Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08333010626 November 2008Acceptance Review Email, License Amendment Request to Revise TS 3.6(3), Containment Recirculating Air Cooling and Filtering System and License Conditions Replacement of Cacf System
ML09054079523 February 2009Acceptance Review Email, License Amendment Request, Modify Technical Specifications to Add Operability and Testing Requirements for Steam .Generator Blowdown Isolation on a Reactor Trip
ML09058022527 February 2009Acceptance Review Email, License Amendment Request to Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26
ML0918308972 July 2009Acceptance Review Email, License Amendment Request, Revise Technical Specification (TS) 2.0.1 and 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source, Deletion of Diesel Generator SR 3.7(1)e
ML09324024020 November 2009Acceptance Review Email, Request for Use of Alternate to Depth Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds
ML10047072516 February 2010Acceptance Review Email, Request for Exemption from 10 CFR Part 73 Physical Security RequirementsExemption Request
ML10224064812 August 2010Acceptance Review E-mail, LAR Regarding Revision to (1) TS LCO 2.15, Table 2-5, Item 1, (2) TS 3.1, Table 3-3, Items 1, 2, and 4 Control Element Assembly Position Indication and (3) TS LCO 2.10.2(7)c
ML10230067618 August 2010Acceptance Review Email, License Amendment Request to Revise License Condition and Approve Cyber Security PlanCyber Security
ML10265001321 September 2010Acceptance Review E-mail, Relief Request RR-12, from Requirements of ASME Code Case N-722 Visual Examination of Reactor Vessel Hot-Leg Nozzle to Safe End Dissimilar Metal Welds for 4th 10-Year Inservice Inspection Interval (ME4541)Dissimilar Metal Weld
ML10340018914 December 2010Acceptance Following Review of Supplemental Information, License Amendment Request to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications
ML1109605296 April 2011Acceptance Review Email, License Amendment Request, Establish Ultimate Heat Sink LCOs in Technical Specification (TS) 2.16, River Level, and Add Surveillance Requirements to TS 3.2, Equipment and Sampling Tests.Ultimate heat sink
ML1124501302 September 2011Unit No.1 - Acceptance Review Email, Exemption Request from the Requirements of Appendix E, Sections IV.F.2.b and C of Section 50, Title 10 of the Code of Federal RegulationsExemption Request
ML11363008329 December 2011Acceptance Review Email, License Amendment Request to Adopt National Fire Protection Standard NFPA -805 Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generation Plants,
ML1203802317 February 2012Acceptance Review Email, License Amendment Request to Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6)
ML12083032823 March 2012Email License Amendment Request to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits
ML12107065216 April 2012Acceptance Review Email, Relocate Technical Specification Limiting Condition for Operation 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report
ML1215800435 June 2012Acceptance Review Email, Amendment Request to Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan
ML12325A57819 November 2012Acceptance Review Email, Request for One-Time Exemption from Requirements of 10 CFR 26.205(d)(7) to Allow Less Restrictive Working Hour Limitations to Support Activities for Plant Startup from Current Extended OutageExemption Request
ML13249A3186 September 2013Acceptance Review Email, License Amendment Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis
ML13255A00711 September 2013Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7)Exemption Request
ML13267A17724 September 2013Acceptance Review Email, License Amendment Request to Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood
ML14178B39427 June 2014NRC Acceptance Review of Fort Calhoun License Amendment Request 14-03
ML15341A22415 December 2015Supplemental Information Needed for Acceptance of Requested Licensing Action Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength RequirementsOperating Basis Earthquake
Nondestructive Examination
ML16007A38515 January 2016Acceptance of Requested Licensing Action Following Supplement, Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements
ML17041A23815 February 2017Acceptance Review Letter, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E to Allow Plant to Reduce Emergency Planning Requirements Consistent with Permanently Defueled ConditionExemption Request
ML21350A02616 December 2021Acceptance Review of License Amend Req. to Add License Condition to Include License Termination Plan Requirements, Req. for Supplemental Info
ML22038A67510 February 2022Acceptance of Omaha Public Power District'S License Amendment Request to Add a License Condition to Include License Termination Plan Requirements