safety & Safeguards Insp Fees for 841223-85033023 October 1985Forwards Safety & Safeguards Insp Fees for 841223-850330
A05394, Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 127 June 1988Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 1Boric Acid
Stroke time
A05442, Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 86053018 February 1986Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530Exemption Request
A05610, Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl13 June 1986Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering EnclReactor Vessel Water Level
Ultimate heat sink
Fuel cladding
Power change
A05836, Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants3 July 1986Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants