05000282/LER-1998-005, Forwards LER 98-005-00 Re Inoperability of Actuation Logic for MSIVs in Certain Flooding Conditions from Feedwater Line Break
| ML20217E724 | |
| Person / Time | |
|---|---|
| Site: | |
| Issue date: | 04/22/1998 |
| From: | Sorensen J NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20217E728 | List: |
| References | |
| NUDOCS 9804270392 | |
| Download: ML20217E724 (2) | |
| Event date: | |
|---|---|
| Report date: | |
| 2822098005R00 - NRC Website | |
text
-
I.
I I
Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089 l
April 22,1998 10 CFR Part 50 Section 50.73 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 LER 1-98-05 Inoperability of Actuation Logic for Main Steam isolation Valves in Certain Flooding Conditions from a Feedwater Line Break The Licensee Event Report for this occurrence is attached. In the report, we made two new NRC commitments indicated as the Corrective Actions section statements in bold italics. A supplement to this report will be issued by May 22,1998.
The events described in the attached report were reported via the Emergency Notification System in accordance with 10 CFR 50.72, on March 23,1998 and March 24, 1998. Please contact us if you require additional information related to these events.
O'G Joel P Sorensen t
Plant Manager Prairie Island Nuclear Generating Plant
.- \
.: s a l c: Regional Administrator - Region 111, NRC NRR Project Manager, NRC /-
t 9804270392 980422 PDR ADOCK 05000282 S PDR
- USNRC NORTHERN STATES POWER COMPANY
. April 22,1998 Page 2 Senior Resident inspector, NRC Kris Sanda, State of Minnesota Attachment 1