Similar Documents at Cook |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] |
Text
CATEGORY1REGULAT(...
INFORMATION DISTRIBUTION ZSEM(RIDS)ACCESSION NBR:9P03010071 DOC.DATE:
96/02/26NOTARIZED:.
YESDOCKETFAC'L:50-3;5 DonaldC.X:ookNuclearPowerPlant,Unit1,1ndiana,M 050003'550-316DonaldC.CookNuclearPowerPlant,Unit2,Indi.a.a.M05000316ALTH.NAME AUTHORAFFILIATION FITZPATRICK,E.
IndianaMichiganPowerCo.(fa.merly.Indiana&MichiganEleRECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(document ControlDesk)R
SUBJECT:
Application foramendstoLicensesDPR-5S6DPR-74....od;"ifying7c
&~TS5.6.2toincreasecurrentlimit.onnor';na1fuelassemblyenrichment fornew,Westinghouse
-fabricated fuelstoredinAnewfuelstorageracks.TDISTRIBUTION CODE:A001DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:ORSubmittal:
GeneralDistribution ENOTES:REC.RIENTIDCVf>EyNAMEPD3-'ICKMAN,;
JINTERN.FILER~DRCHiHICB NRR/DSSA/SRXB OGC/HDS2""
EXTERNAL:
NOACCOPIESLTTRENCL11111111111011RECIPIENT IDCODE/NAME PD3-1PDNRR/DE/Fi41CB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRCPDRCOPIESLTTRENCL1111111111DNNOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE(CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFN5D-5(EXT.
415"2083)
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEEDtTOTALNUMBEROFCOPIESREQUIRED:
LTTR17ENCL.L'1 IndianaMichiganPowerCompanyPOBox16631Columbus, OH43216INOMNANlCHIGANPWMFebruary26,1996DocketNos.:50-31550-316AEP:NRC:1071U U.S.NuclearRegulatory Commission ATTN:'ocumentControlDeskWashington, D.C.20555Gentlemen:
DonaldC.CookNuclearPlantUnits1and2TECHNICAL SPECIFICATION 5.6.2INCREASEINMAXIMUMNOMINALFUELASSEMBLYENRICHMENT LIMIT,TAKINGCREDITFORUSEOFINTEGRALFUELBURNABLEABSORBERMATERIALIThisletteranditsattachments constitute anapplication foramendment ofthetechnical specifications (T/Ss)forDonaldC.CookNuclearPlantUnits1and2.Specifically, weproposetomodifyT/S5.6.2toincreasethecurrentlimitonnominalfuelassemblyenrichment fornew,Westinghouse
-fabricated fuelstoredinthenewfuelstorageracks.ThecurrentnominallimitforWestinghouse fuelis4.55weightpercent(w/o)uranium-235 isotope(U-235).Theproposednominallimitis4.95w/oU-235,providedthatthefuelassemblycontainssufficientzirconium diborideintegralfuelburnableabsorber(IFBA)materialtomaintainthemaximumreference fuelassemblyKlessthanorequalto1.4857at68F.Also,T/S5.6.2ismodifiedtopresentitinaformatsimilartothatusedintheStandardT/Ss(NUREG1431,Rev.1).Attachment 1providesadetaileddescription oftheproposedchanges,justification forthechanges,andourdetermination ofnosignificant hazardsconsideration performed pursuantto10CFR50.92.Attachment 2containstheexistingT/Spagesmarkedtoreflecttheproposedchanges.Attachment 3containstheproposedrevisedT/Spages.Attachment 4containsareportpreparedbyWestinghouse ElectricCorporation entitled"Criticality AnalysisoftheDonaldC.CookNuclearPlantNewFuelStorageVaultwithCreditforIntegralFuelBurnableAbsorbers,"
datedNovember1995.Thisreportassistsinthejustification forthechangeswhichisprovidedinAttachment 1.Thisreportisnotproprietary toWestinghouse.
Webelievethattheproposedchangeswillnotresultin(1)asignificant changeinthetypesofanyeffluentthatmaybereleasedoffsite,(2)asignificant increaseinindividual orcumulative occupational radiation
- exposure, or(3)asignificant reduction inamarginofsafety.96030l007l 960226PORADGCK050003i5jPPDROXOG35 U.S.NuclearRegulatory Commission Page2AEP:NRC:1071UTheproposedchangeshavebeenreviewedbythePlantNuclearSafetyReviewCommittee andtheNuclearSafetyandDesignReviewCommittee.
