ENS 50015
ENS Event | |
---|---|
05:00 Apr 9, 2014 | |
Title | Part 21 - Potential Defect In General Electric Type Cr120Ad Control Relays |
Event Description | The following information was received via fax:
This letter is being issued by QualTech NP, Huntsville, AL, to provide an initial notification to the Nuclear Regulatory Commission and Nebraska Public Power District [NPPD] Cooper Nuclear Station concerning a potential defect in General Electric Type CR120AD control relays. A failure analysis revealed that the most likely initiator of the failure was a flaw or defect in the start wrap of the magnet wire. The flaw created an arc that involved windings directly beneath the start wrap which resulted in an open circuit on the coil windings. This failure is classified as infant mortality, which is similar to the failure mode identified in the 10 CFR part 21 30 day report (accession number 9706190261) dated June 12, 1997 submitted by GPU Nuclear. Investigation of documents dating back to 1997 revealed that the manufacturer issued an informal recommendation to detect infant mortality in these relays by performing burn-in testing and mechanical cycle aging of the relay. QualTech NP, in conjunction with NPPD, determined that the risk of infant mortality can be mitigated by subjecting these relays to a 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> burn-in and performance of 100 mechanical cycles prior to installation. It has been confirmed that only two orders, with two units each, for this particular relay are affected. Both orders have been shipped to Nebraska Public Power District as requested by purchase orders 4500149953 and 4500142705. All subject relays shall be subjected to a 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> bum-in and exposed to 100 mechanical cycles or returned to QualTech NP for replacement. Additional details will be provided in the formal written report. Please contact Matthew Thelen at 256-924-7441 (office) or mthelen@curtisswright.com for additional information. Matthew Thelen Project Manager QualTech NP Huntsville Operations a business unit of Curtiss-Wright Flow Control Company
(File No.: QTHuntsville 10CFR21-2014-01) To whom it may concern: This letter is being issued by QuaiTech NP, Huntsville Operations to provide a final notification to the Nuclear Regulatory Commission and Nebraska Public Power District (NPPD) Cooper Nuclear Station concerning a potential defect in General Electric Type CR120AD control relays. Replacement relays have been provided to NPPD. All required dedication procedures at QualTech NP have been revised to include a 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> burn-in and 100 mechanical cycles in an effort to detect infant mortality. No further actions are required at this time. This 10CFR part 21 file is closed. Notified R2DO (Bonser), R4DO (Whitten) and NRR Part 21 Group via email. |
Where | |
---|---|
Qualtech Np Huntsville, Alabama (NRC Region 1) | |
Organization: | Qualtech Np |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+10.35 h0.431 days <br />0.0616 weeks <br />0.0142 months <br />) | |
Opened: | Matthew Thelen 15:21 Apr 9, 2014 |
NRC Officer: | Steve Sandin |
Last Updated: | May 9, 2014 |
50015 - NRC Website | |
Qualtech Np with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 549982020-08-26T04:00:00026 August 2020 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failure of Air Conditioner Compressor Head Gasket ENS 516112015-10-06T05:00:0006 October 2015 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect En Revision Imported Date 2/11/2019 ENS 510532015-05-07T04:00:0007 May 2015 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Potential Part 21 Involving Struthers Dunn Relays with Contact Resistance Greater than One Ohm ENS 504802014-09-22T05:00:00022 September 2014 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Discrepancy Between Qualification Report and Installation Instructions ENS 500152014-04-09T05:00:0009 April 2014 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Potential Defect in General Electric Type Cr120Ad Control Relays ENS 499112014-03-12T21:00:00012 March 2014 21:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Allen Bradley Type 700Rtc Relay Spuriously De-Energizing 2020-08-26T04:00:00 | |