MONTHYEARU-602256, Annual Operating Rept for Period Jan- Dec 19931993-12-31031 December 1993 Annual Operating Rept for Period Jan- Dec 1993 U-602100, Annual Operating Rept for Jan-Dec 19921992-12-31031 December 1992 Annual Operating Rept for Jan-Dec 1992 ML20106D0661992-05-31031 May 1992 10CFR50.59 Rept for May 1991 Through May 1992 U-601937, Annual Operating Rept for 1991 for Clinton Power Station1991-12-31031 December 1991 Annual Operating Rept for 1991 for Clinton Power Station U-601801, Annual Operating Rept 19901990-12-31031 December 1990 Annual Operating Rept 1990 ML20059P0821990-03-31031 March 1990 10CFR50.59 Rept for Apr 1989 - Mar 1990 ML20006E5371989-12-31031 December 1989 Annual Operating Rept for Clinton Power Station for 1989. W/900212 Ltr ML19325D1001989-03-31031 March 1989 10CFR50.59 Rept for Mods,Temporary Mods & Procedures,Tests,Experiments & Other Documents from Jan-Mar 1989. U-601386, Annual Operating Rept,19881988-12-31031 December 1988 Annual Operating Rept,1988 U-601279, 10CFR50.59 Rept for Plant Mods,Temporary Mods,Procedures & Documents,Jan-Mar 19881988-03-31031 March 1988 10CFR50.59 Rept for Plant Mods,Temporary Mods,Procedures & Documents,Jan-Mar 1988 1993-12-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARU-603277, Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603267, Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With U-603245, Monthly Operating Rept for Jul 1999 for CPS Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for Jul 1999 for CPS Unit 1.With ML20211C9621999-07-26026 July 1999 ISI Summary Rept U-603232, Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted1999-07-0909 July 1999 Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted U-603233, Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With U-603222, Monthly Operating Rept for May 1999 for Clinton Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Clinton Power Station.With ML20210K8391999-05-11011 May 1999 British Energy Annual Rept & Accounts 1998-99 ML20206H1231999-05-0505 May 1999 Illinois Power Co CPS Main CR Simulator Certification Rept U-603210, Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603192, Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603176, Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With ML20207F2031999-02-10010 February 1999 Rev 1 to CPS COLR for Reload 6 Cycle 7 ML20202J0181999-02-0303 February 1999 SER Accepting Changes in Quality Assurance Program,Which Continues to Meet Requirements of App B to 10CFR50 U-603144, Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With U-603223, Illinova Corp 1998 Annual Rept. with1998-12-31031 December 1998 Illinova Corp 1998 Annual Rept. with U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603124, Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603103, Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With U-603101, Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site1998-10-28028 October 1998 Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves U-603091, Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With ML20153F9871998-09-17017 September 1998 Safety Evaluation Accepting 980225 Proposed Rev 26 to Illinois Power Nuclear Program Qam ML20151U1391998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Clinton Power Station,Unit 1 ML20237E3991998-08-27027 August 1998 SER Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode, for Clinton Power Station ML20237A1521998-08-0707 August 1998 SER Re Mgt Services Agreement at Clinton Power Station. Approval Under 10CFR50.80 Not Required ML20151Y6591998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Clinton Power Station,Unit 1 U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals U-603041, Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 ML20151U1501998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 U-603023, Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 1 U-603014, Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed1998-05-28028 May 1998 Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-603006, Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 1 U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable ML20216B1351998-04-21021 April 1998 Rev 0 to Illinois Power Co Clinton Power Station SVC Design Rept U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable1998-04-0707 April 1998 Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable U-602976, Monthly Operating Rept for Mar 1998 for Clinton Power Station1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Clinton Power Station ML20217H5771998-03-27027 March 1998 Safety Evaluation Concluding That No Significant Safety Hazards Introduced at CPS for Net 32% Ampacity Derating Factor for 1 H & 3 H Conduit Fire Barrier Sys & 1 H Cable Tray Fire Barrier Sys.Requests Response Addressing Issue U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue1998-03-24024 March 1998 Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 9804111998-03-12012 March 1998 Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 9805131998-03-0909 March 1998 Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 1999-09-30
[Table view] |
Text
-. _ _ -, . . . ._ . . . _ .
%' W liknots Power Company Clinton Power Stat.on P.O Box 678 Clinton, il 61727 Tel 217 935-8881 ILLINSIS .
P(wWER l U-602256 f L30-94(02 -25 )LP !
1A.120 February 25, 1994
+
Docket No. 50-461 10CFR50.36 Document Control Desk Nuclear Regulatory Commission l
Washington, D.C. 20555
Subject:
Annual Operating Repon r
i
Dear Sir:
In accordance with Section 6.9.1.4 of the Clinton Power Station Technical Specifications, Illinois Power is submitting the Annual Operating Report for the period of January 1,1993 through December 31,1993 for Clinton Power Station. Attachment 1 ,
provides the data associated with Personnel Man-Rem by Work and Job Function .'
Attachment 11 provides performance information penaining to Safety Valve and !
Safety / Relief Valve Challenges and Primary Coolant Specific Activity Analysis.
