ML13289A223

From kanterella
Revision as of 21:58, 3 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
6.a.ii.10 Sqn Hours of Operation Annual Air Report 2008
ML13289A223
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/07/2009
From: Cleary T P
Tennessee Valley Authority
To: Frazier J A
Chattanooga-Hamilton County, TN, Air Pollution Control Bureau, Office of Nuclear Reactor Regulation
Shared Package
ML13289A109 List: ... further results
References
Download: ML13289A223 (4)


Text

S58 090507 800 Air Correspondence May 7, 2009Mr. J. Alan FrazierChattanooga-Hamilton CountyAir Pollution Control Bureau6125 Preservation DriveChattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORTPlease find enclosed the annual report on the hours of operation fromApril 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report isrequired by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11 C.If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.Sincerely, Timothy P. ClearySite Vice President Sequoyah Nuclear PlantSAHEnclosure cc: D. J. Bodine, POB 2A-SQN A. A. Ray, WT 7C-KC. R. Church, POB 2B-SQN G. R. Signer, WT 6A-KT. P. Cleary, OPS 4A-SQN B. A. Wetzel, OPS 4A-SQND. E. Pittman, BR 4T-C EDMS, WT CA-K (Enclosure)

REVIEW/CONCURRENCE SHEETDOCUMENT NAME: SEQUOYAH NUCLEAR PLANT -AIR ANNUAL REPORTORGANIZATION:

Chemistry and Environmental DOCUMENT PREPARED BY: Stephanie A. HowardDATE: 04/24/2009 07 IEDMS TRACKING NO.: S58 0905?? 800 -Air Correspondence CONCURRENCES Name R C Signature

-Comment DateV NStephanie A Howard x I -b 4L;~atocAnn Hurt xAlan K Barringer xDebra J BodineBeth A. Wetzel x ) 6Chris R ChurchTimothy P Cleary x(for signature)

,iVINSTRUCTIONS:

Originator will determine the review/concurrence assignment.

REVIEW: Examine technical content and commitments made. Areview (RV) should confirm the truth and accuracy of factual statements andindicate agreement with commitments made which are applicable to thereviewer's organization.

CONCURRENCE:

Indication of agreement with the document as a whole.Concurrence (CN) signifies that the document is responsive to theintended

purpose, logical in construction, and clear in meaning in theeyes of the recipient.

A concurrence signature indicates that theindividual would be willing to sign the document for the agency.

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2 00May 7, 2009Mr. J. Alan FrazierChattanooga-Hamilton CountyAir Pollution Control Bureau6125 Preservation DriveChattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORTPlease find enclosed the annual report on the hours of operation fromApril 1, 2008 to March 31, 2009 for Auxiliary Boilers A and B, Diesel Generators 1-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report isrequired by Air Pollution Permits 4150-10200501-08C and 4150-20200102-11C.

If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Ann Hurt at (423)843-6714 of Sequoyah's Environmental staff.Sincerely, Timothy P. Clear~Site Vice President Sequoyah Nuclear PlantEnclosure Pr,,~ wla r-d~ epap.,

SEQUOYAH NUCLEAR PLANT -HOURS OF OPERATION ANNUAL REPORTAPRIL 1, 2008 to MARCH 31, 2009Equipment Name Maximum Permitted Actual HoursHours of Operation of Operation Auxiliary Boilers 2,000 (combined)

Boiler A 0 HoursBoiler B 0 HoursTotal 2,000 (combined) 0 HoursEmergency Diesel 204 Hours 64.5 HoursGenerator 1-AEmergency Diesel 204 Hours 42.1 HoursGenerator 2-AEmergency Diesel 204 Hours 59.8 HoursGenerator 1-BEmergency Diesel 204 Hours 36.5 HoursGenerator 2-BBlackout Diesel 204 Hours 7.7 HoursGenerator 1Blackout Diesel 204 Hours 7.1 HoursGenerator 2