MONTHYEARML20206D6671998-12-31031 December 1998 1998 Annual Environ Operation Rept (Nonradiological), for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206D6541998-12-31031 December 1998 Annual Rept Annual Radiological Effluent Release Rept ML20206D6471998-12-31031 December 1998 Radiological Environ Operating Rept for 1998 ML20204G3501998-12-31031 December 1998 1998 Occupational Radiation Exposure Rept of Personnel Exposure Greater than 100 Mrem/Yr. with ML20217N1771997-12-31031 December 1997 1997 Annual Environ Operating Rept (Nonradiological) ML20216C8791997-12-31031 December 1997 1997 Annual Rept - Part 1, for Vogtle Electric Generating Plant ML20216B2471997-12-31031 December 1997 Radiological Environ Operating Rept for 1997 ML20216B2541997-12-31031 December 1997 Annual Radioactive Effluent Release Rept,1997, for Vogtle Electric Generating Plant A002678, Amend to NPDES Permit GA0026786,issued to Southern Nuclear Operating Co1997-04-15015 April 1997 Amend to NPDES Permit GA0026786,issued to Southern Nuclear Operating Co ML20138F0851996-12-31031 December 1996 Annual Radiological Environ Surveillance Rept,For 1996 ML20138F0931996-12-31031 December 1996 Annual Radioactive Effluent Release Rept for 1996, Part 2 ML20108C1141995-12-31031 December 1995 1995 Annual Rept - Part 2 ML20100N1671995-12-31031 December 1995 1995 Annual Rept - Part 1, for Vogtle Electric Generating Plant ML20082V2781994-12-31031 December 1994 1994 Annual Rept-Part 2 ML20080L7431994-12-31031 December 1994 1994 Annual Rept - Part 1 ML20083R5091994-12-31031 December 1994 Revised Pages for Part 2 of Vogtle 1994 Annual Rept ML20064H5521993-12-31031 December 1993 Annual Rept ML20029D2341993-12-31031 December 1993 Annual Environ Rept 1993, Part 2.W/940427 Ltr ELV-04037, NPDES Noncompliance Notification:On 920914,water Discharged from Cooling Tower Basin Via Storm Drain to Retention Pond 1 & Alarm Received in Control Room.Caused by out-of-calibr Level Transmitter.Level Transmitter Will Be Repaired1992-10-0101 October 1992 NPDES Noncompliance Notification:On 920914,water Discharged from Cooling Tower Basin Via Storm Drain to Retention Pond 1 & Alarm Received in Control Room.Caused by out-of-calibr Level Transmitter.Level Transmitter Will Be Repaired ELV-03924, NPDES Noncompliance Notification:On 920723,overflow of Oily Waste Separator at Waste Water Retention Basin to Savannah River Via Outfall OSN-12 Occurred.Caused by Valve Misalignment.Investigation Team Formed to Review Incident1992-07-31031 July 1992 NPDES Noncompliance Notification:On 920723,overflow of Oily Waste Separator at Waste Water Retention Basin to Savannah River Via Outfall OSN-12 Occurred.Caused by Valve Misalignment.Investigation Team Formed to Review Incident ELV-03979, Semiannual Radioactive Effluent Release Rept for Vogtle Electric Generating Plant,920131 Through 9206301992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept for Vogtle Electric Generating Plant,920131 Through 920630 ELV-03459, Semiannual Radioactive Effluent Release Rept,Jul-Dec 19911991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1991 ELV-03059, Semiannual Radioactive Effluent Release Rept,Jan-June 19911991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept,Jan-June 1991 ML20029A8311990-12-31031 December 1990 Radioactive Effluent Release Semiannual Rept for Jul-Dec 1990. W/910226 Ltr ML20086D6021990-12-31031 December 1990 1990 Savannah River Site Environ Rept - Summary Pamphlet ELV-02033, Semiannual Radioactive Effluent Release Rept for Jan-June 19901990-06-30030 June 1990 Semiannual Radioactive Effluent Release Rept for Jan-June 1990 ML20012B3831989-12-31031 December 1989 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989. W/900228 Ltr ML20042E9181989-12-31031 December 1989 Plant Vogtle Units 1 & 2 1989 Annual Rept Part 2. W/900501 Ltr ML20248B1001989-08-31031 August 1989 NPDES Permit Ga 0026786 Issued to Georgia