MONTHYEARML24270A0652024-09-26026 September 2024 ABWR Design Certification Annual 10 CFR 50.46 Report for 2024 ML23277A1692023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ABWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML20269A1842020-09-25025 September 2020 ABWR Design Certification Annual 10 CFR 50.46 Report for 2020 ML20076D9632020-03-16016 March 2020 GE Hitachi Nuclear Energy, Transmittal of ABWR Standard Plant Design Certification Renewal Application Design Control Document Revision 7, Chapter 5 ML20129J8972019-10-31031 October 2019 ABWR DC Renewal Supplemental FSER Appendix E Report by Advisory Committee on Reactor Safeguards ML19171A2912019-06-27027 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18b for Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis ML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19164A0352019-06-20020 June 2019 Letter to Applicant - GEH ABWR DC Renewal Section 1 Introduction and General Discussion ML19162A0802019-06-19019 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 09 Section 6.2.1.9 ECCS Strainers ML19113A1732019-06-19019 June 2019 ABWR DC Renewal SER Section 3.2.3 Safety Classifications Pointer SER Rev 4 ML19114A3532019-06-19019 June 2019 ABWR DC Renewal SER Section 9.1.3 Fuel Pool Cooling and Cleanup System Pointer SER Rev 4 ML19148A4632019-06-19019 June 2019 ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications Revision 3 ML19148A7802019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 7.4.1.4.4 Shutdown Panel Inst Rev 4 ML19148A4612019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications ML19155A2102019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 38 Section 6.3 Emergency Core Cooling Systems ML19156A1512019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18a for Section 4.2 Rx LOCA and Seismic Load ML19156A1802019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 19 & 20 for Section 9.1.2.1 New and Spent Fuel Storage ML19141A3712019-06-0606 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SE for Section 22 Fukushima Design Related Changes ML19113A1762019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 3.2.3 Safety Classifications Revision 0 ML19148A5152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7 Residual Heat Removal System ML19148A5932019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7.1.1.10 Aciwa ML19148A7782019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 7.4.1.4.4 Shutdown Panel ML19149A3152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 8.3.4.4 Class 1E Bus Isolation ML19114A3512019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 9.1.3 Fuel Pool Cooling and Cleanup System Revision 0 ML19114A3382019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 7.5.2.1 Post Accident Monitoring Revision 0 ML19142A1862019-05-31031 May 2019 GE Hitachi Nuclear Energy U. S. Advanced Boiling Water Reactor Design Certification Renewal Schedule Letter, May 2019 ML18164A1092019-02-0404 February 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 6.2.1 ML18234A4312019-02-0404 February 2019 Letter Safety Evaluation with No Open Items GEH ABWR DC Renewal Subsection 6.2.1.6 ML19002A3912019-01-15015 January 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3.17 ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18346A5612018-12-19019 December 2018 Letter to Applicant - GEH ABWR DC Renewal Issue 10 SE for Section 5.4.8 ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18275A1772018-11-15015 November 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 19.5 ML18200A3192018-07-26026 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 3.7.3 ML18183A4322018-07-12012 July 2018 Advanced Boiling-Water Reactor Design Certification Renewal Application - Safety Evaluation with No Open Items for Section 9.1.4, Light Load Handling System ML18183A3712018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.1 ML18183A4172018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.5 ML18176A1442018-06-28028 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 13 ML18176A1432018-06-27027 June 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 13.5 ML18155A2122018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 2.3 Meteorology ML18155A2352018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.3 Severe Wind and Extreme Wind (Tornado and Hurricane) Loadings ML18155A2902018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.5.1.4 Missiles Generated by Natural Phenomena ML18114A0362018-05-0202 May 2018 Letter - Advanced boiling-Water Reactor Design Certification Renewal Application Safety Evaluation with No Open Items for Section 5.2.5, Reactor Coolant Pressure Boundary Leakage Detection ML18088A2222018-04-10010 April 2018 Letter Safety Evaluation with No Open Items for Section 13.3, Emergency Planning. ML18059A3422018-03-0808 March 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.5.1 Final ML17097A4702018-02-0202 February 2018 GE Hitachi Nuclear Energy - U.S. Advanced Boiling-Water Reactor Design Certification Renewal Application, Closure of Design Items 14, 15, 16, 21, 24 and 25 ML18029A2602018-02-0101 February 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 12 ML16341A8122016-12-0606 December 2016 GE Hitachi Advanced Boiling Water Reactor Design Certification Renewal Application, Actions Regarding Resolution of Item #26; Fukushima Recommendation 4.2, Mitigating Strategies ML16299A1472016-10-25025 October 2016 GE-Hitachi Nuclear Energy - Supplement 1 to Proposed Resolution of Items #18b, 19 and 20 of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes 2024-09-26
[Table view] |
Text
May 31, 2019 Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE Hitachi Nuclear Energy 3901 Castle Hayne Road MC A-18 Wilmington, NC 28401
SUBJECT:
GE-HITACHI NUCLEAR ENERGY - UNITED STATES ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL REVIEW SCHEDULE
Dear Ms. Catts:
In a letter dated December 7, 2010, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110040176) GE-Hitachi Nuclear Energy (GEH) submitted a Design Certification (DC) Renewal application for the U.S. Advanced Boiling-Water Reactor (ABWR) pursuant to the requirements of Subpart B, Standard Design Certifications, of Title 10 of the Code of Federal Regulations Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants. On February 19, 2016 (ADAMS Accession No. ML16081A268), you submitted a revision to the application to incorporate proposed design changes identified following responses to the U.S. Nuclear Regulatory Commission (NRC) staffs requests for additional information (RAIs) and public meetings with the staff.