Sincerely yours, .
. J A
'} khhu ~d GiuD Richard F. Phares Director, Licensing -
SFB/csm Attachments cc: NRC Region 111, Regional Administrator NRC Clinton Licensing Project Manager NRC Resident Office, V-690 l Director, Office of Nuclear Regulatory Research Illinois Department of Nuclear Safety l l
c o n :, e m ,
., t '
9403040385 931231 ,
f'r'- i, PDR ADOCK 05000461 ,
p- PDR >
Attachment 1 ILLIN015 PDWER COMPANY to U-602256 <
CLINTON POWER STATION I P. O. Box 678 Page 1 of 2 1 Clinton, IL 61727 Reg. Guide 1.16 Report ReportingYear[93
- PERSONNEL (>100 MREM) TOTAL MAN-REM WORK 4 JOB FUNCilDN STATION UTILITY CONTRACT STATION UTILITY CONTRACT 4........ .. .......... ...........................................................................................................+.
Routine Operations and Surveillance Maintenance and Construction 131 1 259 3.819 0.022 4.843 Dperations 53 2 10 4.788 0.332 0.354 Health Physics and Lab 49 0 53 11.250 0.000 17.079 Supervisory and office Staff 29 1 9 2.842 0.005 0.301 Engineering Staff 25 0 19 0.698 0.000 0.255.
+............... ........ ... ..... . ... .........................................................................................
Routine Plant Maintenance Maintenance and Construction 93 1 53 2.402 0.013 1.086 Operations 30 1 1 0.988 0.020 0.006-Health Physics and Lab 26 0 8 0.994 0.000 0.201 Supervisory and Office Staff 5 0 2 0.074 0.000 0.093 Engineering Staf f 4 0 0 0.134 0.000 0.000
+................................................... .............. ....... .......................... .............................
Inservice inspection Maintenance and Construction 40 0 266 3.329 0.000 91.309 operations 5 0 2 0.139 0.000 2.399 Health Physics and Lab 14 0 23 0.853 0.000 1.291 ;
Supervisory and Office Staff 5 1 3 0.929 0.097 0.870 Engineering Staf f 16 0 35 2.801 0.000 31.791
.... .............................................. ................................................... ...........................+
Special Plant Maintenance Maintenance and Construction 151 3 451 40.559 0.4 73 116.649 Operations 53 2 7 13.8! 0.349 0.608 Health Physics and Lob 48 0 51 7.754 0.000 6.426 Supervisory and Office Staff 24 1 7 3.390 0.028 0.848' Engineering Staff 27 0 15 3.896 0.000 0. 752
............ ................. ............. ............. . ................................. .............................. .....+
Waste Processing Maintenance and Construction 10 0 7 0.204 0.000 0.495 ,
Operations 1 0 3 0.005 0.000 0.963' t Health Physics and Lab 22 0 5 0 806 0.000 0.106 Supervisory and Office staff 2 0 0 0.006 0.000 0.000
. Engineering Staff 0 0 0 0.000 0.000 0.000 '
+........... .......... ...,............... ........................... .... .....................................................+ '
Refueling Operations Maintenance and Construction 123 2 404 10.945 0.150 62.959 Operations 38 0 6 1.797 0.000 'O.965 Health Physics and Lab 24 0 44 2.407 0.000 '7.544 i Supervisory and Office Staff 24 0 11 2.470 0.000 3.929 Engineering Staf f 17 0 10 1.562 0 000 1.033 WORK & JOB FUNCTION TOTALS: 1089 15 1764 125.736 1.488 - 355.155.
....................................................................................................................................+-
- PERSONNEL (>100 MREM) TOTAL MAN REM .
WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT GRAND TOTALS: 312 6 606 125.736 1.488 355.155 I
t 1
w
. , ,.. , - . . _ . -_ - - __ ~ . __ _-
i . ' Attachment I to U-602256 Page 2 of 2 l
i I
Report of Personnel and Man-Rem by Work and Job Fungti_o n
)
This report is a tabulation on an annual basis of the number of station, utility and other personnel (including contractors) who received exposures greater than 100 mrem /hr and their associated man-rem exposure according to work and job function.
The work. and job function totals for personnel greater than 100 mrem /yr are different than grand totals because an individual may perform work under more than one work and job ,
function during the year, The total man-rem is based on a ratio of the official TLD results. ,
9 s
i
, , -..m,,,
y- . -
Attachment 2 '
to U-602;56 Page1of1 PERFORMANCE CIIARACTERISTLCS AND TESTS
]
)
l Safetylaive arid _ Safely!R_ cliff Valve Challsnges
Reference:
NUREG-0737, Action item II.K.3.3 CPS Technical Specification Section 6.9.1.5(b)
There were no unplanned or planned challenges to Safety Relief Valves during 1993.
-l Primar1CoJ21anLSpecific Activity Analyses Reference. CPS Technical Specifications, Section 6.9.1.5(c)
All analyses for specific activity of primary coolant were within the limits of Technical Specification 3 4.5 fbr 1993.