Incompliance withtherequirements of10CFR50.91(b)(1),copiesofthisletteranditsattachments havebeentransmitted totheMichiganPublicServiceCommission andtotheMichiganDepartment ofPublicHealth.Sincerely, E.E.Fitzpatrick VicePresident SP1ORNTOANDSUBSCRIBED BEFOREMETHISDAYOF1996NotaryPublicpitAttachments CC:A.A.BlindG.CharnoffH.Z.MillerNFEMSectionChiefNRCResidentInspector
-BridgmanJ.R.Padgett i~VFJIf~/
ATTACHMENT 1TOAEP:NRC:1071U JUSTIFICATION AND10CFR50.92ANALYSISFORCHANGESTOTHEDONALDC.COOKNUCLEARPLANTUNITS1AND2TECHNICAL SPECIFICATIONS
- .g603010071 Attachment 1toAEP:NRC:1071U Page1DESCRIPTION OFCHANGESUnits1and2,Technical Specification (T/S)5.6.2:Administrative changesareproposedtoincorporate.
theinformation presently foundinT/S5.6.2.1and5.6.2.2intoaformatsimilartotheformatusedintheNUREG1431,Rev.1T/Ss.Thisrevisedformatincludesreference toapplicable FSARsections.
AllcurrentT/Srequirements areretained, asfollows:newfuelstoragerackpitch21inchcenter-to-center distance(movedfromT/S5.6.2.1to5.6.2.d);
K,<<willnotexceed0.98whenfuelassemblies areplacedinthenewfuelstoragevaultandaqueousfoammoderation isassumed(movedfromT/S5.6.2.1to5.6.2.c);
themaximumnominalfuelassemblyenrichment limits(movedfromT/S5.6.2.2to5.6.2.aandTable5.6-1).2~Duetotheindividual enrichment limitsforthevariousfueltypes,Table5.6-1isaddedforclarification to5.6.2.a.ProposedT/S5.6.2.brequiresK,<<lessthanorequalto0.95withthenewfuelvaultfloodedwithunborated water.ThisisanewT/Srequirement.
Itisconsistent withtheanalysesprovidedinAttachment 4,andwithNUREG1431,Rev.1format.The.FSARanalysisreferenced byproposedT/S5.6.2.cisnotpresently inFSARSection9.7,butwillbeaddedduringthenextannualFSARupdate.Thiscondition isnotlimitingwithregardtoK,<<,.thecondition inproposedT/S5.6.2.bislimiting.
Anasterisked footnoteisaddedtotheenrichment limitsfortheWestinghouse fueltypesdescribed inItems1and3inTable5.6-1.Thefootnotecontainsthefollowing text:Amaximumnominalenrichment of4.95weightpercentU-235forWestinghouse fueltypesisacceptable providedthatsufficient integralfuelburnableabsorberispresentineachfuelassemblystoredinthenewfuelstoragerackssuchthatthemaximumreference fuelassemblyKislessthanorequalto1.4857at684F.3.AnumberofadministrativechangesaremadeforT/Sclarity,usability, andconsistency betweenunits,asfollows:a~b.cd.Unit1pages5-4and5-5:moveportionsofsection5.4onpage5-4topage5-5;Unit1pages5-5,5-6,5-8andUnit2page5-6:fontchange;Unit1page5-5:remove"1."from5.6.1.1.c, whichisnotrequired; Unit1pages5-6and5-8:movesection5.6.1.2frompage5-8topage5-6;e.ForbothunitsT/Ss,sections5.6.1.2and5.6.2:heading,change"Wt.0"'U"to<<Wt.0U-235<<.inthetable Attachment 1toAEP:NRC:1071U Page2REASONANDJUSTIFICATION FORCHANGESIngeneral,nuclearpowerplanteconomics dictatelongeroperating cycles.Withregardtonuclearfuel,thismeanseitherhigherfuelenrichments oralargernumberofnewfuelassemblies eachreload.Intoday'smarket,higherenrichment islessexpensive thanthepurchaseofadditional fuelassemblies, fromthevariousstandpoints ofcostperfuelassembly, efficient useofuranium,andlong-term spentfuelstoragecosts.Specifically withregardtoCookNuclearPlant,althoughthefacilityislicensedforfuelenrichments upto5.0weightpercent(w/o)uranium-235 isotope(U-235),theenrichment limitforthenewfuelstorageracksperT/S5.6.2.2is4.55w/oU-235forWestinghouse fueltypes.Thislimitisestablished duetothefactthat,fortheunborated waterdensityfloodingcondition, K,<<is0.9495at4.55w/oU-235,justbelowthe0.95limit.Fortheoptimummoderation (aqueousfoam)floodingcondition, K,<<is0.8974at4.55w/oU-235,wellbelowthe0.98limit.Usingamethodcalled"reactivity equivalencing,"
theincreaseinthemaximumnominalfuelassemblyenrichment limitto4.95w/oU-235isjustified, providedthatenoughintegralfuelburnableabsorber(IFBA)materialispresentineachfuelassemblytobestoredinthenewfuelstorageracks.Attachment 4containsareportbyWestinghouse ElectricCorporation entitled"Criticality AnalysisoftheDonaldC.CookNuclearPlantNewFuelStorageVaultwithCreditforIntegralFuelBurnableAbsorbers."
