ML17208A559

From kanterella
Revision as of 01:22, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Application for Amend to License DPR-67 to Allow Greater Flexibility in Surveillance of Turbine Driven Auxiliary Feedwater Pump During Startup
ML17208A559
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/05/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A560 List:
References
L-80-138, NUDOCS 8005090424
Download: ML17208A559 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8005090424 DOC,DATE: 80/05/05 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucia Plantr Unit AUTH ~ NAME AUTHOR AFFILIATION li Florida Power 8 Light Co. 05000335 UHRIGg R ~ E, Florida Power 8, Light Co, REC IP, NAME RECIPIENT AFFILIATION

SUBJECT:

Application for proposed amend to License DPR-67 to allow NDTEg:

auxiliary feedwater pump during startup.

DISTRIBUTION CODE: A001S TITLE: General hQ CH G CIC +

COPIES RECEIVED:LTR Distribution Pg QQ Q~Q

/, ENCL/ /:/~

greater flexibility in surveillance of turbine driven SIZE:

for after Issuance of Operating Lic RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME ID CODE/NAME LTTR ENCL

~P ~~/

LTTR ENCL ACTION: 05 BC 7 7 INTERNAL: REG E 1 1 02 NRC PDR 2  ? 15 CORE, PERP BR 17 ENGR BR 18 REAC SFTY BR 19 PLANT SYS BR 1 1 20 EEB 21 EFLT TRT SYS 1 1 EPB~DOR OELD 1 0 STS GROUP LEADR EXTERNAL: 03 LPDR 1 1 04 NSIC 23 ACRS 16 16

~v >a t980 TOTAL NUMBER OF COPIES REQUIRED t LTTR 38 ENCL 37

1 t'

II V

1' V L

lt 'h l h N' h

II 1

1 R

r fl

8QQS Q Q Q+g / PO.BOX525100MIAMI.FL33152 I

FLORIDA POWER & LIGHT COMPANY tray 5, 1980 L-80-138 Di rector of Nuc 1 ear Reactor Regulation Attention: t1r. Darrell G. Eisenhut, Director Division of Project Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Nr. Eisenhut:

Re: St. Lucie Unit 1 Docket No. 50-335 Proposed Amendment to Faci lit 0 eratin License DPR-67 In accordance with 10 CFR 50.30, Florida Power 8 Light Company submits herewith three (3) signed originals and forty (40) copies of a request to amend Appendix A of Facility Operating License DPR-67.

The proposed amendment is described below and shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.

Pa e 3/4 7-4 A footnote is added to Specification 4.7. 1.2.a.2.(b) to allow greater flexibility in the surveillance of the turbine driven auxiliary feedwater pump during startup. After entering Node 3 (Hot Standby, >325oF) from Node 4 (Hot Shutdown;..<325DF), a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> grace period is established within which the pump must satisfy the discharge pressure requirement.

The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power 8 Light Company Nuclear Review Board. They have concluded that it does not involve an unreviewed safety question.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology Poa!

REU/HAS/ah Attachment cc: J. P. O'Reilly, Region II

,/iself:

Harold F. Reis, Esquire'.

wh/

gP /OOO,OO PEOPLE... SERVING PEOPLE

'I

~