Meeting Agenda for Oconee External Flooding Team Meeting
ML14058A054
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/20/2009
From:
Office of Information Services
To:
Shared Package
ML14055A421 List: ... further results
References
FOIA/PA-2012-0325
Download: ML14058A054 (3)


Text

Oconee Agenda for Team Meeting 04-20-2009.doe Meeting Agenda for Oconee External Flooding Team Meeting April 2 0 th, 2009 9b)(6)Bridge Line for meetings:

888-889-0760, Pass code 1. Status of the letter to Duke. Issuance TBD. Response to M. Galloway non-concurrence in process.2. Discussion by Jeff Mitman and Andy Hutto of review of Duke mitigation strategy.3. Discussion by Jeff Mitman of relative risk reduction of various modifications compared to addressing external flooding.4. Actions Item Old Actions Due date Responsibility Status Comments No.Complete basis for continued operation:

Ae 01 Need to determine appropriate means to 223/09 Antonios In concurrence DRA and DE have concurred.

Obtaining DORL concurrence.

document Write discussion describing NRC 2 NRO has committed to complete week of4320. Availability 02a independent review of breach size 2/17/09 Melanie G. Near completiondelay Draft to be placed in SharePoint.

08 Finalize document to Duke, coordinate with 449 Management Currently with Expected issuance 4/.?./2009 with heads up phone call to team and OE, OGC ?? Management Duke. ML090570779 Define relative risk reduction of various D0fmodificationsk c preductinof vaddreuss 4 .9 Rogers and Drafted Revision nearly complete.

Expected to be on Sharepoint by 10 modifications compared to addressing Draftedf M 424 external flooding 41110109 Jeff M. 4/i4.APP, Interagency Agreement, and Task Order in order to 15 Initiate conactor relatioship and assign 2/2/09 Kamal, Raman Drafted obtain USBR's support to review the Jocassee Dam a sinundation studies, etc. is now with PMDA for issuance.16 Complete Dec. 4 meeting summary 2/23/09 John Drafted Completed and placed in Adams. One correction need -to be revised, 17 Complete Q&A 2/9/09 Jeff C. Drafted One-pager for ET Meeting. Several already drafted.1 C l Q2 0 eRemainder to be completed by April 23, 2009.18 Complete PRA discussion 2W Jeff M. Drafted Revised.3/13/09 Meeting currently scheduled for May 11, 2009. Licensee wants to discuss licensing basis. Will seek further 21a Duke presentation to HQ on HEC-RAS Week of DORL In planning clarification at 4/22 status call with Duke. Our approach is on model results 5/1/09 adequate protection rather than licensing basis. Need to develop opening talking points for J. Grobe.22 .Backfit Analysis Jff C. Drafted Meeting planned with OGC (Cathy Marco and Kimberly 22 __Backfit__Analysis__

3/13/09 1effC. Drained Sexton) on April 23,2009.Page I of 3 Oconee Agenda for Team Meeting 04-20-2009.doc Received from Duke 3/5. Reviewed and comments collated with first-cut estimated failure probability of .9. On SharePoint.

New Actions Due date Owner Status Parking Lot Actions Due date Owner Status Current Plan is still applicable.

No change necessary until 20 Update cotnnunication plan John, Melanie W. Paused lcne epnst urn etrbigdald" licensee responds to current letter being drafted.21 Site visit and audit to inspect dam and its After licensee responds to our next letter documentation on relevant technical issues Completed Actions Due date Owner Status Obtain consensus understanding of NRC V" Ken, Kamal, Raman, Consensus not yet Potential insights from item I5 may be helpful in resolving.

02 view of breach size-inadequacy of 575' 4 Bradley, others? obtained and assessed adequacy of 900-1100' 2/20/09 Assess and document evaluation associated Ken, Jim, Jeff C., Completed; Duke did not use Weather Service precipitation; did not 03 with overtopping and remaining questions of 1/13/09 documentation account for saturated soil; and appeared not to use sufficient Duke others? combined with 02a curve depicting runoff. Follow up with FERC anticipated on I __ PMF calculations.

Summarize key statements rom applicable V" Completed, In SharePoint and emailed to all division for review and 04 guidance 1/28/09 Fernando awaiting comment.guidance 1/28/09comments.

cmet Assess applicable guidance from referenced 05 ANSI1/13/09 Fernando Completed 06 Finalize questions in seismic area 1/28/09 Raman, Goutam Completed 06a How to incorporate seismic concerns into 1/23/09 Raman, Goutam Completed Questions dropped from letter.next Duke written communication Engage FERC on breach size information to 07 further understand their process and needs 1/12/09 Melanie G., Dave Completed and why our needs while different do not conflict with theis_Ken S. talked to Ken F. of FERC. Provide Ken's report on 07a Ken to follow-up at staff level with Ken 2 Ken Completed this and items 2a and 3 to DE for review. To be placed in Fearon of FERC 2/20/09 SharePoint 0Th Call with Duke to follow-up on curve V"30,09 Ken Cancelled Concerns not incorporated into current letter version number 2/20/09 09 Provide list of Oconee's B.5.b actions 40M Jeff C. Completed 2/9/09 I1I Understand information in ANS/ANSI 2.8 1/30/09 Fernando, Bradley, Completed_____ Rarnan, Ken________

_______________________

Page 2 of 3 p .* .Oconee Agenda for Team Meeting 04-20-2009.doc, 12 Reengage DPR to draft adequate protection 1/26/09 Melanie G. Completed backfit write-up 1_26/09_MelanieG._Completed 13 Complete list of remaining questions which 13 need to be answered by Duke (see item 06) 1/30/09 Ken, Raman, Goutam Completed 14 Schedule failure modes call with licensee 1/30/09 John, Jim Vail Complete Call completed 19 Determine if second letter or DFI is correct Completed 19___ next approach Completed Other Items , RES is working with NRO and NRR to revise RG 1.59. They plan to have a working draft by the end of March. This has no affect on the OFI.* Information Notice being provided to DPR on IPEEE dam failure rate calculations.

DPR provided comments.

DRA revising to be sent back to DPR WHEN??.Attended by Melanie Galloway -DRA Jeff Circle- DRA Fernando Ferrante -DRA Jeff Mitman -DRA Jim Vail- DRA Antonios Zoulis -DRA Dave Skeen -DE Kamal Manoly -DE Raman Pichumani

-DE Juan Uribe -DE Meena Khanna -DE Melanie Wong -DORL John Stang- DORL Ken See- NRO Goutam Bagchi -NRO Robert Carroll -Rll DRP Bradley Davis -RII DCI Walt Rogers -RII DRS Andy Hutto -RII DRP Eric Riggs -RII DRP Page 3 of 3