MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
SEn tergy Entergy Nuclear Operations, Inc.
600 Rocky Hill Road Plymouth, MA 02360 Pilgrim Nuclear Power Station December 31, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35
REFERENCES:
- 1. Letter, D. S. Morris, United States Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service, to A. S. Imboden, Chief, Environmental Review and Guidance Update Branch, U.S. Nuclear Regulatory Commission, Pilgrim Nuclear Power Station, May 17, 2012.
- 2. Letter, J. K. Bullard, United States Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service, to A. Hull, Acting Chief, Environmental Review and Guidance Update Branch, U.S. Nuclear Regulatory Commission, Pilgrim Nuclear Power Station, April 24, 2013.
LETTER NUMBER: 2.13.102
Dear Sir or Madam:
On May 17, 2012, the National Marine Fisheries Service (NMFS) issued Reference 1, a consultation letter, which concluded that the continued operation of the Pilgrim Nuclear Power Station (Pilgrim) under the terms of a renewed license is not likely to adversely affect any listed species under NMFS jurisdiction. The letter further concluded that the continued operation of Pilgrim will have no effect on the right whale critical habitat.
Reference 1 further stated, erroneously, that:
"As a condition of their existing license, Entergy must report to NRC any observations of listed species."
There are no current conditions of the Pilgrim Operating License that require reporting of such observations. Pilgrim continues to conduct environmental monitoring under its National Pollutant Discharge Elimination System (NPDES) permit, which includes impingement and entrainment monitoring. Although the current scope of monitoring does not specifically address listed species, Pilgrim recognizes the appropriateness of promptly reporting to NMFS any observed incidental taking of an endangered marine species. Any such report would then be
PNPS Letter 2.13.102 Page 12 reported to NRC in accordance with 10 CFR 50.72(b)(2)(xi), News Release or Notification of Other Government Agency.
In Reference 2, NMFS recognized the erroneous statement in its consultation letter and requested that the NRC require the reporting of observations of listed species. Pilgrim is not aware of any basis for imposing such a requirement. There is no indication of any incidental taking of an endangered species having resulted from Pilgrim's operation over the last forty years. Further, both NMFS and NRC have determined that any impact on an endangered species is unlikely.
Nevertheless, Pilgrim will be supplementing the plant's environmental monitoring to include reporting of any confirmed sightings of listed whales in the vicinity of Pilgrim Station. This would combine an opportunistic whale sighting by qualified individuals at the site with assistance from an outside organization with expertise in the identification of whale species. A representative description of this protocol, which is currently being proceduralized, is provided as Attachment 1.
This letter contains one new regulatory commitment, which is identified in Attachment 2 to this letter.
Please do not hesitate to contact Mr. Joseph R. Lynch, (508) 830-8403, if there are any questions regarding this submittal.
Sincerely, David N es Director, Regulatory and Performance Improvement Attachment 1: Representative Description of Whale Sighting Protocol Attachment 2: Pilgrim Nuclear Power Station List of Regulatory Commitments.
PNPS Letter 2.13.102 Page I 3 cc: Mr. William M. Dean Ms. Nadiyah S. Morgan, Project Manager Regional Administrator, Region 1 Division of Operating Reactor Licensing U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 2100 Renaissance Blvd., Suite 100 U.S. Nuclear Regulatory Commission King of Prussia, PA 19406-2713 Mail Stop O-8-F2 11555 Rockville Pike Rockville, MD. 20852 USNRC Senior Resident Inspector Pilgrim Nuclear Power Station
ATTACHMENT 1 PNPS Letter 2.13.102 Pilgrim Nuclear Power Station (PNPS)
REPRESENTATIVE DESCRIPTION OF WHALE SIGHTING PROTOCOL
Pilgrim Station "Whale Sighting Protocol" 12/31/2013 Security Officer or other qualified employee Initial Whale Sighting- determines that there is a whale sighting in the Notify Control Room. I vicinity of Pilgrim Station. Control Room is contacted immediately.
Control Room then calls cognizant Entergy Control Room contacts individual to permit Whale Expert's access to cognizant Entergy the site.
individual.
Whale Expert contacted Entergy initiates immediate verbal contact with Whale Expert and arranges for priority site visit.
to prompt site visit.
Whale Expert visitor escorted to the shorefront Whale Expert escorted for whale observation.
into OCA to confirm This independent confirmation of the whale whale sighting. observation is critical.
If possible, Whale Expert identifies the species If possible, Whale Expert of whale(s). Determination then made whether then identifies the or not species is "Listed" (if on list of whale(s) and determines Endangered or Threatened species).
if species is "Listed".
Control Room is promptly informed of whether or Whale Expert informs not whale(s) could be identified and, if so, Control Room whether whether species is "Listed". If whale is found to sighting was of "Listed be a "Listed" species then this observation must Whale" or not. be reported to NRC and NMFS (National Marine Fisheries Service).
If this whale sighting is determined to be Ifreportable, Control reportable then Operations completes a 4-hour Room notifies NRC. notification to NRC per 10CFR50.72(b)(2)(xi).
Whale Expert reports sighting of "Listed Whale" If reportable, Whale to NMFS.
Expert notifies NMFS of "Listed Whale" sighting.
Pertinent information and actions are Follow up actions and documented in a condition report. Any documentation appropriate internal notifications and actions are performed. performed. Site maintains surveillance.
ATTACHMENT 2 PNPS Letter 2.13.102 Pilgrim Nuclear Power Station (PNPS)
LIST OF REGULATORY COMMITMENTS
List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
/i .. .. ~ TYP*E TPek OSCHEDULED
.. , ,*:... .
S(Check One) COMPLETION DATE COMMITMENT ONE- CONTINUING TIME COMPLIANCE (If Required)
A.TION ACTION Entergy commits to supplement its existing March 1, 2014 environmental monitoring program to include any potential whale sightings in the vicinity of Pilgrim Station.