ML11203A360

From kanterella
Revision as of 14:06, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Final Status Survey Report, Attachment 8, Hot Laboratory (Building 1112), for the Plum Brook Reactor Facility, Licenses Nos. TR-3, Docket No. 50-30 and R-93, Docket No. 50-185
ML11203A360
Person / Time
Site: Plum Brook
Issue date: 07/19/2011
From: Peecook K
US National Aeronautics & Space Admin (NASA)
To:
Document Control Desk, NRC/FSME
References
Download: ML11203A360 (2)


Text

National Aeronautics and Space Administration John H. Glenn Research Center U Lewis Field Plum Brook Station Sandusky, OH 44870 July 19, 2011 Reply to Attn of: QD U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Final Status Survey Report, Attachment 8, Hot Laboratory (Building 1112), for the Plum Brook Reactor Facility, Licenses Nos. TR-3, Docket No. 50-30 and R-93, Docket No. 50-185 Enclosed for your review is Attachment 8 to the Final Status Survey Report supporting eventual termination of the licenses for the Plum Brook Reactor Facility.The complete Final Status Survey Report will consist of a series of Attachments, each addressing an individual survey area or group of survey areas or environmental areas as described in our NRC approved Final Status Survey Plan. The final submission will be the main body of the Final Status Survey Report which will consolidate and summarize the details presented in the Attachments.

This Attachment addresses the Final Status Survey of the Hot Laboratory Building.

It supports our conclusion that radiological remediation of the building has been completed and the area meets the criteria for unrestricted release specified in 10 CFR 20.1402.Should you have any questions or need additional information, please contact me a NASA Plum Brook Station, 6100 Columbus Avenue, Sandusky, Ohio 44870, or by telephone at (419) 621-3277.Keith M. Peecook NASA Decommissioning Program Manager H (C A . Plum Brook Reactor Facility Final Status Survey Report, Attachment 8, Hot Laboratory (Building 1112), revision 0, dated July 18, 2011.cc: USNRC/C. J. Glenn (FSME)USNRC/J. Webb (FSME)USNRC/J. Tapp RIII/DNMS/DB ODH/M. J. Rubadue