Revised Implementation Date for License Amendment Request for Proposed Changes to Technical Specification 3.3.6.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1
ML091320471
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/24/2009
From: Gambhir S
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-09-072, TAC MD9598
Download: ML091320471 (2)


Text

Sudesh K. Gambhir Vice President, Technical Services ENERGY P.O. Box 968, Mail Drop PE04 Richland, WA 99352-0968 Ph. 09-77-313F.

509-377-2354 sgambhir@energy-northwest.com April 24, 2009 G02-09-072 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 REVISED IMPLEMENTATION DATE FOR LICENSE AMENDMENT REQUEST FOR PROPOSED CHANGES TO COLUMBIA TECHNICAL SPECIFICATION 3.3.6.1; CHANGE GROUP 1 PRIMARY CONTAINMENT ISOLATION VALVES REACTOR WATER LEVEL ISOLATION SIGNAL FROM LEVEL 2 TO LEVEL I (TAC NO. MD9598)

Reference:

Letter G02-08-124, dated September 9, 2008, SK Gambhir (Energy Northwest) to NRC, "License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.6.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1"

Dear Sir or Madam:

The purpose of this letter is to provide notification that Energy Northwest intends to modify the planned implementation period of the referenced license amendment request currently under staff review.Energy Northwest proposes that the implementation period for this license amendment be such that implementation will be completed prior to entry into Mode 2 during startup from Refueling Outage 20, currently scheduled to begin in April 201 1. The change is being made to provide sufficient time for planning and preparation to ensure the implementation is performed safely and effectively.

Implementation of this license amendment request is a major project involving physical changes to plant equipment and will require extensive planning and coordination.

A refueling outage is the only planned outage of suitable length to enact the required physical changes.This change to the implementation date does not affect the conclusion of the license amendment application that the proposed changes do not involve a significant hazards consideration and do not have an adverse effect on nuclear safety.

REVISED IMPLEMENTATION DATE FOR LICENSE AMENDMENT REQUEST FOR PROPOSED CHANGES TO COLUMBIA TECHNICAL SPECIFICATION 3.3.6.1;CHANGE GROUP 1 PRIMARY CONTAINMENT ISOLATION VALVES REACTOR WATER LEVEL ISOLATION SIGNAL FROM LEVEL 2 TO LEVEL 1 (TAC NO.MD9598)Page 2 This document contains no regulatory commitments.

If you have any questions or require additional information, please contact MC Humphreys at (509) 377-4025.I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.Re ectfully, SK Gambhir Vice President, Technical Services cc: EE Collins, Jr. -NRC RIV CF Lyon -NRC NRR NRC Senior Resident Inspector/988C RN Sherman -BPA/1 399 WA Horin -Winston & Strawn