Inthisreport,Westinghouse analyzedthevariousWestinghouse fueltypesusedatCookNuclearPlanttodetermine whichtypewasbounding.
Then,theyanalyzedtheboundingfueltypeforvariousIFBAloadings, inmilligrams ofboron-10isotopeperinchoffuelrodlength.Westinghouse determined (seeTable4ofAttachment 4)thatforasmallnumberofIFBAcoatedrods,upto32,(thenumberisavariablecontrolled bythecoredesignerandcandifferforeachfuelassembly) fuelenrichedto5.0w/oU-235canbesafelystoredinthenewfuelstorageracksandcontinuetomeettheK,<<limits.Therefore, usingreactivity equivalencing, anyfuelassemblyplacedinthenewfuelstoragerackswillnothavegreaterreactivity thanafuelassemblyatthecurrentT/Slimit.Table4ofAttachment 4providesanadministrative guidetoensurethateachfuelassemblyintendedforstorageinthenewfuelstoragerackswillmeettheproposedT/Slimitpriortoplacement ofthefuelassemblyintheracks.Thewordingforthefootnotewaschosenbecauseitissimilartothewordinginpreviously approvedTechnical Specifications changesfortheFarley,V.C.Summer,andBraidwood nuclearpowerstations.
(Forthereviewer's reference:
FarleyUnit2T/SAmendment No.101,V.C.SummerUnit1T/SAmendment No.116,andBraidwood Units1&2Amendment No.58.)Thevalueforthemaximumreference fuelassemblyK(lessthanorequalto1.4857at684F)wascalculated inAttachment 4.AlthoughtheWestinghouse reportprovidesforanincreaseinthenewfuelstorageracklimitforWestinghouse fuelupto5.0w/oU-235,duetothenormalmanufacturing enrichment variability of+0.05w/oU-235,alimitofonly4.95w/oU-235isrequested.
AlsosincetheWestinghouse reportonlyanalyzedforWestinghouse fueltypes,nochangeisrequested forthenon-Westinghouse fueltypeslistedintheproposedTable5.6-1.
Attachment 1toAEP:NRC:1071U Page3NUREG1431,Rev.1formatisusedfortheseproposedchangestofacilitate useandapproval.
10CFR50.92EVALUATION Per10CFR50.92,aproposedamendment willnotinvolve.asignificant hazardsconsideration iftheproposedamendment doesnot:(1)involveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated, (2)createthepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated, or(3)involveasignificant reduction inamarginofsafety.Criterion 1Theproposedchangeswillnotinvolveasignificant increaseintheprobability ofanaccidentpreviously evaluated becausesimilaradministrative controlstothosepresently usedtoidentifynewfuelstoragerackinventory andcompliance withT/Slimitswillbeused.Therearenophysicalchangestotheplantassociated withthisT/Schange.Theconsequences ofanaccidentpreviously evaluated willnotbeincreased becausethereactivity ofthefuelstoredinthenewfuelstorageracksundertheproposedT/Slimitswillbenogreaterthanthereactivity offuelstoredinthenewfuelstoragerackspresently allowable underthecurrentT/Slimits.CRITERION 2Theproposedchangeswillnotcreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated becausethechangeswillinvolvenophysicalchangestotheplantnoranychangesinplantoperations.
Furthermore, thereactivity ofthefuelstoredinthenewfuelstorageracksundertheproposedT/Slimitswillbenogreaterthanthereactivity offuelstoredinthenewfuelstoragerackspresently allowable underthecurrentT/Slimits.CRITERION 3Theproposedamendment willnotinvolveasignificant reduction inamarginofsafetybecausethereactivity ofthefuelstoredinthenewfuelstorageracksundertheproposedT/Slimitswillbenogreaterthanthereactivity offuelstoredinthenewfuelstoragerackspresently allowable underthecurrentT/Slimits.
ATTACHMENT 2TOAEP:NRC:1071U EXISTINGTECHNICAL SPECIFICATION PAGESMARKEDTOREFLECTPROPOSEDCHANGES