Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000254/FIN-2000008-01Corrective Action for Delinquent ASME Code Work Packages
05000254/FIN-2000008-02N/A
05000254/FIN-2000016-03Technical Errors in Appendix R Safe Shutdown ProceduresSafe Shutdown
05000254/FIN-2000016-04Associated Circuits Issue. Single spurious operation, including effect of automatic depressurization system failures on the time line.Safe Shutdown
05000254/FIN-2006014-01Failure to Establish Measures to Ensure That the Unit 1 ERV Actuators Remained Suitable for Operation While Operating at EPU Power Levels
05000254/FIN-2007003-01Aerosol Can Found in Cable Spreading Room
05000254/FIN-2007003-02Implementation of External Flooding Methodology
05000254/FIN-2007003-03Failure to Complete Qualified Reactor Vessel Shell Welds
05000254/FIN-2007003-06Review of Unit 1 4 kV Breaker Failures
05000254/FIN-2007003-09Licensee-Identified ViolationSubstantial potential for overexposure
05000254/FIN-2007004-02Review of Ultimate Heat Sink Surveillance Requirements and Emergency Action LevelsUltimate heat sink
05000254/FIN-2007008-01Inadequate 10 CFR 50.59 Evaluations for the Main Steam Line Tunnel High Temperature Instrumentation and the Electrohydraulic Control System Pressure Regulator
05000254/FIN-2008002-01Risk Assessment of Reactor Core Isolation Cooling Flow Controller Failure
05000254/FIN-2008002-02Safe Shutdown Makeup Pump Low Discharge PressureSafe Shutdown
05000254/FIN-2008002-03Unit 2 Isolation of Reactor Building Ventilation and Auto Start of Standby Gas Treatment
05000254/FIN-2008002-041/2 \"A\" Diesel Fire Pump Oil Leak and FireFire Protection Program
05000254/FIN-2008002-05Licensee-Identified Violation
05000254/FIN-2008002-06Licensee-Identified Violation
05000254/FIN-2008003-01Unit 2 Restart of 2A Recirculation Pump in Mode 1
05000254/FIN-2008003-02Units 1 and 2 Response to Earthquake on April 18, 2008Earthquake
05000254/FIN-2008003-03Licensee-Identified Violation
05000254/FIN-2008004-012D Vault Door Work Order Instructions Not FollowedSignificance Determination Process
05000254/FIN-2008004-02Inadvertent Initiation of the Unit 1 Feedwater Regulating Vavle Fire Protection Deluge
05000254/FIN-2008004-03Licensee Failure to Adequately Assess and Manage Risk Associated with work on U1 SBOSignificance Determination Process
Incremental Core Damage Probability Deficit
05000254/FIN-2008005-01Failure to Remove FME DeviceForeign Material Exclusion
05000254/FIN-2008005-02Explosion of the FDSgT Vestibule
05000254/FIN-2008005-03Licensee-Identified ViolationCommercial Grade Dedication
05000254/FIN-2008007-01Use of Non-Conservative Inputs and Methodologies in Calculating Terminal Voltages to Safety-Related MOV Motors During Design Basis Events.
05000254/FIN-2008007-02Inadeequate Calculations/Analyses and Testing for Thermal Overload Relays (TOLs) on Safety-Related MOVs.
05000254/FIN-2008007-03Seismic Qualification of 250 VDC Batteries
05000254/FIN-2008007-04Inaccurate RCIC Instrument Setpoints.
05000254/FIN-2009002-01Broken latch on Fire Door 145Fire Barrier
Fire impairment
Significance Determination Process
05000254/FIN-2009002-02Failure to Follow Work Instructions for 2A Core Spray Check Valve
05000254/FIN-2009002-03Unit 1F Drywell Cooler Improper Restoration From Maintenance
05000254/FIN-2009002-04Failure to Comply With Technical Specification And Radiation Work Permit Requirements During Work In A Locked High Radiation AreaHigh Radiation Area
Locked High Radiation Area
Substantial potential for overexposure
05000254/FIN-2009002-05Failure of the Unit 2 Emergency Diesel Generator Cooling Water Pump
05000254/FIN-2009002-06Licensee-Identified Violation
05000254/FIN-2009003-01Inadequate Procedural Adherence During Unit 1 TIP PM Testing
05000254/FIN-2009003-02Inadequate Procedural Guidance for Shutdown After Operating Basis EarthquakeOperating Basis Earthquake
Earthquake
05000254/FIN-2009003-031/2 EDGCWP Failed to Swap Feeds
05000254/FIN-2009003-04Trip of Unit 2 Fuel Pool Cooling Water Pumps During Scorpion Platform Removal
05000254/FIN-2009004-01Failure of Licensee to Properly Translate TS OPERABLE-OPERABILITYSafe Shutdown
Internal Flooding
05000254/FIN-2009004-02Adequacy of 10 CFR 50.59 Evaluation and Dose Consequence Assessment for Catastrophic Fire in the Interim Radwaste Storage Facility
05000254/FIN-2009004-03Inop RCIC Primary Containment Isolation ValvesNondestructive Examination
05000254/FIN-2009005-01Changes to EAL HU6 Potentially Decrease the Effectiveness of the Plans without Prior NRC Approval
05000254/FIN-2009005-02Darley Pump Leaking Gasoline from the Fuel PumpSignificance Determination Process
05000254/FIN-2009005-03Temperature Indicating Probe Found Broken in the Unit 2 Diesel Generator Coolant System
05000254/FIN-2009005-04Failure of RHR Torus Spray Isolation Valve to Open Due to Declutch Mechanism ProblemsSignificance Determination Process
05000254/FIN-2009005-05Licensee-Identified ViolationGrab sample
Offsite Dose Calculation Manual
05000254/FIN-2009006-01Failure to Evaluate Lack of Water Spray System Piping