Power Co ELV-00840, Semiannual Rept Plant Radioactive Effluent Releases Jan-June 19891989-06-30030 June 1989 Semiannual Rept Plant Radioactive Effluent Releases Jan-June 1989 ELV-00298, Semiannual Effluent Release Rept for Jul-Dec 1988. W/1988-12-31031 December 1988 Semiannual Effluent Release Rept for Jul-Dec 1988. W/ ML20196L5351988-06-30030 June 1988 Environ Assessment & Finding of No Significant Impact Supporting Rev to Tech Spec 3.6.2.2 Re Vol Limits of Sodium Hydroxide Solution in Containment Spray Additive Tank ML20153C3441988-06-30030 June 1988 Semiannual Rept,Plant Radioactive Effluent Releases,Jan- June 1988 ML20147E2801987-12-31031 December 1987 Semiannual Radioactive Effluent Release Rept for Jul-Dec 1987 ML20151M4411987-12-31031 December 1987 Annual Environ Operating Rept for 1987 ML20154C3371987-12-31031 December 1987 Vol II to Savannah River Plant Environ Annual Rept for 1987 ML20154C3301987-12-31031 December 1987 Vol I to Savannah River Plant Environ Annual Rept for 1987 ML20153C6261987-12-31031 December 1987 Annual Radiological Environ Surveillance Rept,CY87 ML20237H7591987-06-30030 June 1987 Semiannual Radioactive Effluent Release Rept for 870309-0630 ML20151B6151987-01-16016 January 1987 Environ Protection Plan (Nonradiological) ML20207R2821986-12-31031 December 1986 Annual Personnel Monitoring Rept for 1986 ML20212C4881986-12-23023 December 1986 Environ Protection Plan (Nonradiological) ML20210R1451986-06-30030 June 1986 Groundwater Monitoring,Jul 1985 - June 1986. W/One Oversize Figure ML20151Y8381986-02-28028 February 1986 Groundwater Monitoring Program,Jul-Dec 1985 ML20137X3161986-02-28028 February 1986 Environ Protection Plan (Nonradiological),App B to Ol.Draft Tech Specs Encl ML20154D5071986-02-28028 February 1986 Errata to Geotechnical Verification Work - Rept of Results, Revising Table 1 to Show Elevations Instead of Depth Below Ground Surface of Observation Wells ML20206S6711986-02-10010 February 1986 Radiochemistry Collection data,1985 - 1986 License Yr ML20155H1621985-10-31031 October 1985 Qualification Rept:Group VII Control Valves ML20134K4741985-08-31031 August 1985 Geotechnical Verification Work Rept of Results ML20137B6901985-06-0101 June 1985 Environ Assessment,Vogtle to Savannah River Plant 230kV Transmission Line, Prepared for Util.Application for State of Sc Public Svc Commission Environ Certificate Encl 1998-12-31
[Table view] |
Text
_
F r j'
r
'{'
v .
\
n
- c. m c , Georgia Power October 1, 1992 ELV-04037 Docket No. 50-424 U. S. Nuclear Regulatory Commission ATTN: Documettt Control Desk Washington, DC 20555 Gentlemen:
V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 NPDES PERMIT NO. GA 0Q26786 In accordance with the requirements of the Environmental Protection Plan, Appendix B of the Vogtle Electric Generating Plant facility Operating License Numbers NPF 68 and NPF-81, enclosed is a copy of correspondence submitted to the Georgia Department of Natural Resources - Environmental Protection Division transmitting a report required by our National Pollutant Discharge Elimination System (NPDES) Permit No. GA 0026786.
Should you have any questions, please advise.
Respectfully submitted,
/
, n f. $ 1 '
m .
l C. K. McCoy CKM/LPD: sis
- Enclosure l
0 9210060313 911001 PDR
[hy7 ADOCK 05000424 l /j '
S PDR
Ghorgia Power mka U. S. Nuclear Regulatory Commission ELV-04037 Pago Two cc: Georaia Pquer Company f1r W. B. Shipman, General Manager - Piant Vogtle Mr. M. Sheibani NORMS U. S. Nuclear Reaulatory Commission. Washi.naton. DC Hr. D. S. Hood, Licensing Project Manager - Vogtle U. S. Nuclear Reaulatory Commis11pn. Reaion 11 Mr. S. D. Ebneter, Regional Administrator Mr. B. R. Bonser, Senior Resident inspector - Vogtle l
l i
l l
. 700rrg
c.w; i pae co :.r,
- '; 1', F ( 3* t e : A gt -. A A' A4 692; 4 2Lrd h m . 4 o t:( u a
~
vi ;tren P;f-(t"tv b,,.didL At r '. G n ; 2 r..:2 Georgia Power s o noto.,
..~ _y ..
