ML13344B147

From kanterella
Revision as of 10:32, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Initial Exam 2013-301 General Correspondence
ML13344B147
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/30/2013
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
50-261/13-301
Download: ML13344B147 (4)


Text

( DUKE Sharon A.

H. B. Robinson Steam ManagerEpS ENERGY, Duke Energy Progress 3581 West Entrance Road Q Hartsville, SC 29550 0:8438571584 F: 843 857 1319 Sharon. WheeleKiJuke-energy.con 10 CFR 55.40 Serial: RNP-RA/1 3-0040 JUN 142013 Mr. Richard S. Baldwin Chief Examiner, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II

-

Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS

Dear Mr. Baldwin:

In accordance with the guidelines in Revision 9, Supplement 1 of NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Duke Energy Progress, Inc. formerly known as Carolina Power and Light Company, is providing the enclosed operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201, Reference Material Guidelines For Initial Licensing Examinations, for examinations scheduled to begin the week of July 29, 2013.

As required by Attachment 1 of Revision 9, Supplement 1, of NUREG-1 021, Section ES-201, Examination Security and Integrity Considerations, please ensure that these examination materials are withheld from public disclosure until after the examinations are complete.

If you have any questions concerning this matter, please contact Mr. James Conder at (843) 857-1656.

Sincerely, Sharon Wheeler-Peavyhouse Manager Support Services Nuclear

-.

SWP/cac 0 Enclosure

United States Nuclear Regulatory Commission Serial: RN P-RAIl 3-0040 Page 2 of 2 C: Document Control Desk (wlo Enclosure)

NRC Resident Inspector, HBRSEP (wlo Enclosure)

Mr. V. McCree, NRC, Region II (w/o Enclosure)

Ms. Araceli Billoch Colon, NRC (w/o Enclosure)

Mr. M. T. Wdmann, NRC, Region II (wlo Enclosure) 0

Sharon A. Wheeler-Peavyhouse H. 8. Robinson Steam Electdc Plant Unit 2 ENERGY Manager Support Services Duke Energy Progress 3581 West Entrance Road HartswilIe, SC 29550 G 843 857 1584 F: 843 857 1319 Sharon. Wheekiaduke-energy.co,,

10 CFR 55.40 Serial: RN P-RAIl 3-0039 NAY 0 92013 Mr. Richard S. Baldwin Chief Examiner, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II

-

Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES

Dear Mr. Baldwin:

In accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors Duke Energy Progress, Inc., formerly known as Carolina Power and Light Company, is providing the enclosed outlines for examinations scheduled to begin the week of July 29, 2013.

Pursuant to 10 CFR 55.40(b)(3), Mr. James Conder, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.

As required by Revision 9, Supplement 1, of NUREG-1 021, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete.

If you have any questions concerning this matter, please contact Mr. James Conder at (843) 857-1656.

Sincerely, Sharon Wheeler-Peavyhouse Manager Support Services Nuclear

United States Nuclear Regulatory Commission Serial: RN P-RAIl 3-0039 Page 2 of 2 C CAC Enclosure c: Document Control Desk (wlo Enclosure)

NRC Resident Inspector, HBRSEP (wlo Enclosure)

Mr. V. McCree, NRC, Region II (wlo Enclosure)

Ms. Araceli Billoch Colon, NRC (wlo Enclosure)

Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)