MONTHYEARNL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-21-0905, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R292022-01-26026 January 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R29 NL-19-1491, Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2019-12-0909 December 2019 Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-19-0726, Inservice Inspection Program Owner'S Activity Report for Outage 2R252019-06-17017 June 2019 Inservice Inspection Program Owner'S Activity Report for Outage 2R25 NL-19-0317, Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update2019-04-0202 April 2019 Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update NL-17-1194, Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-242017-07-10010 July 2017 Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-24 NL-17-0951, Inservice Inspection Program, Owner'S Activity Report for Outage 2R242017-05-30030 May 2017 Inservice Inspection Program, Owner'S Activity Report for Outage 2R24 NL-16-2707, Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707)2016-12-27027 December 2016 Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707) ND-16-1437, Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2016-08-24024 August 2016 Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-16-0795, Inservice Inspection Program - Owner'S Activity Report for Outage IR272016-06-0101 June 2016 Inservice Inspection Program - Owner'S Activity Report for Outage IR27 NL-16-0421, Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27)2016-03-17017 March 2016 Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27) NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-06-18018 June 2015 Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-15-1032, E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R232015-06-12012 June 2015 E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R23 NL-15-0784, Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-05-0404 May 2015 Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-14-1821, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information2014-11-13013 November 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code2014-10-31031 October 2014 Snubber Inspection Plan Submittal in Accordance with ASME OM Code NL-14-1250, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.02014-09-19019 September 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 NL-14-0840, Lnservice Inspection Program Owner'S Activity Report for Outage 1R262014-06-0303 June 2014 Lnservice Inspection Program Owner'S Activity Report for Outage 1R26 NL-14-0231, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.02014-03-0606 March 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.0 NL-12-1266, Inservice Inspection Program, Owner'S Activity Report for Outage 1R252012-06-14014 June 2012 Inservice Inspection Program, Owner'S Activity Report for Outage 1R25 NL-10-0989, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests2010-07-0808 July 2010 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests NL-10-1023, Inservice Inspection Program, Owner'S Activity Report for Outage 1R242010-06-11011 June 2010 Inservice Inspection Program, Owner'S Activity Report for Outage 1R24 NL-08-1798, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-012008-12-19019 December 2008 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-01 NL-08-0901, Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay2008-06-13013 June 2008 Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay NL-07-0987, Fourth Interval Inspection (ISI) Plan Correction2007-05-0909 May 2007 Fourth Interval Inspection (ISI) Plan Correction NL-07-0802, Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests2007-04-13013 April 2007 Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests ML0704300922006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 1, Revision 2, Introduction Fourth Ten-Year Examination Plan. ML0704301002006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 3, Revision 1.0, Class 1, 2 and 3 Figures Fourth Ten-Year Inservice Inspection Plan. ML0704300942006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Examination Plan. ML0704301012006-08-10010 August 2006 E. I. Hatch, Unit 2, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-06-1358, Inservice Inspection Program, Owner'S Activity Report for Outage 1R222006-06-29029 June 2006 Inservice Inspection Program, Owner'S Activity Report for Outage 1R22 ML0704300812006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 1, Revision 1, Introduction Fourth Ten-Year Inservice Inspection Plan. ML0704300832006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Inservice Inspection Plan. ML0704300872006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 3, Revision 1, Class 1, 2 and 3 Figures, Fourth Ten-Year Inservice Inspection Plan. ML0704300962005-08-31031 August 2005 E. I. Hatch, Unit 1, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-05-1190, Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant2005-07-11011 July 2005 Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant ML0516403852005-06-0707 June 2005 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0813, Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report2004-06-0707 June 2004 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0478, Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-402004-03-29029 March 2004 Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-40 NL-03-1380, Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-182003-07-11011 July 2003 Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-18 ML0230903562002-11-0101 November 2002 Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-11 ML0228200262002-10-0404 October 2002 Third 10-Year Interval Inservice Inspection Program, Response to Request for Additional Information (RAI) ML0226604362002-09-17017 September 2002 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report 2024-07-09
[Table view] |
Text
SOUTHERN NUCLEAR OPERATING COMPANY MATERIALS AND INSPECTION SERVICES VOLUME 3 CLASS 1,2, AND 3 FIGURES FOURTH TEN-YEAR INSERVICE INSPECTION PLAN E. I. HATCH NUCLEAR PLANT UNIT 1 REVISION 1 APPR.
