Forwards LER 97-003-00 IAW Requirements of 10CFR50.73(a)(2)(ii)(B),w/listed Commitments
ML20140C980
Person / Time
Site:  Constellation icon.png
Issue date: 04/15/1997
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20140C985 List:
References
LWP-97-037, LWP-97-37, NUDOCS 9704220032
Download: ML20140C980 (2)


LER-2097-003, Forwards LER 97-003-00 IAW Requirements of 10CFR50.73(a)(2)(ii)(B),w/listed Commitments
Event date:
Report date:
2652097003R00 - NRC Website

text

8

(:ommonwcahh lihmn Compan> q7 Quad (.itics Generating Station 22~10 2(mth Asentic North

  • ( . ordos a. 11. 612 4 W 10

)

Tel ,409M i 22 4 I l

LWP-97-037 l

April 15, 1997 United States Nuclear Regulatory Commission Washington, DC 20555 Attention': Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-265, DPR-30, Unit Two Enclosed is Licensee Event Report (LER)97-003, Revision 00, for Quad Cities Nuclear Power Station. j This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(ii)(B). The licensee shall report any event or condition that resulted in the condition of the nuclear power plant, including its principal . safety )

barriers, being seriously degraded, or that resulted in the nuclear '

plant being in a condition that was outside the design basis of the plant.

The following commitments are being made by this letter:

1. A predefine (electronic reminder) is being set up in Electronic Work Control System (EWCS) to track completion of QCTP 1110-12.
2. Modification Design Change Package (DCP) #9500060 is being  !

installed during Q2R14 to add flow indicators to the RHR and i C"RCs. These flow indicators will assist engineering to ensure tr. t these coolers are able to perform their design function.

3. Modification DCP 9500060 is also planned to be installed on Unit I during QlR15.

)

f0 II 9704220032 970415 PDR ADOCK 05000265 6_,,, PDR llIll[IlI!lI,llI),EIll A linicom C.ompJn)

14P-97-037 2 April 15, 1997 If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager at

'309-654-2241, ext. 3609.

Respectfully, COMMONWEALTH EDISON

-QUAD C1 IES N EAR POWER STATION

/

}/ -

tN'tlDC, s

L/ W. Pearce Station Manager LWP/CP/plm Enclosure cc: A. B. Beach, Regional Administrator, Region III R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company j P. L. Piet, Licensing, Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden INP0 Records Center I

STMORW3797.LWP