IR 05000445/1997002 | 28 February 1997 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | Insp Repts 50-445/97-02 & 50-446/97-02 on 970210-14.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Radioactive Waste Effluent Mgt Program,Organization & Mgt Controls,Radioactive Effluent Monitoring for Plant Support | Request |
IR 05000445/1999006 | 30 April 1999 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities | Request |
ML20056G180 | 17 August 1993 | Office of Nuclear Reactor Regulation Black S | Documents 930722 Telcon W/Util Re Thermo-Lag Mfg Specs.Info Did Not Change NRC Previous Conclusions Re Thermo-Lag Fire Barriers or Affect NRC Ongoing Review Activities | Other |
ML20059C283 | 22 December 1993 | Callan L Office of Nuclear Reactor Regulation | Discusses RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Per 10CFR50.54(f) for Plant.Notifies That Requested Schedule Must Be Submitted within 45 Days from Receipt of Ltr | RAI |
ML20072A833 | 8 August 1994 | Luminant Walker R William Cahill | Submits Response to Request for Addl Info Re thermo-lag Cable Functionally Issues.Rev 2 to Calculation Change Notice 071 Encl | Request |
ML20077A725 | 18 November 1994 | Luminant Terry C | Forwards Response to Request for Addl Info Re Ampacity Tests | Request |
ML20086D988 | 7 July 1995 | Luminant Walker R Terry C | Informs That Request for Extension to Respond to NRC 950517 RAI on Util 950224 Response to GL 92-08 Re Thermo-Lag Fire Barrier Matl Received & Installed at Facility Discussed W/ Tj Polich & Granted on 950707 | Request |
ML20087E270 | 8 August 1995 | Luminant Terry C | Forwards Response to Request for Addl Info Re Followup to GL 92-08 for Thermo-Lag Fire Barrier Matl Received & Installed at Facility | Request |
ML20094P419 | 22 November 1995 | Luminant Terry C | Forwards Nucon 06TU935/01, Pyrolysis Gas Chromatography Analysis of 10 Thermo-Lag Fire Barrier Samples | Other |
ML20134G924 | 4 February 1997 | Luminant Terry C Woodlan D | Informs That Util Intends to Submit Addl Info to NRC on or About 970228 Re Response to SE Open Items on Unit 1 for Thermo-Lag Cable Functionality Issues | Other |
ML20134P866 | 22 November 1996 | Beckner W NRC (Affiliation Not Assigned) | Informs That 961024 Response to Open Items Re thermo-lag Cable Functionality Issues Does Not Address Staff Original Concerns.Advises of 961205 Meeting to Reach Final Technical Resolution on Cable Functionality Issues at Plant,Unit 1 | Meeting |
ML20135D395 | 28 February 1997 | Luminant Walker R Terry C | Provides Response to SE Open Items on CPSES Unit 1 Re Thermo-Lag Cable Functionality Issues | Other |
ML20151W366 | 8 September 1998 | Luminant Walker R Terry C | Informs That Addl Thermo-Lag Testing Currently Scheduled for Last Wk in Oct 1998 at Omega Point Labs,Inc.Detailed Description of Route to Lab Can Be Downloaded or Printed from Internet | Other |
ML20196B705 | 25 November 1998 | Luminant Walker R Terry C | Forwards Preliminary Fire Endurance Test Results,As Part of Action Plan for Closure of Remaining Open Items Associated with CPSES Unit 1 Thermo-Lag Fire Barriers & 980520 Confirmatory Order | Other |
ML20198Q703 | 6 November 1997 | Luminant Walker R Terry C | Submits Response to SE Open Items Re Thermo-Lag Cable Functionality Issue,Per 970916 Telcon W/Nrc & as Stated in Ref 1 of NRC .Rev 5 to ER-ME-067 & Bisco Test Rept 748-105 Encl.Bisco Test Rept Withheld | Other |
ML20202H368 | 13 February 1998 | Luminant Terry C | Provides follow-up to Licensee Re Thermo-Lag Raceway Testing.Util Has Concluded That It Is Important for Util Not Change Testing Criteria mid-stream. Commitment Made by Util,Listed | Other |
ML20205R563 | 15 April 1999 | Luminant Walker R Terry C | Forwards Rev 6 to CPSES Engineering Rept ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Sys. Rept Was Revised to Incorporate Technical Justification for Closure of Open Items 1 & 4 Described in NRC | Other |
ML20206F984 | 30 April 1999 | Luminant Walker R Terry C | Requests That NRC Return Bisco Tests & Remove Them from Docket Re Thermo-Lag Cable Functionality Issues for CPSES, Unit 1 | Other |
ML20206Q003 | 14 May 1999 | NRC (Affiliation Not Assigned) Jaffe D | Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 | Approval |
ML20211C466 | 18 August 1999 | NRC (Affiliation Not Assigned) Jaffe D | Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 | Other |
ML20217E441 | 1 October 1997 | Clifford J NRC (Affiliation Not Assigned) | Discusses Licensee 970228 Revised Response to SE Open Items on Plant,Unit 1 Re thermo-lag Cable Functionality Issues. Requests That Revs to CPSES Engineering Rept ER-ME-067 Be Provided within 30 Days of Receipt of Ltr | Other |
ML20217H367 | 1 April 1998 | NRC (Affiliation Not Assigned) Polich T | Requests That TU Electric Respond to Staff Comments Re Thermo-Lag Raceway Testing Proposal Concerning Thermo-Lag Fire Barriers at CP Steam Electric Station,Unit 1 to Resolve Issues Prior to Start of Any Fire Endurance Tests | Other |
TXX-9402, Responds to 931222 RAI by Informing NRC Last C/A Completing GL 92-08 Is Field Work Installing Thermo-Lag Upgrades | 28 January 1994 | Luminant William Cahill | Responds to 931222 RAI by Informing NRC Last C/A Completing GL 92-08 Is Field Work Installing Thermo-Lag Upgrades | Other |
TXX-9415, Forwards Response to Request for Addl Info Re Thermo-Lag Certification.Rev 2 to ER-ME-082, Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations | 16 June 1994 | Luminant William Cahill | Forwards Response to Request for Addl Info Re Thermo-Lag Certification.Rev 2 to ER-ME-082, Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations | Request |
TXX-9426, Forwards Response to Request for Addl Info Re Thermo-Lag Cable Functionality Issues | 9 November 1994 | Luminant Terry C | Forwards Response to Request for Addl Info Re Thermo-Lag Cable Functionality Issues | Request |
TXX-9500, Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified | 24 February 1995 | Luminant Terry C | Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified | Other |
TXX-9906, Forwards Final Fire Endurance Test Rept,Per Closure of Remaining Open Issues Re Thermo-Lag Fire Barriers as Described by Items 1 & 4 in NRC 960522 SER | 2 March 1999 | Luminant Terry C | Forwards Final Fire Endurance Test Rept,Per Closure of Remaining Open Issues Re Thermo-Lag Fire Barriers as Described by Items 1 & 4 in NRC 960522 SER | Other |