V r e ;e+
tw s r; r: co-: er.e - 4 September 18, 1993 PLANT V0GTLE
- NPDES Permit No. GA0026786 Five Day Report of NPDES Incident VIA 'fELECOPY .
Mr. Lawrence W. Hedges Program Manager, Industrial Wastewater Program 205 Butler Street, S.E. - Room 1070 Atlanta, Georgia 30334
Dear Mr. Hedges:
Attached ir a report submitted in compliance with Part II.A.
- 2. & 5. of the above referenced NPDES permit.
It details the overflow of the Unit 1 cooling tower basin to Retention Pond
- 1 and outfall OSN-014 that occurred on September 14, 1992.
Telephone"Inotification was made to Mr. Joseph R. Kane on September 15, 1992.
If you have questions or co:rments, please advise.
Yours very truly, V.
S. D. Holder GNG:gg Attachment
, i V0GTLE ELECTRIC GENERATING PLANT NPDES PERMIT NO. EA 0026786 Dissriotion of incident:
On Monday, September 14, 1932, an NPDES incident occurred at Vogtle Electric Generating Plant (VEGP) which resulted in discharge of water from the Unit I cooling tower basin via a storm drain to Retention Pond fl. Retention Pond
- 1 discharges to the Savannah River via NPDES Permit point OSN 014.
A cooling tower high level basin alarm was received in the control room at approximately 2211 EDT on September 14, 1992. In response to this alarm, centrol room personnel maximized Unit-I cooling tower blowdown capability and shut off all makeup to the cooling tower in accordance with plant procedures in order to reduce basin water level. At approximately 2358 EDT, a Chemistry foreman observed that the ground area around the Unit I cooling tower basin was wet and water was flowing in the storm drain indicat;ng the Unit I cooling tower basin had overflowed. The foreman notified the control f room and proceeded to sample the cooling tower ground area and storm drain.
The chemical parameters of the discharge samples and results (mg/1) were as follows:
" Chromium
- Samole No. pH Chlorine ling 8.24 Hon-Detectable 0.21 <0.10 1 (East of Unit 1 drain) 0.23 <0.10 2 (Basin ground area) 8.15 Non-Detectable 3 (Retention pond #1) 8.96 Hon-Detectable Non Detectable <0.10
- Results from the Georgia Power Company Environmental Laboratory Cause of the Incident:
The cause of this incident is attributed to an out-of-calibration level transmitter that provides control room indication and alarm upon occurrence of a high level condition in the cooling tower basin. The alarm was not received in time to take corrective e: tion to prevent overflow of the basin.
Period of the Incident:
The period of discharge from the cooling tower basin is estimated to be one hour and 58 minutes. The discharge began at.approximately 2200 EDT and ceased a short time before approximately 23EJ EDT.
1
i s' ,
V0GTLE ELECTRIC GENERATING PLANT HPDES PERMIT No. EA 0026786 Page Two Action _Taken to Prev _ent Recurrencet The overflow from the Unit I cooling tower basin dischayed via the storm drain to the Retention Pond #1, which dischages to the Savannah River via NPDES Permit point OSH 014. Analyses of samples taken at the basin
- discharge and the discharge from Retention Pond #1 indicate no adverse impact to the environment occurred as a result of the basin overflow.
A work request was initiated to repair the out-of-calibration level transmitter. In addition, plant management has appointed an event critique team to investigate the cooling tower overflow condition and to preside additir. al corrective action to the plant as appropriate.
Details of this incident were reported verbally to Mr. Geone Guill of Georgia Power Company - Environraental Affairs on September 15, 1992. Verbal notification to the Department of Natural Resources - Environmental Protection Division was provided by Mr. Guill on September 15, 1992, in accordance with the provisions of Part II A.2 of the VEGP NPDES Permit.
This report is submitted in accordance with the requirement for a 5 day written report documenting the above incident as referenced in Part II A.2 of the VEGP NPDES Permit.