Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20080P12029 September 1983Duke Energy
Griffith S
Ack Receipt of Requesting Info on Util Spent Fuel Mgt Plans.Area Is Ever Changing So Precise Mix of Options Util Will Adopt Is Difficult to Predict.Flexibility Must Exist in Future.Related CorrespondenceOther
ML20080P84117 February 1984Duke Energy
Tucker H
Application for Amend to Licenses NPF-9 & NPF-17,allowing Spent Fuel Pool Storage Capacity Expansion from 500 to 1,463 Spaces for Each Spent Fuel Pool.Supporting Documentation EnclRequest
ML20080P84717 February 1984Duke EnergyProposed Tech Specs Allowing Spent Fuel Pool Storage Capacity Expansion from 500 to 1,463 Spaces for Each Spent Fuel PoolOther
ML20083C36919 December 1983Duke Energy
Tucker H
Advises of Intent to Rerack Spent Fuel Pools & to Assist NRC in Scheduling Licensing Activities.Meeting on 840131 W/Nrc & Westinghouse Tentatively Scheduled to Discuss Spent Fuel Pool Reracking.Proposed Agenda EnclMeeting
ML20090F28016 July 1984Duke Energy
Tucker H
Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods,In Response to 840712 TelconOther
ML20090F30716 July 1984Duke Energy
Tucker H
Discusses 840710 Telcon Between D Fieno & W Mcdowell Re Spent Fuel Pool Two Region Rerack Mods.Util Commits to Physical Blocks in Nonfuel Locations During Checkerboard StorageOther
ML20090H50420 July 1984Duke Energy
Tucker H
Discusses Re Proposed Amend to Licenses NPF-9 & NPF-17 to Allow Spent Fuel Pool Storage Capacity Expansion.Reemphasizes That Schedule Must Be Maintained to Complete All Rerack Work Prior to First RefuelingOther
ML20092A56311 June 1984Duke Energy
Tucker H
Forwards Addl Info Re Spent Fuel Pool Rerack Mods,In Response to 840530 Telcon RequestOther
ML20092J39719 June 1984Duke Energy
Tucker H
Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods in Response to 840611 Request from Franklin Research CtrOther
ML20092N91722 June 1984Duke Energy
Tucker H
Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods,Requested by 840607 Telecopy from Franklin Research CtrOther
ML20093A2482 July 1984Duke Energy
Tucker H
Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods Requested at 840626 Meeting.Seismic Analysis Performed Using Combination of 2-D non-linear & 3-D Linear ModelsMeeting
ML20094C3812 August 1984Duke Energy
Tucker H
Forwards Proprietary Addl Info Re Spent Fuel Pool Two Region Rerack Mods,Addressing Concerns Raised During 840731 Meeting.Affidavit Will Be Submitted by Westinghouse.Info Withheld (Ref 10CFR2.790)Meeting
ML20094N33413 August 1984Duke Energy
Tucker H
Forwards Corrected Page to 840802 Addl Info Attachment Re Spent Fuel Pool Two Region Rerack Mods.Only Page 1 of Attachment Considered Proprietary to WestinghouseOther
ML20140C2757 June 1984Duke Energy
Tucker H
Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods,Per 840514 Request.Health Physics & Emergency Training Administered,Per 10CFR19 & Reg Guide 8.27Other
ML20235J96912 August 1981James Anderson
BRAND INDUSTRIAL SERVICES
INC. (BISCO)
EECBISCO
Rev 1 to, Irradiation Study of Boraflex Neutron Shielding MatlsOther
ML20263N4434 November 1980Duke EnergyAuxiliary Building Fuel Building - Unit 1 Architectural Plan at El 778 + 10Other
ML20263N4468 May 1982Duke EnergyAuxiliary Building Fuel Building - Unit 1 Architectural Plan at El 760 + 6Other
ML20263N44911 February 1982Duke EnergyAuxiliary Building Fuel Building - Unit 2 Architectural Longitudinal Section Thru Fuel PoolOther
ML20263N45111 February 1982Duke EnergyAuxiliary Building Fuel Building - Unit 2 Architectural Plan at El 778 + 10Other
ML20263N45428 October 1983Duke EnergyAuxiliary Building Fuel Building - Unit 2 Architectural Plan at El 760 + 6Other
ML20263N45613 December 1974Duke EnergyAuxiliary Building Spent Fuel Pool - Unit 1 Plan and Sections Reinforcing. Sheet 4Other
ML20263N45914 January 1973Duke EnergyAuxiliary Building Unit 1 Spent Fuel Pool Sections Reinforcing. Sheet 4Other
ML20263N4625 November 1974Duke EnergyAuxiliary Building Unit 1 Spent Fuel Pool - Sections Reinforcing. Sheet 2Other
ML20263N46518 November 1975Duke EnergyAuxiliary Building Spent Fuel Pool - Unit 2 Plan and Sections Reinforcing. Sheet 5Other
ML20263N4675 November 1974Duke EnergyAuxiliary Building Unit 1 Spent Fuel Pool Plan and Sections Reinforcing. Sheet 1Other
ML20263N47113 December 1974Duke EnergyAuxiliary Building Spent Fuel Pool - Unit 2 Plan and Sections Reinforcing. Sheet 4Other
ML20263N4745 November 1974Duke EnergyAuxiliary Building Unit 2 Spent Fuel Pool Sections Reinforcing. Sheet 3Other
ML20263N47511 October 1974Duke EnergyAuxiliary Building Unit 2 Spent Fuel Pool Sections Reinforcing. Sheet 2Other
ML20263N47915 August 1975Duke EnergyAuxiliary Building Unit 2 Spent Fuel Pool Plans and Sections Reinforcing. Sheet 1Other
ML20263N48222 March 1983Duke EnergyAuxiliary Building Spent Fuel Pool - Unit 1 Plan and Sections Concrete. Sheet 4Other
ML20263N48421 November 1982Duke EnergyAuxiliary Building Spent Fuel Pool - Unit 1 Plan and Sections Concrete. Sheet 3Other
ML20263N48720 March 1984Duke EnergyAuxiliary Building Unit 1 Spent Fuel Pool Sections Concrete. Sheet 2.Rev Date IllegibleOther
ML20263N49015 July 1974Duke EnergyAuxiliary Building Unit 1 Spent Fuel Pool Plan and Sections Concrete. Sheet 1Other
ML20263N49325 March 1982Duke EnergyAuxiliary Building Spent Fuel Pool - Unit 2 Plan and Sections Concrete. Sheet 4Other
ML20263N49521 November 1982Duke EnergyAuxiliary Building Spent Fuel Pool - Unit 2 Plan and Sections Concrete. Sheet 3Other
ML20263N49810 October 1974Duke EnergyAuxiliary Building Unit 2 Spent Fuel Pool Sections Concrete. Sheet 2Other
ML20263N50012 January 1978Duke EnergyAuxiliary Building Unit 2 Spent Fuel Pool Plan and Sections Concrete. Sheet 1Other
ML20263N5035 January 1977Duke EnergyAuxiliary Building Units 1 & 2 Spent Fuel Pool Liner. Sheet 4Other
ML20263N50614 September 1981Duke EnergyAuxiliary Building Units 1 & 2 Spent Fuel Pool Liner. Sheet 3Other
ML20263N5097 August 1977Duke EnergyAuxiliary Building Units 1 & 2 Spent Fuel Pool Liner. Sheet 2Other
ML20263N51120 March 1984Duke EnergyAuxiliary Building Units 1 & 2 Spent Fuel Pool Liner. Rev Date IllegibleOther