( REV DATE DESCRIPTlON F /\
216106 INITIAL ISSUE Site Site Stam Stam
SOUTHERN NUCLEAR OPERATING COMPANY MATERIALS AND INSPECTION SERVICES VOLUME 3 CLASS 1,2, AND 3 FIGURES FOURTH TEN-YEAR INSERVICE INSPECTION PLAN E. I. HATCH NUCLEAR PLANT UNIT 1 REVISION 1 Q A Review: //5#
AN11 Review: NA PRB Review: NA AGM-PS Appv:
AGM-PO APPV:
Hatch Unit 1 Fourth Ten-Year Examination Plan List of Effective Pages Volume 3 This document consists of four sections of IS1 Figures. These are:
Equipment Support Figures Class 1 Figures Class 2 Figures Class 3 Figures Each figure consists of only one page. Each section has a drawing list with the current revision listed, except for the Equipment Support Figures which do not have a revision number. As drawings are revised the appropriate drawing list will be revised to reflect the new revision.
HI VOL3 EFFECTVE PAGES.DOC Rev. 1
HATCH 1 FOURTH TEN YEAR INSPECTION PLAN EQUIPMENT FIGURES Figure No. Description 1B11-SKI Reactor Vessel 1B 11-A00 1 1C4 1-SK2 Standby Liquid Control Storage Tank 1C4 1-A00 1 1C4 1-SK3 Standby Liquid Control Pump 1C4 1-COO 1A/B 1El1-SK4 RHR Heat Exchanger 1E 1 1-BOO 1AIB 1El1-SK5 RHR Pump 1El 1-C002A/B/C/D 1E2 1-SK6 Core Spray Pump 1E2 1-COO 1AIB 1E4 1-SK7 HPCI Pump 1E41-COO1 1E5 1-SK8 RCIC Pump 1E5 1-COO 1 1T47-SK9 Drywell Air Cooler 1T47-B007AIB 1T47-SKI 0 Drywell Air Cooler 1T47-B008A/B IT47-SKll Drywell Air Cooler 1T47-B009AlB 1E11-SKI2 RHR Service Water Pump 1E11-COO 1A/B/C/D 1E11-SKI3 RHR Service Water Strainer 1E 11-D002, 1E 11-DO03A/B 1P41-SKI4 Plant Service Water Pump 1P4 1-COO 1A/B/C/D 1P41-SKI5 Plant Service Water Strainer 1P4 1-D 103AlB 1T41-SKI6 RHR & Core Spray Pump Room Cooler lT4.1-B002A/B, IT4 1-B003A/B 1T41-SK17 HPCI Pump Room Cooler 1E41-BOO5A/B H I EQUIP FIGUKES.DOC Page 1 of 1
REACTOR VESSEL 1bIf-ADO\.
,I+iGl HEAT lM5TRclCTld 5-\ 8840 R H k HEAT E X C U A U G E R I E ! ~ - & P D I A / ~
CORE SPRAY PUMP lE21- ~ 0 0 .~1 / b
1-1 /
- .. .- -- - -- -- - - - -
--. . , .-
,- - ,, I i
.I' Y-Ur*.
m.r*cM-r I---- ----
,--,--
---,---- REFaDwL1.: DRYWELL L'PLIU~ ud~-p,
\,- ,,- - - - - - - - ,,,,,J:
I I'
M A I U T E E A A L E M A U U A L LjX- /r54/1 "1 I
REF. DWG. :PLANT SERVICE WATER PUMP DWG. S51356 P,S,W PUMP OPERATING &
MAINTENANCE MANUAL SX-11119.
RHR S E R V I C E WATER PUMP l E l l - ~ 0 0 1 ~ / ~ / ~ / ~
SEISMIC
I. BODY
- 2. BODY COVER
- 3. COVER GASKET
- 4. STUD
- 5. NUT
- 6. BASKET
- 7. VENT COCK
- 8. L I F T RING
- 9. DRAIN PLUG
- 10. BASKET RIM LOCK I I . .NUT R U k S E R V I C E W A T E R STRAINER I t l l - DOOZA/k I ELI- P @ 3 A / &
REF. DWG. :PLANT SERVICE WATER PUMP DWG. S52586 P,S.W PUMP OPERATING &
MAINTENANCE MANUAL SX-11120, P L A N T S E R V I C E WATER PUMP 1P41-COOlA/B/C/D
. -
- -. - -
SEISMIC SUPPORT - - ..
-PLANT S E R V I C E WA7ER.STRAlU E R I P4I-DIO3NB
HATCH UNIT 1 FOURTH INTERVAL IS1 PLAN CLASS 1 FIGURES Figure Rev.
