ML20094D534
| ML20094D534 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/30/1995 |
| From: | NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | |
| Shared Package | |
| ML20094D532 | List: |
| References | |
| NUDOCS 9511060054 | |
| Download: ML20094D534 (1) | |
Text
- . -_ _. - . .
REACTOR'C00LANT SYSTEM REACTOR COOLANT SYSTEM LEAKAGI
~
' SURVEILLANCE REOUIREMENTS '
4.4.6.2.2 a Re or Coolant System Pressure Isolation Valve - w--* > ir.
T:5': ?.'
_ shall be demonstrated OPERABLE by verifying e wi age n ts limit:
- a. 'At least once per 18 months, b .' Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 7. days or more and if leakage testing has not been performed in the previous 9 months, l c.
Prior.to returning the valve to service following maintenance,
' repair, or replacement work on the valve, and !
- d. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or 1
manual action or flow through the valve.t l l
e.
As outlined in the ASME Code,Section XI, paragraph IW-3427_(b). , , , , ,
l The provisions of Specification 4.0.4 are not applicable for. entry inte MODE 3 or 4. '
l l
l l
& Not app /s'alle. +c BHM pumps gA sod te CucPion (So/afion yclV43 c h u A. valves. Gnd fbLlY bffGSS SEABROOK - UNIT 1 3/4 4-23 Amendment No. 9511060054 951030 PDR P
ADOCK 05000443 PDR