The NRC staff issued a delay in its review schedule in a letter dated August 3, 2017 (ADAMS Accession No. ML17199G648), which was a follow up to a schedule letter dated August 30, 2016 (ADAMS Accession No. ML16209A316). The NRC review schedule was delayed based on resolving certain open items (OIs) that had remained unresolved as of January 2017. The NRC was not able to meet the schedule outlined in the August 30, 2016, letter projecting the completion of the NRC staff review and its final safety evaluation report of March 2018.
GEH in a letter dated January 21, 2019 (ADAMS Accession No. ML19021A015), provided the NRC staff with the final OI RAI response and the associated proposed changes to the ABWR Design Control Document, Revision 6 for the Peak Cladding Temperature issue. Therefore, the NRC staff projects the completion of the ABWR DC Renewal Advanced Final Safety Evaluation Report by the end of June 2019. The Advisory Committee on Reactor Safeguards (ACRS) Sub-Committee meeting has been scheduled for August 20, 2019 with an ACRS Full-Committee meeting scheduled for some time in October 2019.
In addition, in order for the NRC to fulfill its obligations under the National Environmental Policy Act, the agency will prepare an environmental assessment (EA) for the renewal application.
The EA will be an enclosure to the rulemaking package and will align with the rulemaking preparation schedule.
M. Catts If you have any questions or comments concerning this matter, please contact the lead project manager, James Shea at 301-415-1388 or via e-mail address at James.Shea@nrc.gov.
Sincerely,
/RA/
Robert M. Taylor, Director Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No.: 52-045
Enclosure:
As stated cc w/encl.: See next page
ML19142A186 NRO-002 OFFICE PM:DLSE LA:DLSE BC:DLSE (Acting) D:DLSE NAME JShea SGreen JRankin RTaylor (ABradford for)
DATE 5/22/19 5/23/2019 5/23/2019 5/31/2019
GE Hitachi Nuclear Energy - US ABWR Design Certification Renewal Application Review Milestones Key Safety Review Milestones Current Completion Date Target - T Phase 1 - Requests for Additional Information (RAIs) 01/2019 - C and Supplemental RAIs Phase 2 - Supplemental Safety Evaluation Report 06/2019 - T (SER) without Open Items Advanced Final Safety Evaluation Report (AFSER)
Phase 3 - Advisory Committee on Reactor Safeguards 10/2019 - T Review of AFSER Phase 4 - Final Supplemental Advanced Boiling-Water 03/2020 - T Reactor Renewal SER Enclosure
DC GEH - ABWR Mailing List (Revised 08/16/2018)
Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) brianr.johnson@ge.com (R. R. Johnson)
Christopher.Powell@ge.com (Christopher Powell) cschlaseman@mpr.com (Caroline Schlaseman)
CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis)
F.Shahrokhi@areva.com (Farshid Shahrokhi)
George_Stramback@Charter.net (George Stramback) jerald.head@ge.com (Jerald G. Head)
Joseph.Ondish@ge.com (Joseph Ondish)
Joseph_Hegner@dom.com (Joseph Hegner)
Kenichi.Sato.sz@hitachi.com (Kenichi Sato)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh)
Linda.Dolan@ge.com (Linda Dolan) lon.burnam@house.state.tx.us (Lon Burnam)
Maryann.Herzog@ge.com (Maryann Herzog) media@nei.org (Scott Peterson)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette)
RJB@NEI.org (Russell Bell) rtrench@mpr.com (Randy Trench)
Ryan.hough@ge.com (Ryan Hough) sabinski@suddenlink.net (Steve A. Bennett) tom.miller@hq.doe.gov (Tom Miller) trsmith@winston.com (Tyson Smith)
Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino)
Page1 of 1