No. No. Description A- 1 4 RPV Longitudinal, Circumferential and Nozzle to Vessel Welds A- 1A 2 RPV Bottom Head Meridional, Circumferential and Nozzle Welds A-2 3 RPV Closure Head Meridional, Circumferential and Nozzle-to-Head Welds A-2A 4 RPV Closure Head Stud, Washer, Flange Ligament and Nut Identification A-3 4 Location of Ultrasonic Thickness Measurements of the RPV Closure Head A-4 9 Main Steam in Drywell - Line A A-4A 5 Main Steam in Drywell - Line A A-5 10 Main Steam in Drywell - Line B A-5A 5 Main Steam in Drywell - Line B A-6 9 Main Steam in Drywell - Line C A-6A 4 Main Steam in Drywell - Line C A-7 9 Main Steam in Drywell - Line D A-7A 4 Main Steam in Drywell - Line D A-8 10 Feedwater "A" - Drywell, Steam Chase A-9 9 Feedwater "B" - Drywell A-10 8 Feedwater "A-A" - Drywell A-1 1 8 Feedwater "A-B" - Drywell A- 12 8 Feedwater "B-C" - Drywell A- 13 9 Feedwater "B-D" - Drywell A- 14 8 Main Recirculation Loop "A" - Drywell A- 14A 1 Main Recirculation Loop "A" - Drywell HI CL.ASS I FIGURES.COM Page 1 of 3
HATCH UNIT 1 FOURTH INTERVAL IS1 PLAN CLASS 1 FIGURES Figure Rev.
No. No.
Main Recirculation Loop "A" - Drywell Main Recirculation Loop "B" - Drywell Main Recirculation Loop "B" - Drywell Main Recirculation Loop "B" - Drywell Recirculation Manifold "A" - Drywell Recirculation Manifold "B" - Drywell Recirculation Risers Loop "A" - Drywell Recirculation Risers Loop "B" - Drywell Recirculation Pumps Loops 1 and 2 - Drywell RHWILPCI Return - Drywell and East Pen. Room RHWILPCI Injection - Drywell and East Pen. Room RHR Discharge - Drywell and East Pen. Room Head Spray - Drywell and 185' Rx Bldg.
Head Spray - Refueling Floor Core Spray A - Drywell and 158' Rx.
Core Spray B - Drywell and RWCU Hx Room HPCI Steam Supply - Drywell and East Pen. Room HPCI Discharge to Feedwater - Main Steam Chase and Torus Bays 1 and 2 HPCI Discharge to Feedwater - Main Steam Chase RCIC Steam Supply - Drywell and Steam Chase H I CLASS I FIGURES.COM Page 2 of 3
HATCH UNIT 1 FOURTH INTERVAL IS1 PLAN CLASS 1 FIGURES Figure Rev.
NO. No. Description A-3 1 8 RCIC Discharge to Feedwater A-32 8 Reactor Water Cleanup System - Drywell and RWCU Hx Room A-3 3 7 Reactor Water Cleanup Inlet - Main Steam Chase A-34 2 CRD Weld and Flange Bolting A-3 5 2 Drywell Penetrations A-3 6 1 Reactor Stabilizer Attachment A-37 1 RPV Support Skirt Attachment A-3 8 2 Stand-by Liquid Control Penetration: X Reactor Bldg. Across From Decon.
Room A-3 9 1 Jet Pump Instrumentation Nozzle - Reactor Vessel A-40 0 2" Bottom Head Drain A-4 1 0 2" Bottom Head Drain A-42 0 N 16A&B Instrumentation Nozzle Detail A-43 0 2" Recirc. Piping Drains A-44 0 SBLC Piping and Nozzle A-45 0 SBLC Piping Page 3 of 3
0" 270" 180" 90" 0" 203'-1 1 '
I 150' 30. fc-1 202'-1' u u C-2 189'-7' I
4 7
'
SECTION 'A-A' " C-3 177'-I' I 30' I ma TYP. LONGITUDINAL VELD
- TOP OF 1 7 3 ' - 4 '
FUEL
?' :
TYP. CIRCUKERENTIAL WELD ?' T'u u C-4 164'-6' NOTEtTHIS DWG.
SHOWS LOCATION OF - BOTTOM 160'-11' NOZZLES.SAFE ENDS FOR NOZZLES NIO.NI IA.NI I B . N N12A,N12BeN16A
& N16B ARE NOT SHOWN.
EDWIN I. HATCH U N I T I RPV LONGITUDINAL.CIRCUMFERENTIAL AND NOZZLE TO VESSEL WELDS 4 &- !0-81 BKG cud) fl% FIGURE A - l m e MlE IV W'D M.1
EDWIN I. HATCH UNIT I RPV BOTTOM HEAD MERIDIONAL.
CIRCUMFERENTIAL AND NOZZLE WELDS 2 8 - J o - B I BKG CUR Ma FIGURE A - 1 A RV. MTe W Or'O -.I
0" PLANT NORTH
-
LIFTIN6 270' 1 80" EDWIN I. HATCH UNIT I RPV CLOSURE HEAD MERIDIONAL.
CIRCUMFERENTIAL AND NOZZLE-TO-HEAD WELDS FIGURE A-2 3 8-IQ-81 BKG CVD F/1B rW. DIR W OI'D m.